220 E 2ND ST 1-104 90012

Certificate Information: 220 E 2ND ST 1-104 90012

Application / Permit
12010-10006-01294
Plan Check / Job No.
B13LA07466
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
PROPOSED STRUCTURAL AND ARCHITECTURAL REVISIONS TO PROJECT PLAN IS UNDER CONST. post tensioned slabs, steel stairs, rails and any other structures on the podium level are not a part of this approval. The holdown anchors shown are not a part of this approval.
Permit Issued
Issued on 8/9/2013
Issuing Office
Metro
Current Status
Permit Finaled on 6/26/2014
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/3/2013 APPLICANT
Assigned to Plan Check Engineer 7/12/2013 JOHN VASQUEZ
Corrections Issued 7/18/2013 JOHN VASQUEZ
Green Plans Picked Up 7/18/2013 APPLICANT
Quality Review Completed 7/22/2013 CHARLES CHANG
Plan Check Approved 8/8/2013 JOHN VASQUEZ
Issued 8/9/2013 LADBS
Permit Finaled 6/26/2014 LESLIE TRUJILLO

Permit Application Clearance Information

Building over 3-story or 36-ft Cleared 7/18/2013 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 7/18/2013 CALOSHA APPROVED
Title 19 building approval Cleared 7/22/2013 GHASSEM NIKKHOO
Project located in CRA area Cleared 7/23/2013 JIM URQUHART
Stormwater Pollution Mitigatn Cleared 7/23/2013 MICHAEL SCADUTO
Green Code Cleared 7/30/2013 DONALD CRICHLOW
ZA Case Cleared 7/31/2013 BRIDGETTE WOOTEN
DAS Clearance Cleared 8/2/2013 EDDIE GARIN
CPC Cleared 8/5/2013 BRIDGETTE WOOTEN
Opn space landscape/Water mgmt Cleared 8/5/2013 BRIDGETTE WOOTEN

Contact Information

Architect Cox, Thomas Phillips; Lic. No.: C10877 19782 MACARTHUR BLVD #300      IRVINE, CA 92612
Contractor Avalonbay Communities Inc; Lic. No.: 719040-B 400 RACE STREET   SUITE 200    SAN JOSE, CA 95124
Engineer Cefali, David Allen; Lic. No.: S3658 4344 LAUREL CANYON BLVD_STE 3      STUDIO CITY, CA 91604
Engineer Vandorpe, Thomas Daniel; Lic. No.: S4611 2200 W ORANGEWOOD AVE #150      ORANGE, CA 92868

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Drywall Nailing 8/13/2013 Partial Approval LEONARD MATCHNIFF
Light Gage Steel Frame 8/13/2013 Partial Approval LEONARD MATCHNIFF
Floor/Roof Diaphrgm/Shear Wall 8/29/2013 Partial Approval LEONARD MATCHNIFF
Floor/Roof Diaphrgm/Shear Wall 9/4/2013 Partial Approval LEONARD MATCHNIFF
Floor/Roof Diaphrgm/Shear Wall 9/6/2013 Partial Approval LEONARD MATCHNIFF
Footing/Foundation/Slab 10/2/2013 Partial Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 10/9/2013 Not Ready for Inspection LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 10/10/2013 Partial Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 10/16/2013 Not Ready for Inspection LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 10/18/2013 Partial Approval LESLIE TRUJILLO
Deputy Wood Construction 10/21/2013 Partial Approval LESLIE TRUJILLO
Deputy Wood Construction 10/24/2013 Partial Approval LESLIE TRUJILLO
Reinforced Concrete Frame 10/24/2013 Partial Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 10/25/2013 Partial Approval LESLIE TRUJILLO
Insulation 10/25/2013 Partial Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 10/28/2013 Partial Approval LESLIE TRUJILLO
Insulation 10/28/2013 Partial Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 10/29/2013 Partial Approval LESLIE TRUJILLO
Insulation 10/29/2013 Partial Approval LESLIE TRUJILLO
Insulation 10/31/2013 Not Ready for Inspection LESLIE TRUJILLO
Wood Frame 10/31/2013 Partial Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 11/1/2013 Partial Approval LESLIE TRUJILLO
Insulation 11/1/2013 Partial Approval LESLIE TRUJILLO
Deputy Wood Construction 11/6/2013 Partial Approval LESLIE TRUJILLO
Deputy Wood Construction 11/7/2013 Partial Approval LESLIE TRUJILLO
Drywall Nailing 11/7/2013 Not Ready for Inspection LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 11/7/2013 Partial Approval LESLIE TRUJILLO
Insulation 11/7/2013 Not Ready for Inspection LESLIE TRUJILLO
Drywall Nailing 11/13/2013 Partial Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 11/13/2013 Partial Approval LESLIE TRUJILLO
Drywall Nailing 4/17/2014 Partial Approval LESLIE TRUJILLO
Pre-Inspection 4/17/2014 Approved LESLIE TRUJILLO
Wood Frame 4/17/2014 Partial Approval LESLIE TRUJILLO
Insulation 4/22/2014 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 4/22/2014 Partial Approval LESLIE TRUJILLO
Wood Frame 4/22/2014 Partial Approval LESLIE TRUJILLO