901 E 12TH ST 90021

Certificate Information: 901 E 12TH ST 90021

Application / Permit
12010-10002-01821
Plan Check / Job No.
B13LA16431
Group
Building
Type
Bldg-Addition
Sub-Type
Commercial
Primary Use
(16) Retail
Work Description
SUPPLEMENTAL TO PERMIT # 12010-10000-01821. Type I A*** fully sprinklered*** Completely new architectural and structural redesign of the building. The new design will have an increase in floor area at: 1) 9764 sq. ft. for a retail basement, 2) 832sq. on the 3rd floor for office and 3) 1119 sq. ft. on the 4th floor for office. New basement storage, incidental to the retail use (thus not count as zoning floor area). A total increase of 14018 sq ft.
Permit Issued
Issued on 1/12/2015
Issuing Office
Metro
Current Status
Issued on 1/12/2015
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 12/27/2013 APPLICANT
Assigned to Plan Check Engineer 1/17/2014 SEAN DANG
Corrections Issued 1/25/2014 SEAN DANG
Disabled Access Plans Picked Up 1/29/2014 APPLICANT
Building Plans Picked Up 2/10/2014 APPLICANT
Green Plans Picked Up 2/10/2014 APPLICANT
Quality Review Completed 7/9/2014 JAMESON LEE
Plan Check Approved 1/12/2015 SEAN DANG
Issued 1/12/2015 LADBS

Permit Application Clearance Information

"D" conditions Cleared 2/24/2014 ANDY RODRIGUEZ
Address approval Cleared 2/24/2014 AVALYN KAMACHI
Eng Process Fee Ord 176,300 Cleared 2/24/2014 AVALYN KAMACHI
Highway dedication Cleared 2/24/2014 AVALYN KAMACHI
Miscellaneous Cleared 2/24/2014 AVALYN KAMACHI
Permit Cleared 2/24/2014 AVALYN KAMACHI
Prkng lot landscape/Water mgmt Cleared 2/24/2014 ANDY RODRIGUEZ
Sewer availability Cleared 2/24/2014 AVALYN KAMACHI
Site Plan review Cleared 2/24/2014 ANDY RODRIGUEZ
Work Adjacent to Public Way Cleared 2/24/2014 AVALYN KAMACHI
Project located in CRA area Cleared 2/26/2014 JIM URQUHART
Hydrant and Access approval Cleared 2/27/2014 JOHN DALLAS
Building over 3-story or 36-ft Cleared 7/17/2014 CALOSHA APPROVED
Green Code Cleared 10/14/2014 RUSSELL KELLY
Roof/Waste drainage to street Cleared 10/22/2014 ARMENIA HERNANDEZ
Stormwater Pollution Mitigatn Cleared 10/22/2014 IDA MEISAMI-FARD
Construction near power lines Cleared 11/3/2014 LUCIO FERRER
Driveway location Cleared 11/5/2014 COLLINS ALLAN
DAS Clearance Cleared 11/13/2014 SEAN DANG
Work Adjacent to Public Way Cleared 12/18/2014 DAVID PEREZ

Contact Information

Architect Khorramian, Abdy; Lic. No.: C13138 4741 LAUREL CANYON RD #202      N HOLLYWOOD, CA 91607
Contractor T C I; Lic. No.: 885187-B 1767 STANDARD AVE      GLENDALE, CA 91201
Engineer Beizai, Vahid Vic; Lic. No.: C43801 1125 EAST BROADWAY 159      GLENDALE, CA 91025
Engineer Salehipour, Sassan A; Lic. No.: GE2579 1290 N LAKE AVENUE #204      PASADENA, CA 91104

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 5/28/2015 Approved WILLIAM THOMPSON
Pre-Inspection 9/9/2015 Partial Approval WILLIAM THOMPSON
Footing/Foundation/Slab 11/24/2015 Partial Approval WILLIAM THOMPSON
Excavation/Setback/Form/Re-Bar 11/25/2015 Partial Approval WILLIAM THOMPSON
Masonry Wall/Backfill 12/8/2015 Partial Approval WINSTON DUNNING
Reinforced Concrete Frame 12/10/2015 Partial Approval WINSTON DUNNING
Reinforced Concrete Frame 12/15/2015 Partial Approval WINSTON DUNNING
Footing/Foundation/Slab 12/24/2015 Partial Approval WINSTON DUNNING
Footing/Foundation/Slab 12/30/2015 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 4/15/2016 Partial Approval LESLIE TRUJILLO
Footing/Foundation/Slab 4/19/2016 Partial Approval WINSTON DUNNING
Footing/Foundation/Slab 6/9/2016 Partial Approval WINSTON DUNNING
Masonry Wall/Backfill 6/22/2017 Partial Approval WINSTON DUNNING
Masonry Wall/Backfill 9/14/2017 Partial Inspection WINSTON DUNNING
Green Building Rough 10/5/2017 Not Ready for Inspection JOHN KLARIN
Masonry Wall/Backfill 10/5/2017 Partial Approval WINSTON DUNNING
Reinforced Concrete Frame 10/5/2017 Partial Approval WINSTON DUNNING
Pre-Inspection 1/26/2018 Partial Inspection WINSTON DUNNING
Reinforced Masonry Frame 1/26/2018 Partial Inspection WINSTON DUNNING
Structural Steel Frame 1/26/2018 Partial Inspection WINSTON DUNNING
Drywall Nailing 1/31/2018 Partial Inspection WINSTON DUNNING
Light Gage Steel Frame 1/31/2018 Partial Approval WINSTON DUNNING
Structural Steel Frame 1/31/2018 Partial Inspection WINSTON DUNNING
Insulation 2/15/2018 Partial Approval WINSTON DUNNING
Drywall Nailing 2/16/2018 Partial Approval WINSTON DUNNING
Drywall Nailing 3/9/2018 Partial Approval WINSTON DUNNING
Insulation 3/9/2018 Partial Approval WINSTON DUNNING
Deputy Steel/Welding 3/19/2018 Conditional Approval WINSTON DUNNING
Insulation 6/13/2018 Partial Approval WINSTON DUNNING
Drywall Nailing 12/5/2018 Partial Approval WINSTON DUNNING
Green Building Rough 12/5/2018 Partial Inspection WINSTON DUNNING
Light Gage Steel Frame 12/5/2018 Partial Inspection WINSTON DUNNING
Structural Steel Frame 12/5/2018 Partial Inspection WINSTON DUNNING
Green Building Rough 12/6/2018 Partial Inspection WINSTON DUNNING
Pre-Inspection 12/6/2018 Not Ready for Inspection WINSTON DUNNING
Green Building Rough 12/11/2018 Partial Inspection WINSTON DUNNING
Pre-Inspection 12/11/2018 Partial Inspection WINSTON DUNNING
Structural Steel Frame 12/11/2018 Partial Inspection WINSTON DUNNING
Interior/Exterior Lathing 1/11/2019 Partial Approval WINSTON DUNNING
Reinforced Concrete Frame 1/11/2019 Partial Approval WINSTON DUNNING
Interior/Exterior Lathing 6/21/2019 Partial Inspection LESLIE TRUJILLO
Interior/Exterior Lathing 7/5/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/7/2020 Conditional Approval LESLIE TRUJILLO
Green Building Final 7/20/2020 Not Ready for Inspection NICK DANERI
Wood Frame 7/22/2020 Partial Inspection NICK DANERI
Special/Order Compliance 6/28/2023 Partial Approval NICK DANERI