901 E 12TH ST 90021
Certificate Information: 901 E 12TH ST 90021
- Application / Permit
- 12010-10002-01821
- Plan Check / Job No.
- B13LA16431
- Group
- Building
- Type
- Bldg-Addition
- Sub-Type
- Commercial
- Primary Use
- (16) Retail
- Work Description
- SUPPLEMENTAL TO PERMIT # 12010-10000-01821. Type I A*** fully sprinklered*** Completely new architectural and structural redesign of the building. The new design will have an increase in floor area at: 1) 9764 sq. ft. for a retail basement, 2) 832sq. on the 3rd floor for office and 3) 1119 sq. ft. on the 4th floor for office. New basement storage, incidental to the retail use (thus not count as zoning floor area). A total increase of 14018 sq ft.
- Permit Issued
- Issued on 1/12/2015
- Issuing Office
- Metro
- Current Status
- Issued on 1/12/2015
- Certificate of Occupancy
- Pending More Information
Permit Application Status History
| Submitted | 12/27/2013 | APPLICANT |
| Assigned to Plan Check Engineer | 1/17/2014 | SEAN DANG |
| Corrections Issued | 1/25/2014 | SEAN DANG |
| Disabled Access Plans Picked Up | 1/29/2014 | APPLICANT |
| Building Plans Picked Up | 2/10/2014 | APPLICANT |
| Green Plans Picked Up | 2/10/2014 | APPLICANT |
| Quality Review Completed | 7/9/2014 | JAMESON LEE |
| Plan Check Approved | 1/12/2015 | SEAN DANG |
| Issued | 1/12/2015 | LADBS |
Permit Application Clearance Information
| "D" conditions | Cleared | 2/24/2014 | ANDY RODRIGUEZ |
| Address approval | Cleared | 2/24/2014 | AVALYN KAMACHI |
| Eng Process Fee Ord 176,300 | Cleared | 2/24/2014 | AVALYN KAMACHI |
| Highway dedication | Cleared | 2/24/2014 | AVALYN KAMACHI |
| Miscellaneous | Cleared | 2/24/2014 | AVALYN KAMACHI |
| Permit | Cleared | 2/24/2014 | AVALYN KAMACHI |
| Prkng lot landscape/Water mgmt | Cleared | 2/24/2014 | ANDY RODRIGUEZ |
| Sewer availability | Cleared | 2/24/2014 | AVALYN KAMACHI |
| Site Plan review | Cleared | 2/24/2014 | ANDY RODRIGUEZ |
| Work Adjacent to Public Way | Cleared | 2/24/2014 | AVALYN KAMACHI |
| Project located in CRA area | Cleared | 2/26/2014 | JIM URQUHART |
| Hydrant and Access approval | Cleared | 2/27/2014 | JOHN DALLAS |
| Building over 3-story or 36-ft | Cleared | 7/17/2014 | CALOSHA APPROVED |
| Green Code | Cleared | 10/14/2014 | RUSSELL KELLY |
| Roof/Waste drainage to street | Cleared | 10/22/2014 | ARMENIA HERNANDEZ |
| Stormwater Pollution Mitigatn | Cleared | 10/22/2014 | IDA MEISAMI-FARD |
| Construction near power lines | Cleared | 11/3/2014 | LUCIO FERRER |
| Driveway location | Cleared | 11/5/2014 | COLLINS ALLAN |
| DAS Clearance | Cleared | 11/13/2014 | SEAN DANG |
| Work Adjacent to Public Way | Cleared | 12/18/2014 | DAVID PEREZ |
Contact Information
| Architect | Khorramian, Abdy; Lic. No.: C13138 | 4741 LAUREL CANYON RD #202 N HOLLYWOOD, CA 91607 |
| Contractor | T C I; Lic. No.: 885187-B | 1767 STANDARD AVE GLENDALE, CA 91201 |
| Engineer | Beizai, Vahid Vic; Lic. No.: C43801 | 1125 EAST BROADWAY 159 GLENDALE, CA 91025 |
| Engineer | Salehipour, Sassan A; Lic. No.: GE2579 | 1290 N LAKE AVENUE #204 PASADENA, CA 91104 |
Inspector Information
| NICK DANERI, (213) 202-5615 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Pre-Inspection | 5/28/2015 | Approved | WILLIAM THOMPSON |
| Pre-Inspection | 9/9/2015 | Partial Approval | WILLIAM THOMPSON |
| Footing/Foundation/Slab | 11/24/2015 | Partial Approval | WILLIAM THOMPSON |
| Excavation/Setback/Form/Re-Bar | 11/25/2015 | Partial Approval | WILLIAM THOMPSON |
| Masonry Wall/Backfill | 12/8/2015 | Partial Approval | WINSTON DUNNING |
| Reinforced Concrete Frame | 12/10/2015 | Partial Approval | WINSTON DUNNING |
| Reinforced Concrete Frame | 12/15/2015 | Partial Approval | WINSTON DUNNING |
| Footing/Foundation/Slab | 12/24/2015 | Partial Approval | WINSTON DUNNING |
| Footing/Foundation/Slab | 12/30/2015 | Conditional Approval | WINSTON DUNNING |
| Deputy Shotcrete | 4/15/2016 | Partial Approval | LESLIE TRUJILLO |
| Footing/Foundation/Slab | 4/19/2016 | Partial Approval | WINSTON DUNNING |
| Footing/Foundation/Slab | 6/9/2016 | Partial Approval | WINSTON DUNNING |
| Masonry Wall/Backfill | 6/22/2017 | Partial Approval | WINSTON DUNNING |
| Masonry Wall/Backfill | 9/14/2017 | Partial Inspection | WINSTON DUNNING |
| Green Building Rough | 10/5/2017 | Not Ready for Inspection | JOHN KLARIN |
| Masonry Wall/Backfill | 10/5/2017 | Partial Approval | WINSTON DUNNING |
| Reinforced Concrete Frame | 10/5/2017 | Partial Approval | WINSTON DUNNING |
| Pre-Inspection | 1/26/2018 | Partial Inspection | WINSTON DUNNING |
| Reinforced Masonry Frame | 1/26/2018 | Partial Inspection | WINSTON DUNNING |
| Structural Steel Frame | 1/26/2018 | Partial Inspection | WINSTON DUNNING |
| Drywall Nailing | 1/31/2018 | Partial Inspection | WINSTON DUNNING |
| Light Gage Steel Frame | 1/31/2018 | Partial Approval | WINSTON DUNNING |
| Structural Steel Frame | 1/31/2018 | Partial Inspection | WINSTON DUNNING |
| Insulation | 2/15/2018 | Partial Approval | WINSTON DUNNING |
| Drywall Nailing | 2/16/2018 | Partial Approval | WINSTON DUNNING |
| Drywall Nailing | 3/9/2018 | Partial Approval | WINSTON DUNNING |
| Insulation | 3/9/2018 | Partial Approval | WINSTON DUNNING |
| Deputy Steel/Welding | 3/19/2018 | Conditional Approval | WINSTON DUNNING |
| Insulation | 6/13/2018 | Partial Approval | WINSTON DUNNING |
| Drywall Nailing | 12/5/2018 | Partial Approval | WINSTON DUNNING |
| Green Building Rough | 12/5/2018 | Partial Inspection | WINSTON DUNNING |
| Light Gage Steel Frame | 12/5/2018 | Partial Inspection | WINSTON DUNNING |
| Structural Steel Frame | 12/5/2018 | Partial Inspection | WINSTON DUNNING |
| Green Building Rough | 12/6/2018 | Partial Inspection | WINSTON DUNNING |
| Pre-Inspection | 12/6/2018 | Not Ready for Inspection | WINSTON DUNNING |
| Green Building Rough | 12/11/2018 | Partial Inspection | WINSTON DUNNING |
| Pre-Inspection | 12/11/2018 | Partial Inspection | WINSTON DUNNING |
| Structural Steel Frame | 12/11/2018 | Partial Inspection | WINSTON DUNNING |
| Interior/Exterior Lathing | 1/11/2019 | Partial Approval | WINSTON DUNNING |
| Reinforced Concrete Frame | 1/11/2019 | Partial Approval | WINSTON DUNNING |
| Interior/Exterior Lathing | 6/21/2019 | Partial Inspection | LESLIE TRUJILLO |
| Interior/Exterior Lathing | 7/5/2019 | Partial Approval | JAMES POWERS |
| Deputy Drilled-In Anchors | 2/7/2020 | Conditional Approval | LESLIE TRUJILLO |
| Green Building Final | 7/20/2020 | Not Ready for Inspection | NICK DANERI |
| Wood Frame | 7/22/2020 | Partial Inspection | NICK DANERI |
| Special/Order Compliance | 6/28/2023 | Partial Approval | NICK DANERI |