1515 N SAN FERNANDO ROAD 1-87 90031
Certificate Information: 1515 N SAN FERNANDO ROAD 1-87 90031
- Application / Permit
- 12010-10000-01922
- Plan Check / Job No.
- B12LA10065
- Group
- Building
- Type
- Bldg-New
- Sub-Type
- Apartment
- Primary Use
- (5) Apartment
- Work Description
- Construct 87-unit apartment building (86 restricted affordable residential units for households earning up to a max 60% AMI plus one non-restricted manager unit) over 1-level basement parking.
- Permit Issued
- Issued on 1/24/2013
- Issuing Office
- Metro
- Current Status
- CofO Issued on 5/18/2015
- Certificate of Occupancy
- CofO Issued More Information
Permit Application Status History
Submitted | 9/20/2012 | APPLICANT |
Assigned to Plan Check Engineer | 9/27/2012 | TIEN JEN WANG |
Corrections Issued | 10/5/2012 | TIEN JEN WANG |
Quality Review Completed | 10/9/2012 | CHARLES CHANG |
Building Plans Picked Up | 10/11/2012 | APPLICANT |
Disabled Access Plans Picked Up | 10/11/2012 | APPLICANT |
Green Plans Picked Up | 10/15/2012 | APPLICANT |
Applicant returned to address corrections | 11/5/2012 | TIEN JEN WANG |
Applicant returned to address corrections | 11/13/2012 | TIEN JEN WANG |
Plan Check Approved | 1/24/2013 | TIEN JEN WANG |
Issued | 1/24/2013 | LADBS |
TCO Issued (Expire Date: 03-29-2015) | 9/30/2014 | HAMID PISHEHVAR |
TCO Issued (Expire Date: 09-25-2015) | 3/29/2015 | HAMID PISHEHVAR |
CofO in Progress | 5/18/2015 | WILLIAM GARCIA |
CofO Issued | 5/18/2015 | RICKEY JACKSON |
Permit Finaled | 5/18/2015 | RICKEY JACKSON |
Permit Application Clearance Information
Address approval | Cleared | 11/6/2012 | PAMELA TENEZA |
Highway dedication | Cleared | 11/6/2012 | ARMENIA HERNANDEZ |
Permit | Cleared | 11/6/2012 | ARMENIA AGUILAR |
Hydrant and Access approval | Cleared | 11/9/2012 | JOHN DALLAS |
Title 19 building approval | Cleared | 11/9/2012 | DAVE MYERS |
Eng Process Fee Ord 176,300 | Cleared | 11/28/2012 | ARMENIA HERNANDEZ |
Driveway location | Cleared | 12/4/2012 | COLLINS ALLAN |
DAS Clearance | Cleared | 12/11/2012 | WAI LAU |
Green Code | Cleared | 12/11/2012 | MARTHA DIAZ |
Building over 3-story or 36-ft | Cleared | 12/13/2012 | CALOSHA APPROVED |
Excavation more than 5-ft deep | Cleared | 12/13/2012 | CALOSHA APPROVED |
Drainage to Storm Drain | Cleared | 1/10/2013 | ARMENIA HERNANDEZ |
Low Impact Development | Cleared | 1/10/2013 | AMMAR ELTAWIL |
Roof/Waste drainage to street | Cleared | 1/10/2013 | ARMENIA HERNANDEZ |
Sewer availability | Cleared | 1/10/2013 | ARMENIA HERNANDEZ |
Stormwater Pollution Mitigatn | Cleared | 1/10/2013 | AMMAR ELTAWIL |
"Q" conditions | Cleared | 1/18/2013 | BRIDGETTE WOOTEN |
CPC | Cleared | 1/18/2013 | BRIDGETTE WOOTEN |
CPC | Cleared | 1/18/2013 | BRIDGETTE WOOTEN |
Frnt yard landscape/Water mgmt | Cleared | 1/18/2013 | BRIDGETTE WOOTEN |
Opn space landscape/Water mgmt | Cleared | 1/18/2013 | BRIDGETTE WOOTEN |
Site Plan review | Cleared | 1/18/2013 | BRIDGETTE WOOTEN |
Supp. Use District POD/CDO/TDO | Cleared | 1/18/2013 | BRIDGETTE WOOTEN |
Tract Map conditions | Cleared | 1/18/2013 | BRIDGETTE WOOTEN |
ZA Case | Cleared | 1/18/2013 | BRIDGETTE WOOTEN |
ZA Case | Cleared | 1/18/2013 | BRIDGETTE WOOTEN |
Housing density bonus | Cleared | 1/24/2013 | MARITES CUNANAN |
Contact Information
Architect | Empakeris, Donatas Eduard; Lic. No.: C13779 | 1535 6TH STREET SUITE 101 DE ARCHITECTS SANTA MONICA, CA 90401 |
Contractor | A P West Coast Inc; Lic. No.: 914709-B | 6701 WEST 23 STREET MINNEAPOLIS, MN 55426 |
Engineer | Berliner, Neal David; Lic. No.: GE2576 | 4913 MONUMENT ST SIMI VALLEY, CA 93063 |
Engineer | Labib, Youhanna T; Lic. No.: S4549 | 900 WILSHIRE BLVD STE 936 LOS ANGELES, CA 90017 |
Engineer | Waber, Mahir Marwan; Lic. No.: C69050 | 2120 E HILL ST 307 SIGNAL HILL, CA 90756 |
Inspector Information
LARRY ARNICK, (213) 482-0307 | Office Hours: 7:00-8:00 AM MON-FRI |
ERNESTO CORRAL, (213) 482-0307 | Office Hours: 7:00-8:00 AM MON-FRI |
JEFFREY FULTON, (213) 482-0307 | Office Hours: 7:00-8:00 AM MON-FRI |
RAFAEL ESPINOZA, (213) 482-0307 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
No Data Available. |
Inspection Request History
Deputy Reinf. Concrete | 5/31/2013 | Partial Approval | WILLIAM GARCIA |
Footing/Foundation/Slab | 5/31/2013 | Partial Inspection | WILLIAM GARCIA |
SWPPP-Const. Storm Water | 5/31/2013 | Not Required | WILLIAM GARCIA |
Deputy Reinf. Concrete | 6/6/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 6/6/2013 | Partial Approval | WILLIAM GARCIA |
Footing/Foundation/Slab | 6/6/2013 | Partial Inspection | WILLIAM GARCIA |
Deputy Reinf. Concrete | 6/7/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 6/7/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 6/10/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 6/11/2013 | Partial Approval | WILLIAM GARCIA |
Footing/Foundation/Slab | 6/11/2013 | Partial Inspection | WILLIAM GARCIA |
Wood Frame | 6/11/2013 | Not Ready for Inspection | WILLIAM GARCIA |
Deputy Reinf. Masonry | 6/12/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 6/13/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 6/14/2013 | Partial Approval | WILLIAM GARCIA |
Wood Frame | 6/14/2013 | Partial Inspection | WILLIAM GARCIA |
Deputy Reinf. Masonry | 6/17/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 6/18/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 6/19/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 6/20/2013 | Partial Approval | WILLIAM GARCIA |
Footing/Foundation/Slab | 6/20/2013 | Partial Inspection | WILLIAM GARCIA |
Deputy Reinf. Masonry | 6/21/2013 | Partial Approval | WILLIAM GARCIA |
Wood Frame | 6/21/2013 | Partial Inspection | WILLIAM GARCIA |
Deputy Reinf. Masonry | 6/24/2013 | Partial Approval | WILLIAM GARCIA |
Footing/Foundation/Slab | 6/24/2013 | Partial Inspection | WILLIAM GARCIA |
Deputy Reinf. Masonry | 6/25/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 6/26/2013 | Partial Approval | WILLIAM GARCIA |
Footing/Foundation/Slab | 6/26/2013 | Partial Inspection | WILLIAM GARCIA |
Deputy Reinf. Masonry | 6/27/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 6/28/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 7/1/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 7/2/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 7/3/2013 | Approved | SAKO AGHAZARIAN |
Deputy Reinf. Masonry | 7/5/2013 | Partial Approval | JAMES POWERS |
Deputy Reinf. Concrete | 7/23/2013 | Partial Approval | WILLIAM GARCIA |
Footing/Foundation/Slab | 7/23/2013 | Partial Inspection | WILLIAM GARCIA |
Deputy Reinf. Concrete | 7/25/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 8/6/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 8/7/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 8/8/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 8/9/2013 | Partial Approval | WILLIAM GARCIA |
Footing/Foundation/Slab | 8/9/2013 | Partial Inspection | WILLIAM GARCIA |
Deputy Reinf. Concrete | 9/17/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Concrete | 9/26/2013 | Partial Approval | LESLIE TRUJILLO |
Footing/Foundation/Slab | 9/26/2013 | Partial Approval | LESLIE TRUJILLO |
Deputy Reinf. Concrete | 9/27/2013 | Partial Approval | LESLIE TRUJILLO |
Deputy Reinf. Concrete | 9/30/2013 | Approved | SAKO AGHAZARIAN |
Deputy Reinf. Concrete | 10/1/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Concrete | 10/2/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Concrete | 10/3/2013 | Partial Approval | WILLIAM GARCIA |
Excavation/Setback/Form/Re-Bar | 10/3/2013 | Partial Inspection | WILLIAM GARCIA |
Deputy Reinf. Concrete | 10/4/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Concrete | 10/7/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Wood Construction | 10/17/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Concrete | 10/18/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Concrete | 10/21/2013 | Partial Approval | WILLIAM GARCIA |
Footing/Foundation/Slab | 10/21/2013 | Not Ready for Inspection | WILLIAM GARCIA |
Deputy Reinf. Concrete | 10/22/2013 | Partial Approval | WILLIAM GARCIA |
Green Building Rough | 10/22/2013 | Not Ready for Inspection | MICHAEL TUCK |
Wood Frame | 10/22/2013 | Partial Inspection | WILLIAM GARCIA |
Deputy Reinf. Concrete | 10/23/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Wood Construction | 10/25/2013 | Partial Approval | WILLIAM GARCIA |
Light Gage Steel Frame | 10/25/2013 | Partial Inspection | WILLIAM GARCIA |
Excavation/Setback/Form/Re-Bar | 10/28/2013 | Partial Inspection | WILLIAM GARCIA |
Light Gage Steel Frame | 10/28/2013 | Not Ready for Inspection | WILLIAM GARCIA |
Deputy Reinf. Concrete | 10/29/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Wood Construction | 10/30/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Wood Construction | 10/31/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Wood Construction | 11/1/2013 | Conditional Approval | WILLIAM THOMPSON |
Green Building Rough | 11/5/2013 | Partial Inspection | MICHAEL TUCK |
Wood Frame | 11/5/2013 | Partial Inspection | WILLIAM THOMPSON |
Deputy Wood Construction | 11/6/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Wood Construction | 11/7/2013 | Partial Approval | WILLIAM GARCIA |
Insulation | 11/7/2013 | Partial Inspection | WILLIAM GARCIA |
Deputy Wood Construction | 11/8/2013 | Approved | SAKO AGHAZARIAN |
Deputy Wood Construction | 11/12/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Wood Construction | 11/15/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Wood Construction | 11/19/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Wood Construction | 11/27/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Wood Construction | 12/4/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Wood Construction | 12/5/2013 | Partial Approval | WILLIAM GARCIA |
Wood Frame | 12/9/2013 | Partial Inspection | WILLIAM GARCIA |
Deputy Wood Construction | 12/16/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Wood Construction | 12/17/2013 | Partial Approval | WILLIAM GARCIA |
Deputy Wood Construction | 12/19/2013 | Partial Approval | WILLIAM GARCIA |
Green Building Rough | 12/20/2013 | Not Ready for Inspection | MICHAEL TUCK |
Wood Frame | 12/20/2013 | Partial Approval | MICHAEL KUHN |
Green Building Rough | 1/7/2014 | Not Ready for Inspection | MICHAEL TUCK |
Wood Frame | 1/7/2014 | Partial Inspection | WILLIAM GARCIA |
Green Building Rough | 1/21/2014 | Not Ready for Inspection | MICHAEL TUCK |
Wood Frame | 1/21/2014 | Partial Inspection | WILLIAM GARCIA |
Green Building Rough | 1/23/2014 | Not Ready for Inspection | MICHAEL TUCK |
Wood Frame | 1/23/2014 | Partial Inspection | WILLIAM GARCIA |
Deputy Reinf. Concrete | 1/30/2014 | Partial Approval | WILLIAM GARCIA |
Green Building Rough | 1/30/2014 | Not Ready for Inspection | MICHAEL TUCK |
Wood Frame | 1/30/2014 | Partial Inspection | WILLIAM GARCIA |
Deputy Wood Construction | 1/31/2014 | Partial Approval | ERNESTO CORRAL |
Interior/Exterior Lathing | 2/6/2014 | Partial Inspection | WILLIAM GARCIA |
Interior/Exterior Lathing | 2/7/2014 | Partial Inspection | WILLIAM GARCIA |
Deputy Wood Construction | 2/11/2014 | Partial Approval | WILLIAM GARCIA |
Green Building Rough | 2/11/2014 | Not Ready for Inspection | MICHAEL TUCK |
Wood Frame | 2/11/2014 | Partial Inspection | WILLIAM GARCIA |
Green Building Rough | 2/12/2014 | Partial Approval | MICHAEL TUCK |
Interior/Exterior Lathing | 2/12/2014 | Partial Inspection | WILLIAM GARCIA |
Insulation | 2/13/2014 | Partial Inspection | WILLIAM GARCIA |
Drywall Nailing | 2/24/2014 | Partial Inspection | WILLIAM GARCIA |
Interior/Exterior Lathing | 2/24/2014 | Partial Inspection | WILLIAM GARCIA |
Interior/Exterior Lathing | 2/25/2014 | Partial Inspection | WILLIAM GARCIA |
Green Building Rough | 3/11/2014 | Partial Approval | MICHAEL TUCK |
Interior/Exterior Lathing | 3/11/2014 | Partial Inspection | ERNESTO CORRAL |
Drywall Nailing | 3/21/2014 | Partial Inspection | WILLIAM GARCIA |
Drywall Nailing | 4/4/2014 | Partial Inspection | WILLIAM GARCIA |
Deputy Reinf. Masonry | 4/21/2014 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 4/22/2014 | Partial Approval | WILLIAM GARCIA |
Green Building Rough | 4/22/2014 | Partial Approval | RUSSELL KELLY |
Wood Frame | 4/22/2014 | Partial Inspection | WILLIAM GARCIA |
Deputy Reinf. Masonry | 4/23/2014 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 4/24/2014 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 4/25/2014 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 4/28/2014 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 4/29/2014 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 4/30/2014 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 5/1/2014 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 5/2/2014 | Approved | WILLIAM THOMPSON |
Green Building Rough | 5/2/2014 | Not Ready for Inspection | MICHAEL TUCK |
Wood Frame | 5/2/2014 | Partial Approval | WILLIAM THOMPSON |
Deputy Drilled-In Anchors | 5/5/2014 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 5/5/2014 | Partial Approval | WILLIAM GARCIA |
Light Gage Steel Frame | 5/5/2014 | Not Ready for Inspection | WILLIAM GARCIA |
Deputy Drilled-In Anchors | 5/6/2014 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 5/6/2014 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 5/7/2014 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 5/8/2014 | Partial Approval | WILLIAM GARCIA |
Floor/Roof Diaphrgm/Shear Wall | 5/8/2014 | Partial Inspection | WILLIAM GARCIA |
Deputy Reinf. Masonry | 5/9/2014 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 5/12/2014 | Partial Approval | WILLIAM GARCIA |
Deputy Reinf. Masonry | 5/13/2014 | Conditional Approval | MICHAEL ALVAREZ |
Deputy Reinf. Masonry | 5/14/2014 | Conditional Approval | WILLIAM THOMPSON |
Deputy Reinf. Masonry | 5/15/2014 | Approved | SAKO AGHAZARIAN |
Green Building Rough | 5/15/2014 | Approved | MICHAEL TUCK |
Wood Frame | 5/15/2014 | Partial Approval | SAKO AGHAZARIAN |
Deputy Drilled-In Anchors | 5/20/2014 | Partial Approval | ERNESTO CORRAL |
Wood Frame | 6/20/2014 | Approved | WILLIAM GARCIA |
Light Gage Steel Frame | 6/26/2014 | Partial Inspection | ERNESTO CORRAL |
Final | 9/15/2014 | Not Ready for Inspection | WILLIAM GARCIA |
Footing/Foundation/Slab | 9/15/2014 | Approved | WILLIAM GARCIA |
SGSOV-Seismic Gas S/O Valve | 9/15/2014 | SGSOV Approved | WILLIAM GARCIA |
Smoke Detectors | 9/15/2014 | Approved | WILLIAM GARCIA |
Final | 9/17/2014 | Not Ready for Inspection | WILLIAM GARCIA |
Green Building Final | 9/17/2014 | Partial Inspection | MEL KHACHATOURIAN |
Final | 9/18/2014 | Conditional Approval | WILLIAM GARCIA |
Final | 9/29/2014 | Partial Inspection | ERNESTO CORRAL |
Green Building Final | 9/29/2014 | Conditional Approval | RICHARD DOCKUS |
Final | 9/30/2014 | Conditional Approval | WILLIAM GARCIA |
Green Building Final | 10/15/2014 | Partial Approval | RICHARD DOCKUS |
Green Building Final | 11/6/2014 | Not Ready for Inspection | RICHARD DOCKUS |
Green Building Final | 11/19/2014 | Approved | DONALD CRICHLOW |
Special/Order Compliance | 3/3/2015 | Not Ready for Inspection | WILLIAM GARCIA |
Final | 5/13/2015 | Conditional Approval | WILLIAM GARCIA |