Pre-Inspection
|
12/11/2012
|
Approved
|
RICHARD SWETT
|
|
Deputy Drilled-In Anchors
|
3/8/2013
|
No Access for Inspection
|
RICHARD SWETT
|
|
Footing/Foundation/Slab
|
3/15/2013
|
Corrections Issued
|
RICHARD SWETT
|
|
Excavation/Setback/Form/Re-Bar
|
3/18/2013
|
Approved
|
RICHARD SWETT
|
|
Footing/Foundation/Slab
|
3/18/2013
|
Partial Approval
|
RICHARD SWETT
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/23/2013
|
Corrections Issued
|
RICHARD SWETT
|
|
Deputy Steel/Welding
|
6/6/2013
|
No Access for Inspection
|
RICHARD SWETT
|
|
Pre-Inspection
|
6/12/2013
|
Approved
|
RICHARD SWETT
|
|
BUILDING-Rough-Frame
|
8/30/2013
|
Not Ready for Inspection
|
RICHARD SWETT
|
|
Verify Sprinkler Sign Off
|
8/30/2013
|
Not Ready for Inspection
|
RICHARD SWETT
|
|
Deputy Wood Construction
|
9/4/2013
|
No Access for Inspection
|
RICHARD SWETT
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/15/2013
|
Partial Approval
|
RICHARD SWETT
|
|
Footing/Foundation/Slab
|
8/4/2014
|
Partial Approval
|
RICHARD SWETT
|
|
Excavation/Setback/Form/Re-Bar
|
8/25/2014
|
Partial Approval
|
DAVID LEE
|
|
Excavation/Setback/Form/Re-Bar
|
9/10/2014
|
Partial Approval
|
DAVID LEE
|
|
Footing/Foundation/Slab
|
9/10/2014
|
Partial Approval
|
DAVID LEE
|
|
Deputy Wood Construction
|
10/24/2014
|
Approved
|
DANIEL ORRANTE
|
|
Deputy Drilled-In Anchors
|
1/29/2015
|
No Access for Inspection
|
DAVID LEE
|
|
Excavation/Setback/Form/Re-Bar
|
2/2/2015
|
Partial Approval
|
DAVID LEE
|
|
Footing/Foundation/Slab
|
2/2/2015
|
Partial Approval
|
DAVID LEE
|
|
Special/Order Compliance
|
2/2/2015
|
Approved
|
DAVID LEE
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/16/2015
|
Partial Approval
|
DAVID LEE
|
|
Special/Order Compliance
|
7/16/2015
|
Approved
|
DAVID LEE
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/30/2015
|
Partial Approval
|
DAVID LEE
|
|
Special/Order Compliance
|
12/30/2015
|
Approved
|
DAVID LEE
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/22/2016
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Wood Frame
|
12/2/2016
|
No Access for Inspection
|
CHRISTOPHER WILSON
|
|
Pre-Inspection
|
12/6/2016
|
Approved
|
DAVID KOSKI
|
|
Reinforced Concrete Frame
|
5/30/2017
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Deputy Reinf. Concrete
|
6/2/2017
|
Conditional Approval
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
6/21/2017
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Special/Order Compliance
|
7/25/2017
|
No Access for Inspection
|
VINCENT SCIPIONI
|
|
Piling/Pier/Caisson
|
7/26/2017
|
Partial Inspection
|
VINCENT SCIPIONI
|
|
Excavation/Setback/Form/Re-Bar
|
9/27/2017
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Deputy Shotcrete
|
10/5/2017
|
Conditional Approval
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
10/10/2017
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Insulation
|
10/13/2017
|
Not Ready for Inspection
|
VINCENT SCIPIONI
|
|
Rough-Elec/Plmb/HVAC
|
10/13/2017
|
Partial Approval
|
VINCENT SCIPIONI
|
|
ELECTRICAL-Rough
|
1/16/2018
|
Partial Approval
|
RICHARD STEINBACH
|
|
Insulation
|
1/16/2018
|
Partial Approval
|
RICHARD STEINBACH
|
|
Footing/Foundation/Slab
|
1/18/2018
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Gas Test
|
1/18/2018
|
Not Ready for Inspection
|
VINCENT SCIPIONI
|
|
Deputy Reinf. Concrete
|
1/19/2018
|
Conditional Approval
|
RICHARD STEINBACH
|
|
Deputy Reinf. Concrete
|
1/24/2018
|
Conditional Approval
|
RICHARD STEINBACH
|
|
Deputy Shotcrete
|
1/24/2018
|
Conditional Approval
|
RICHARD STEINBACH
|
|
Deputy Drilled-In Anchors
|
2/21/2018
|
Partial Approval
|
JOHN LUMB
|
|
Excavation/Setback/Form/Re-Bar
|
2/23/2018
|
Not Ready for Inspection
|
VINCENT SCIPIONI
|
|
Footing/Foundation/Slab
|
2/23/2018
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Deputy Reinf. Concrete
|
2/26/2018
|
No Access for Inspection
|
VINCENT SCIPIONI
|
|
Reinforced Masonry Frame
|
3/6/2018
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Footing/Foundation/Slab
|
4/18/2018
|
Partial Approval
|
KENNETH NAGLE
|
|
Excavation/Setback/Form/Re-Bar
|
5/17/2018
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Deputy Reinf. Concrete
|
5/22/2018
|
No Access for Inspection
|
VINCENT SCIPIONI
|
|
Footing/Foundation/Slab
|
6/5/2018
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Deputy Drilled-In Anchors
|
6/11/2018
|
Conditional Approval
|
VINCENT SCIPIONI
|
|
Sewer
|
6/14/2018
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Excavation/Setback/Form/Re-Bar
|
7/17/2018
|
Partial Approval
|
VINCENT SCIPIONI
|
|
ELECTRICAL-Rough
|
7/20/2018
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Deputy Reinf. Concrete
|
7/27/2018
|
Conditional Approval
|
VINCENT SCIPIONI
|
|
Deputy Shotcrete
|
7/27/2018
|
Conditional Approval
|
VINCENT SCIPIONI
|
|
Sewer
|
8/16/2018
|
Not Ready for Inspection
|
VINCENT SCIPIONI
|
|
ELECTRICAL-Rough
|
9/27/2018
|
Partial Inspection
|
VINCENT SCIPIONI
|
|
Deputy Steel/Welding
|
12/17/2018
|
Conditional Approval
|
DANIEL ORRANTE
|
|
Deputy Drilled-In Anchors
|
4/25/2019
|
Conditional Approval
|
RICHARD STEINBACH
|
|
Footing/Foundation/Slab
|
7/16/2019
|
Not Ready for Inspection
|
DANNY TOLENTINO
|
|
ELECTRICAL-Rough
|
8/5/2019
|
Partial Approval
|
DANNY TOLENTINO
|
|
PLUMBING-Rough
|
8/5/2019
|
Partial Approval
|
DANNY TOLENTINO
|
|
Underground Mechanical
|
10/21/2019
|
Partial Approval
|
DAVID FEILER
|
|
ELECTRICAL-Rough
|
11/12/2019
|
Partial Approval
|
DANNY TOLENTINO
|
|
ELECTRICAL-Rough
|
1/6/2020
|
Partial Approval
|
DANNY TOLENTINO
|
|
PLUMBING-Rough
|
1/6/2020
|
Partial Approval
|
DANNY TOLENTINO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/16/2020
|
Conditional Approval
|
DANNY TOLENTINO
|
|
Deputy Reinf. Concrete
|
3/5/2020
|
Conditional Approval
|
DANNY TOLENTINO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/5/2020
|
Partial Approval
|
DANNY TOLENTINO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/19/2020
|
Partial Approval
|
ROBERT SHELLY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/13/2020
|
Partial Approval
|
DANNY TOLENTINO
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/4/2020
|
Not Ready for Inspection
|
DANNY TOLENTINO
|
|
Insulation
|
5/7/2020
|
Not Ready for Inspection
|
DANNY TOLENTINO
|
|
Insulation
|
5/8/2020
|
Partial Approval
|
DANNY TOLENTINO
|
|
Drywall Nailing
|
5/18/2020
|
Partial Approval
|
DANNY TOLENTINO
|
|
Green Building Rough
|
5/18/2020
|
Not Ready for Inspection
|
DANNY TOLENTINO
|
|
ELECTRICAL-Rough
|
6/24/2020
|
Partial Approval
|
ROBERT SHELLY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/6/2020
|
Partial Approval
|
JOHN KIDWELL
|
|
ELECTRICAL-Rough
|
7/22/2020
|
Partial Approval
|
ROBERT SHELLY
|
|
ELECTRICAL-Rough
|
7/27/2020
|
Partial Approval
|
ROBERT SHELLY
|
|
Reinforced Concrete Frame
|
7/27/2020
|
Partial Approval
|
ROBERT SHELLY
|
|
Insulation
|
8/19/2020
|
Partial Approval
|
JOHN KIDWELL
|
|
ELECTRICAL-Rough
|
8/25/2020
|
Approved
|
JOHN KIDWELL
|
|
Deputy Drilled-In Anchors
|
8/26/2020
|
Partial Approval
|
JOHN KIDWELL
|
|
ELECTRICAL-Rough
|
8/27/2020
|
Partial Approval
|
JOHN KIDWELL
|
|
ELECTRICAL-Rough
|
10/1/2020
|
Partial Approval
|
KENNETH NAGLE
|
|
Insulation
|
11/16/2020
|
Partial Approval
|
JOHN KIDWELL
|
|
Deputy Reinf. Concrete
|
3/25/2021
|
Corrections Issued
|
JOHN KIDWELL
|
|
Deputy Drilled-In Anchors
|
3/26/2021
|
Corrections Issued
|
JOHN KIDWELL
|
|
Deputy Reinf. Concrete
|
4/29/2021
|
Corrections Issued
|
JOHN KIDWELL
|
|
Deputy Reinf. Concrete
|
4/30/2021
|
Conditional Approval
|
ROBERT SHELLY
|
|
Interior/Exterior Lathing
|
7/28/2021
|
Partial Approval
|
ANTHONY MCDOWALL
|
|
Insulation
|
9/9/2021
|
Partial Approval
|
JESUS RODRIGUEZ
|
|
Interior/Exterior Lathing
|
10/18/2021
|
Partial Approval
|
JOHN KIDWELL
|
|
ELECTRICAL-Rough
|
10/26/2021
|
Not Ready for Inspection
|
JOHN KIDWELL
|
|
PLUMBING-Rough
|
10/29/2021
|
Partial Approval
|
JOHN KIDWELL
|
|
Drywall Nailing
|
11/30/2021
|
Partial Approval
|
JOHN KIDWELL
|
|
Green Building Rough
|
11/30/2021
|
Not Ready for Inspection
|
JOHN KIDWELL
|
|
ELECTRICAL-Rough
|
12/22/2021
|
Partial Approval
|
JOHN KIDWELL
|
|
ELECTRICAL-Rough
|
1/31/2022
|
Approved
|
JOHN KIDWELL
|
|
Insulation
|
2/7/2022
|
Partial Approval
|
STEPHANIE SWANSON
|
|
Special/Order Compliance
|
2/7/2022
|
Partial Inspection
|
CLAYTON GRAHAM
|
|
Pre-Inspection
|
2/8/2022
|
Partial Inspection
|
JOHN KIDWELL
|
|
Drywall Nailing
|
2/14/2022
|
Conditional Approval
|
DEANDRE HOFFMAN
|
|
ELECTRICAL-Rough
|
2/16/2022
|
Partial Approval
|
JOHN KIDWELL
|
|
Excavation/Setback/Form/Re-Bar
|
3/4/2022
|
Partial Approval
|
ANDREW NAVE
|
|
Rough-Elec/Plmb/HVAC
|
3/21/2022
|
Partial Approval
|
JOHN KIDWELL
|
|
ELECTRICAL-Rough
|
4/7/2022
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
Excavation/Setback/Form/Re-Bar
|
4/7/2022
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
ELECTRICAL-Rough
|
4/15/2022
|
Partial Approval
|
JUAN VALENZUELA
|
|
ELECTRICAL-Rough
|
5/5/2022
|
Partial Approval
|
ANDREW NAVE
|
|
PLUMBING-Rough
|
5/5/2022
|
Partial Approval
|
ANDREW NAVE
|
|
Excavation/Setback/Form/Re-Bar
|
5/23/2022
|
Partial Approval
|
JOHN KIDWELL
|
|
Interior/Exterior Lathing
|
5/25/2022
|
Partial Approval
|
JOHN KIDWELL
|
|
Interior/Exterior Lathing
|
7/18/2022
|
Partial Approval
|
ANDREW NAVE
|
|
Footing/Foundation/Slab
|
7/21/2022
|
Corrections Issued
|
KEVIN SARGSYAN
|
|
Underground Mechanical
|
7/26/2022
|
Partial Approval
|
CARLOS MATAMOROS
|
|
ELECTRICAL-Rough
|
8/10/2022
|
Corrections Issued
|
STEPHANIE SWANSON
|
|
ELECTRICAL-Rough
|
8/19/2022
|
Not Ready for Inspection
|
KEVIN SARGSYAN
|
|
Footing/Foundation/Slab
|
8/23/2022
|
Partial Approval
|
KEVIN SARGSYAN
|
|
Deputy Reinf. Concrete
|
8/25/2022
|
Conditional Approval
|
KEVIN SARGSYAN
|
|
Deputy Shotcrete
|
8/30/2022
|
Conditional Approval
|
KEVIN SARGSYAN
|
|
Deputy Shotcrete
|
8/31/2022
|
Conditional Approval
|
KEVIN SARGSYAN
|
|
Deputy Shotcrete
|
9/1/2022
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Deputy Shotcrete
|
9/2/2022
|
Conditional Approval
|
MICHAEL PELHAM
|
|
HVAC-Rough
|
9/14/2022
|
Corrections Issued
|
KEVIN SARGSYAN
|
|
Excavation/Setback/Form/Re-Bar
|
9/20/2022
|
Partial Approval
|
KEVIN SARGSYAN
|
|
ELECTRICAL-Rough
|
9/26/2022
|
Partial Approval
|
KEVIN SARGSYAN
|
|
Deputy Drilled-In Anchors
|
9/28/2022
|
Conditional Approval
|
KEVIN SARGSYAN
|
|
Deputy Reinf. Concrete
|
10/4/2022
|
Conditional Approval
|
KEVIN SARGSYAN
|
|
Deputy Shotcrete
|
10/4/2022
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Deputy Shotcrete
|
10/5/2022
|
Conditional Approval
|
KEVIN SARGSYAN
|
|
PLUMBING-Rough
|
10/5/2022
|
Corrections Issued
|
KEVIN SARGSYAN
|
|
BUILDING-Rough-Frame
|
10/13/2022
|
Not Ready for Inspection
|
ANDREW NAVE
|
|
Green Building Rough
|
10/13/2022
|
Not Ready for Inspection
|
ANDREW NAVE
|
|
Verify Sprinkler Sign Off
|
10/13/2022
|
Not Ready for Inspection
|
ANDREW NAVE
|
|
PLUMBING-Rough
|
10/18/2022
|
Partial Approval
|
KEVIN SARGSYAN
|
|
ELECTRICAL-Rough
|
11/2/2022
|
Partial Approval
|
KEVIN SARGSYAN
|
|
HVAC-Rough
|
11/2/2022
|
Partial Approval
|
KEVIN SARGSYAN
|
|
ELECTRICAL-Rough
|
11/17/2022
|
Partial Approval
|
KEVIN SARGSYAN
|
|
Excavation/Setback/Form/Re-Bar
|
11/17/2022
|
Partial Approval
|
KEVIN SARGSYAN
|
|
Deputy Reinf. Concrete
|
11/21/2022
|
Conditional Approval
|
KEVIN SARGSYAN
|
|
BUILDING-Rough-Frame
|
11/30/2022
|
Corrections Issued
|
KEVIN SARGSYAN
|
|
Green Building Rough
|
11/30/2022
|
Partial Approval
|
KEVIN SARGSYAN
|
|
Verify Sprinkler Sign Off
|
11/30/2022
|
Partial Approval
|
KEVIN SARGSYAN
|
|
BUILDING-Rough-Frame
|
12/2/2022
|
Partial Approval
|
KEVIN SARGSYAN
|
|
Deputy Drilled-In Anchors
|
12/16/2022
|
Conditional Approval
|
KEVIN SARGSYAN
|
|
ELECTRICAL-Rough
|
12/21/2022
|
Partial Approval
|
KEVIN SARGSYAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/21/2022
|
Partial Approval
|
KEVIN SARGSYAN
|
|
Insulation
|
12/27/2022
|
Partial Approval
|
BRENDAN LOONEY
|
|
Shower Pan
|
12/27/2022
|
Partial Approval
|
BRENDAN LOONEY
|
|
Deputy Drilled-In Anchors
|
1/12/2023
|
Conditional Approval
|
KEVIN SARGSYAN
|
|
Deputy Reinf. Concrete
|
1/19/2023
|
Conditional Approval
|
MICHAEL PELHAM
|
|
ELECTRICAL-Rough
|
1/23/2023
|
Partial Approval
|
STEPHANIE SWANSON
|
|
Excavation/Setback/Form/Re-Bar
|
1/23/2023
|
Not Ready for Inspection
|
STEPHANIE SWANSON
|
|
PLUMBING-Rough
|
1/23/2023
|
Partial Approval
|
STEPHANIE SWANSON
|
|
Insulation
|
1/27/2023
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
ELECTRICAL-Rough
|
2/27/2023
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
Footing/Foundation/Slab
|
2/27/2023
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
PLUMBING-Rough
|
2/27/2023
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
Underground Mechanical
|
2/27/2023
|
Not Ready for Inspection
|
CARLOS MATAMOROS
|
|
ELECTRICAL-Rough
|
3/2/2023
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
Footing/Foundation/Slab
|
3/2/2023
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
PLUMBING-Rough
|
3/2/2023
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
Drywall Nailing
|
3/31/2023
|
Partial Inspection
|
OGANES TARAKHCHYAN
|
|
Special/Order Compliance
|
3/31/2023
|
Corrections Issued
|
OGANES TARAKHCHYAN
|
|
Footing/Foundation/Slab
|
4/27/2023
|
No Access for Inspection
|
OGANES TARAKHCHYAN
|
|
PLUMBING-Rough
|
4/27/2023
|
No Access for Inspection
|
OGANES TARAKHCHYAN
|
|
Footing/Foundation/Slab
|
5/2/2023
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
PLUMBING-Rough
|
5/2/2023
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
HVAC-Rough
|
5/12/2023
|
Approved
|
OGANES TARAKHCHYAN
|
|
Footing/Foundation/Slab
|
6/2/2023
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
Insulation
|
6/5/2023
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
Footing/Foundation/Slab
|
6/9/2023
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
PLUMBING-Rough
|
6/21/2023
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
HVAC-Rough
|
6/22/2023
|
Approved
|
OGANES TARAKHCHYAN
|
|
Drywall Nailing
|
6/27/2023
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
Green Building Rough
|
6/27/2023
|
Approved
|
OGANES TARAKHCHYAN
|
|
Footing/Foundation/Slab
|
7/3/2023
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
Underground Mechanical
|
7/3/2023
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
Interior/Exterior Lathing
|
7/7/2023
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
Masonry Wall/Backfill
|
7/12/2023
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
Insulation
|
7/17/2023
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
Reinforced Concrete Frame
|
7/19/2023
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
Underground Mechanical
|
7/19/2023
|
Approved
|
OGANES TARAKHCHYAN
|
|
Interior/Exterior Lathing
|
7/25/2023
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
Footing/Foundation/Slab
|
8/9/2023
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
Drywall Nailing
|
8/11/2023
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
Interior/Exterior Lathing
|
8/11/2023
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
BUILDING-Rough-Frame
|
8/23/2023
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
Verify Sprinkler Sign Off
|
8/23/2023
|
Approved
|
OGANES TARAKHCHYAN
|
|
Interior/Exterior Lathing
|
8/28/2023
|
Partial Approval
|
ARAM AVEDISIAN
|
|
Shower Pan
|
9/7/2023
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
ELECTRICAL-Rough
|
9/13/2023
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
Interior/Exterior Lathing
|
9/13/2023
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
Excavation/Setback/Form/Re-Bar
|
9/25/2023
|
Corrections Issued
|
OGANES TARAKHCHYAN
|
|
Excavation/Setback/Form/Re-Bar
|
9/29/2023
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
ELECTRICAL-Rough
|
10/5/2023
|
Partial Approval
|
EVAN COOPER
|
|
Excavation/Setback/Form/Re-Bar
|
10/5/2023
|
Partial Approval
|
EVAN COOPER
|
|
Underground Mechanical
|
10/27/2023
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
Interior/Exterior Lathing
|
10/31/2023
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
Footing/Foundation/Slab
|
11/3/2023
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
Interior/Exterior Lathing
|
11/3/2023
|
Partial Approval
|
OGANES TARAKHCHYAN
|
|
Footing/Foundation/Slab
|
11/13/2023
|
Approved
|
OGANES TARAKHCHYAN
|
|
ELECTRICAL-Rough
|
11/28/2023
|
Partial Approval
|
ARAM AVEDISIAN
|
|
Interior/Exterior Lathing
|
11/28/2023
|
Partial Approval
|
ARAM AVEDISIAN
|
|
HVAC-Rough
|
12/1/2023
|
Partial Approval
|
ARAM AVEDISIAN
|
|
Drywall Nailing
|
12/8/2023
|
Partial Approval
|
ARAM AVEDISIAN
|
|
Special/Order Compliance
|
1/31/2024
|
Partial Inspection
|
MICHAEL PELHAM
|
|
PLUMBING-Rough
|
2/8/2024
|
Corrections Issued
|
MICHAEL PELHAM
|
|
Special/Order Compliance
|
2/9/2024
|
Corrections Issued
|
MICHAEL PELHAM
|
|
Interior/Exterior Lathing
|
2/15/2024
|
Partial Approval
|
ARAM AVEDISIAN
|
|
Shower Pan
|
4/4/2024
|
Partial Approval
|
ARAM AVEDISIAN
|
|
ELECTRICAL-Rough
|
5/21/2024
|
Partial Approval
|
ARAM AVEDISIAN
|
|
HVAC-Rough
|
5/21/2024
|
Partial Approval
|
ARAM AVEDISIAN
|
|
PLUMBING-Rough
|
5/21/2024
|
Partial Approval
|
ARAM AVEDISIAN
|
|
ELECTRICAL-Rough
|
6/6/2024
|
Partial Approval
|
ARAM AVEDISIAN
|
|
Light Gage Steel Frame
|
6/12/2024
|
Partial Approval
|
ARAM AVEDISIAN
|
|
Pre-Inspection
|
6/12/2024
|
Partial Inspection
|
ARAM AVEDISIAN
|
|
Interior/Exterior Lathing
|
6/14/2024
|
Approved
|
ARAM AVEDISIAN
|
|
Insulation
|
6/21/2024
|
Approved
|
ARAM AVEDISIAN
|
|
Interior/Exterior Lathing
|
8/5/2024
|
Approved
|
EVAN COOPER
|
|
Pre-Inspection
|
3/14/2025
|
Partial Inspection
|
HERBERT GIRON
|
|
ELECTRICAL-Final
|
5/13/2025
|
Not Ready for Inspection
|
MICHAEL PELHAM
|
|
Gas Test
|
8/7/2025
|
Approved
|
MICHAEL PELHAM
|
|
HVAC-Final
|
8/7/2025
|
Approved
|
MICHAEL PELHAM
|
|
PLUMBING-Final
|
8/7/2025
|
Approved
|
MICHAEL PELHAM
|
|
BUILDING-Rough-Frame
|
8/14/2025
|
Approved
|
MICHAEL PELHAM
|
|
Drywall Nailing
|
8/14/2025
|
Approved
|
MICHAEL PELHAM
|
|
ELECTRICAL-Final
|
8/14/2025
|
Approved
|
MICHAEL PELHAM
|
|
Final
|
8/14/2025
|
OK to Issue CofO
|
MICHAEL PELHAM
|
|
Green Building Final
|
8/14/2025
|
Approved
|
MICHAEL PELHAM
|
|
SGSOV-Seismic Gas S/O Valve
|
8/14/2025
|
SGSOV Approved
|
MICHAEL PELHAM
|
|
Smoke Detectors
|
8/14/2025
|
Approved
|
MICHAEL PELHAM
|