2020 N CYPREAN DR 90046

Certificate Information: 2020 N CYPREAN DR 90046

Application / Permit
11014-10000-04281
Plan Check / Job No.
B11LA13252
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
FIRST AND SECOND FLOOR ADDITION WITH NEW BASEMENT (GARAGE) TO EXISTING ONE STORY SFD.
Permit Issued
Issued on 12/4/2012
Issuing Office
Metro
Current Status
Issued on 12/4/2012
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 12/6/2011 APPLICANT
Assigned to Plan Check Engineer 1/13/2012 TSE MING HUANG
Corrections Issued 1/20/2012 TSE MING HUANG
Quality Review Completed 1/27/2012 KAMRAN GHOTBI RAVANDI
Building Plans Picked Up 2/2/2012 APPLICANT
Applicant returned to address corrections 3/27/2012 KAMRAN GHOTBI RAVANDI
Applicant returned to address corrections 4/2/2012 TSE MING HUANG
Applicant returned to address corrections 7/26/2012 TSE MING HUANG
Applicant returned to address corrections 9/19/2012 TSE MING HUANG
Applicant returned to address corrections 9/26/2012 TSE MING HUANG
Applicant returned to address corrections 10/17/2012 TSE MING HUANG
Applicant returned to address corrections 10/31/2012 TSE MING HUANG
Applicant returned to address corrections 11/6/2012 TSE MING HUANG
Applicant returned to address corrections 11/30/2012 TSE MING HUANG
Plan Check Approved 12/4/2012 TSE-MING HUANG
Issued 12/4/2012 LADBS
Permit Expired-Status Void 12/29/2014 APPLICANT
Re-Activate Permit 3/4/2015 TIMOTHY O CONNER
Permit Expired-Status Void 6/25/2016 ROBERT MINASSIANS
Re-Activate Permit 7/18/2016 ROBERT MINASSIANS

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 3/8/2012 AVALYN KAMACHI
Roof/Waste drainage to street Cleared 3/8/2012 AVALYN KAMACHI
Sewer availability Cleared 3/8/2012 AVALYN KAMACHI
Stormwater Pollution Mitigatn Cleared 3/8/2012 AYMAN JABBOURI
VHFHSZ Cleared 3/27/2012 JOHN DALLAS
Green Code Cleared 9/18/2012 EDWARD GOMEZ
Grading Pre-Inspection Cleared 9/19/2012 TSE-MING HUANG
BHO/Hillside ordinance Cleared 10/17/2012 GREGG VANDERGRIFF
BHO/Hillside ordinance Cleared 10/17/2012 GREGG VANDERGRIFF
BHO/Hillside ordinance Cleared 10/17/2012 GREGG VANDERGRIFF
BHO/Hillside ordinance Cleared 10/17/2012 GREGG VANDERGRIFF
Eng Process Fee Ord 176,300 Cleared 10/17/2012 AVALYN KAMACHI
Building over 3-story or 36-ft Cleared 11/6/2012 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 11/6/2012 CALOSHA APPROVED

Contact Information

Architect Neiman, Clifford Jay; Lic. No.: C13491 2930 WESTWOOD BLVD #100      LOS ANGELES, CA 90064
Contractor Greenbuild Construction Services Inc; Lic. No.: 937041-B 8200 WILSHIRE BLVD STE 200      BEVERLY HILLS, CA 90211
Engineer Magnuson, Steven Michael; Lic. No.: S1839 3013 POINSETTIA AVE      MANHATTAN BEACH, CA 90266
Engineer Tsai, Steve Shi-Shen; Lic. No.: GE2268 1545 VICTORY BLVD      GLENDALE, CA 91201

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 3/5/2015 Approved BRAD BESCOS
Special/Order Compliance 10/22/2015 No Access for Inspection BRAD BESCOS
Special/Order Compliance 6/24/2016 OK to Expire Permit ROBERT MINASSIANS
Special/Order Compliance 7/22/2016 Approved ROBERT MINASSIANS
Special/Order Compliance 8/18/2016 Approved ROBERT MINASSIANS
Gas Test 6/28/2021 Partial Inspection RICHARD STEINBACH
BUILDING-Rough-Frame 1/23/2025 Partial Approval RAUL BARAJAS
Final 1/23/2025 Corrections Issued RAUL BARAJAS
Footing/Foundation/Slab 1/23/2025 Approved RAUL BARAJAS
Green Building Final 1/23/2025 Not Ready for Inspection RAUL BARAJAS
Green Building Rough 1/23/2025 Approved RAUL BARAJAS
Reinforced Masonry Frame 1/23/2025 Partial Approval RAUL BARAJAS
SGSOV-Seismic Gas S/O Valve 1/23/2025 SGSOV Not Ready RAUL BARAJAS
SUSMP-Std. Urban Storm Water 1/23/2025 Not Ready for Inspection RAUL BARAJAS
Smoke Detectors 1/23/2025 Approved RAUL BARAJAS
Structural Steel Frame 1/23/2025 Not Ready for Inspection RAUL BARAJAS
Verify Sprinkler Sign Off 1/23/2025 Not Ready for Inspection RAUL BARAJAS
PLUMBING-Final 9/25/2025 Approved ROY SPAULDING
BUILDING-Rough-Frame 10/22/2025 Approved ROY SPAULDING
ELECTRICAL-Final 10/22/2025 Not Ready for Inspection ROY SPAULDING
Final 10/22/2025 Not Ready for Inspection ROY SPAULDING
Green Building Final 10/22/2025 Not Ready for Inspection ROY SPAULDING
HVAC-Final 10/22/2025 Not Ready for Inspection ROY SPAULDING
Reinforced Masonry Frame 10/22/2025 Approved ROY SPAULDING
SGSOV-Seismic Gas S/O Valve 10/22/2025 SGSOV No Gas ROY SPAULDING
SUSMP-Std. Urban Storm Water 10/22/2025 Not Ready for Inspection ROY SPAULDING
Structural Steel Frame 10/22/2025 Approved ROY SPAULDING
Verify Sprinkler Sign Off 10/22/2025 Approved ROY SPAULDING
ELECTRICAL-Final 10/23/2025 Approved ROY SPAULDING
HVAC-Final 10/23/2025 Approved ROY SPAULDING
ELECTRICAL-Final 3/18/2026 Approved ROY SPAULDING
Green Building Final 3/18/2026 Approved ROY SPAULDING