Deputy Methane Barrier
|
8/13/2012
|
Conditional Approval
|
JOHN CARPENTER
|
Deputy Methane Barrier
|
8/14/2012
|
Conditional Approval
|
JOHN CARPENTER
|
Excavation/Setback/Form/Re-Bar
|
8/14/2012
|
Partial Approval
|
JOHN CARPENTER
|
Footing/Foundation/Slab
|
8/14/2012
|
Partial Inspection
|
JOHN CARPENTER
|
METHANE-Barrier
|
8/14/2012
|
Not Ready for Inspection
|
JOHN CARPENTER
|
METHANE-Subgrade
|
8/14/2012
|
Not Ready for Inspection
|
JOHN CARPENTER
|
Deputy Methane Barrier
|
8/15/2012
|
Conditional Approval
|
JOHN CARPENTER
|
Deputy Reinf. Concrete
|
8/15/2012
|
Conditional Approval
|
JOHN CARPENTER
|
Deputy Methane Barrier
|
8/16/2012
|
Conditional Approval
|
JOHN CARPENTER
|
Deputy Reinf. Concrete
|
8/20/2012
|
Conditional Approval
|
JOHN CARPENTER
|
Deputy Methane Barrier
|
8/21/2012
|
Conditional Approval
|
JOHN CARPENTER
|
Deputy Methane Barrier
|
8/22/2012
|
Conditional Approval
|
JOHN CARPENTER
|
Deputy Methane Barrier
|
8/23/2012
|
Conditional Approval
|
JOHN CARPENTER
|
Deputy Reinf. Concrete
|
8/23/2012
|
Conditional Approval
|
JOHN CARPENTER
|
Light Gage Steel Frame
|
8/23/2012
|
Conditional Approval
|
JOHN CARPENTER
|
Deputy Reinf. Concrete
|
8/24/2012
|
Conditional Approval
|
JOHN CARPENTER
|
Deputy Methane Barrier
|
8/27/2012
|
Conditional Approval
|
JOHN CARPENTER
|
Deputy Methane Barrier
|
8/29/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
8/29/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Excavation/Setback/Form/Re-Bar
|
8/29/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
8/30/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
8/31/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
9/4/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Shotcrete
|
9/6/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Excavation/Setback/Form/Re-Bar
|
9/6/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Shotcrete
|
9/12/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Excavation/Setback/Form/Re-Bar
|
9/12/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
9/17/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Shotcrete
|
9/17/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
9/18/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Shotcrete
|
9/18/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
9/19/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Shotcrete
|
9/19/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
9/20/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Shotcrete
|
9/20/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Masonry Wall/Backfill
|
9/20/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
9/21/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Shotcrete
|
9/21/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Masonry Wall/Backfill
|
9/21/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
9/24/2012
|
Approved
|
SAKO AGHAZARIAN
|
Deputy Reinf. Concrete
|
10/5/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
10/9/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
METHANE-Rough
|
10/9/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Reinforced Concrete Frame
|
10/9/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Verify Sprinkler Sign Off
|
10/9/2012
|
Not Ready for Inspection
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
10/10/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Green Building Rough
|
10/10/2012
|
Not Ready for Inspection
|
RUBEN SALAS
|
Deputy Reinf. Masonry
|
10/12/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Methane Barrier
|
10/15/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
10/15/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Methane Barrier
|
10/16/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
10/16/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Green Building Rough
|
10/16/2012
|
Not Ready for Inspection
|
RUBEN SALAS
|
METHANE-Rough
|
10/16/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Reinforced Concrete Frame
|
10/16/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Reinforced Masonry Frame
|
10/16/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Verify Sprinkler Sign Off
|
10/16/2012
|
Not Ready for Inspection
|
LESLIE TRUJILLO
|
Deputy Methane Barrier
|
10/17/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
10/17/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Methane Barrier
|
10/18/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
10/18/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
10/19/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
10/22/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Reinforced Masonry Frame
|
10/22/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
10/23/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
10/24/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
10/25/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
10/26/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
10/29/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Masonry Wall/Backfill
|
10/29/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
10/30/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
11/6/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Green Building Rough
|
11/6/2012
|
Not Ready for Inspection
|
MICHAEL TUCK
|
METHANE-Rough
|
11/6/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Reinforced Concrete Frame
|
11/6/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Verify Sprinkler Sign Off
|
11/6/2012
|
Not Ready for Inspection
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
11/7/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Methane Barrier
|
11/8/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
11/8/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Methane Barrier
|
11/9/2012
|
Approved
|
SAKO AGHAZARIAN
|
Deputy Reinf. Concrete
|
11/9/2012
|
Approved
|
SAKO AGHAZARIAN
|
Deputy Methane Barrier
|
11/13/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
11/14/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
METHANE-Rough
|
11/14/2012
|
Not Ready for Inspection
|
LESLIE TRUJILLO
|
Reinforced Concrete Frame
|
11/14/2012
|
Not Ready for Inspection
|
LESLIE TRUJILLO
|
Verify Sprinkler Sign Off
|
11/14/2012
|
Not Ready for Inspection
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
11/16/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Excavation/Setback/Form/Re-Bar
|
11/16/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
11/19/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
11/20/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Masonry
|
11/21/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
11/26/2012
|
Conditional Approval
|
LEONARD MATCHNIFF
|
Deputy Reinf. Masonry
|
11/26/2012
|
Conditional Approval
|
LEONARD MATCHNIFF
|
Deputy Shotcrete
|
11/26/2012
|
Conditional Approval
|
LEONARD MATCHNIFF
|
Masonry Wall/Backfill
|
11/26/2012
|
Not Ready for Inspection
|
LEONARD MATCHNIFF
|
Deputy Reinf. Concrete
|
11/27/2012
|
Conditional Approval
|
LEONARD MATCHNIFF
|
Deputy Reinf. Masonry
|
11/27/2012
|
Conditional Approval
|
LEONARD MATCHNIFF
|
Deputy Shotcrete
|
11/27/2012
|
Conditional Approval
|
LEONARD MATCHNIFF
|
Excavation/Setback/Form/Re-Bar
|
11/27/2012
|
Partial Approval
|
LEONARD MATCHNIFF
|
Deputy Reinf. Concrete
|
11/28/2012
|
Conditional Approval
|
LEONARD MATCHNIFF
|
Deputy Reinf. Masonry
|
11/28/2012
|
Conditional Approval
|
LEONARD MATCHNIFF
|
Deputy Shotcrete
|
11/28/2012
|
Conditional Approval
|
LEONARD MATCHNIFF
|
Deputy Reinf. Concrete
|
11/29/2012
|
Approved
|
MICHAEL KUHN
|
Deputy Reinf. Masonry
|
11/29/2012
|
Approved
|
MICHAEL KUHN
|
Deputy Shotcrete
|
11/29/2012
|
Approved
|
MICHAEL KUHN
|
Deputy Reinf. Concrete
|
11/30/2012
|
Approved
|
MICHAEL KUHN
|
Deputy Reinf. Masonry
|
11/30/2012
|
Approved
|
MICHAEL KUHN
|
Deputy Shotcrete
|
11/30/2012
|
Approved
|
MICHAEL KUHN
|
Light Gage Steel Frame
|
11/30/2012
|
Not Ready for Inspection
|
MICHAEL KUHN
|
Masonry Wall/Backfill
|
11/30/2012
|
Not Ready for Inspection
|
MICHAEL KUHN
|
Deputy Reinf. Masonry
|
12/3/2012
|
No Access for Inspection
|
MICHAEL KUHN
|
Light Gage Steel Frame
|
12/3/2012
|
No Access for Inspection
|
MICHAEL KUHN
|
Masonry Wall/Backfill
|
12/3/2012
|
No Access for Inspection
|
MICHAEL KUHN
|
Deputy Reinf. Masonry
|
12/4/2012
|
Approved
|
MICHAEL KUHN
|
Deputy Reinf. Concrete
|
12/5/2012
|
Approved
|
MICHAEL KUHN
|
Masonry Wall/Backfill
|
12/5/2012
|
Partial Approval
|
MICHAEL KUHN
|
Deputy Reinf. Masonry
|
12/6/2012
|
Approved
|
MICHAEL KUHN
|
Deputy Reinf. Concrete
|
12/24/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
12/26/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
12/27/2012
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
12/31/2012
|
Approved
|
SAKO AGHAZARIAN
|
Deputy Reinf. Concrete
|
1/3/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
1/4/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Green Building Rough
|
1/4/2013
|
Not Ready for Inspection
|
MICHAEL TUCK
|
METHANE-Rough
|
1/4/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Reinforced Concrete Frame
|
1/4/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Verify Sprinkler Sign Off
|
1/4/2013
|
Not Ready for Inspection
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
1/7/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
1/11/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Shotcrete
|
1/16/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Shotcrete
|
1/17/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Excavation/Setback/Form/Re-Bar
|
1/17/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Drilled-In Anchors
|
1/28/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
1/28/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Drilled-In Anchors
|
1/29/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
1/29/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Drilled-In Anchors
|
1/30/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
1/30/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Excavation/Setback/Form/Re-Bar
|
1/30/2013
|
Not Ready for Inspection
|
LESLIE TRUJILLO
|
Excavation/Setback/Form/Re-Bar
|
1/31/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
2/4/2013
|
Approved
|
MICHAEL KUHN
|
Floor/Roof Diaphrgm/Shear Wall
|
2/6/2013
|
Partial Inspection
|
LEONARD MATCHNIFF
|
Deputy Wood Construction
|
2/12/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Floor/Roof Diaphrgm/Shear Wall
|
2/12/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Wood Construction
|
2/14/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
2/15/2013
|
Not Ready for Inspection
|
LESLIE TRUJILLO
|
Floor/Roof Diaphrgm/Shear Wall
|
2/15/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Wood Construction
|
2/28/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Floor/Roof Diaphrgm/Shear Wall
|
2/28/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Wood Construction
|
3/1/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Wood Construction
|
3/5/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Floor/Roof Diaphrgm/Shear Wall
|
3/5/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Methane Barrier
|
3/6/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Methane Barrier
|
3/7/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Methane Barrier
|
3/8/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Methane Barrier
|
3/11/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Methane Barrier
|
3/12/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Drilled-In Anchors
|
3/18/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Methane Barrier
|
3/19/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Methane Barrier
|
3/20/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Drilled-In Anchors
|
3/21/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Methane Barrier
|
3/21/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
3/21/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Wood Construction
|
3/21/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Floor/Roof Diaphrgm/Shear Wall
|
3/21/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Methane Barrier
|
3/22/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
3/22/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
3/26/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Drilled-In Anchors
|
3/29/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Wood Construction
|
3/29/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Floor/Roof Diaphrgm/Shear Wall
|
3/29/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Wood Frame
|
3/29/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
4/2/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Excavation/Setback/Form/Re-Bar
|
4/5/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
4/8/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
4/8/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
4/10/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Masonry Wall/Backfill
|
4/16/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
4/19/2013
|
Partial Inspection
|
LESLIE TRUJILLO
|
Deputy Wood Construction
|
4/22/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
4/22/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Floor/Roof Diaphrgm/Shear Wall
|
4/22/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
4/25/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
4/30/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
4/30/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Insulation
|
4/30/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
5/1/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Insulation
|
5/1/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
5/6/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Insulation
|
5/6/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
5/8/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Insulation
|
5/8/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Insulation
|
5/10/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
5/14/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Wood Construction
|
5/15/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Floor/Roof Diaphrgm/Shear Wall
|
5/15/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Green Building Rough
|
5/15/2013
|
Not Ready for Inspection
|
MICHAEL TUCK
|
METHANE-Rough
|
5/15/2013
|
Approved
|
LESLIE TRUJILLO
|
Verify Sprinkler Sign Off
|
5/15/2013
|
Not Ready for Inspection
|
LESLIE TRUJILLO
|
Wood Frame
|
5/15/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Verify Sprinkler Sign Off
|
5/24/2013
|
Not Ready for Inspection
|
LESLIE TRUJILLO
|
Wood Frame
|
5/24/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Insulation
|
6/5/2013
|
Partial Approval
|
JAMES POWERS
|
Drywall Nailing
|
6/7/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Insulation
|
6/11/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Insulation
|
6/12/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
6/14/2013
|
Not Ready for Inspection
|
MICHAEL KUHN
|
Insulation
|
6/14/2013
|
Partial Approval
|
MICHAEL KUHN
|
Drywall Nailing
|
6/20/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Interior/Exterior Lathing
|
6/24/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
6/25/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Interior/Exterior Lathing
|
6/25/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Insulation
|
7/9/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Light Gage Steel Frame
|
7/11/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
7/23/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
8/5/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
8/5/2013
|
Approved
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
8/6/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
8/7/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
8/8/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
8/9/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
T-Bar Ceiling
|
8/15/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Drywall Nailing
|
8/20/2013
|
Approved
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
8/21/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
8/22/2013
|
Partial Approval
|
WILLIAM GARCIA
|
Deputy Steel/Welding
|
8/26/2013
|
Approved
|
MICHAEL KUHN
|
Deputy Steel/Welding
|
8/27/2013
|
Partial Approval
|
JAMES POWERS
|
Deputy Steel/Welding
|
8/28/2013
|
Partial Approval
|
JAMES POWERS
|
Deputy Steel/Welding
|
8/29/2013
|
Approved
|
SAKO AGHAZARIAN
|
Deputy Steel/Welding
|
8/30/2013
|
Partial Approval
|
JAMES POWERS
|
T-Bar Ceiling
|
9/17/2013
|
Partial Approval
|
LESLIE TRUJILLO
|
T-Bar Ceiling
|
9/20/2013
|
Approved
|
LESLIE TRUJILLO
|
Green Building Final
|
10/30/2013
|
Approved
|
MICHAEL TUCK
|
Green Building Rough
|
10/30/2013
|
Approved
|
MICHAEL TUCK
|
Wood Frame
|
10/30/2013
|
Approved
|
LESLIE TRUJILLO
|
Drywall Nailing
|
10/31/2013
|
Approved
|
LESLIE TRUJILLO
|
Final
|
10/31/2013
|
OK for TCO
|
LESLIE TRUJILLO
|
Footing/Foundation/Slab
|
10/31/2013
|
Approved
|
LESLIE TRUJILLO
|
Insulation
|
10/31/2013
|
Approved
|
LESLIE TRUJILLO
|
METHANE-Barrier
|
10/31/2013
|
Approved
|
LESLIE TRUJILLO
|
METHANE-Subgrade
|
10/31/2013
|
Approved
|
LESLIE TRUJILLO
|
Reinforced Concrete Frame
|
10/31/2013
|
Approved
|
LESLIE TRUJILLO
|
SGSOV-Seismic Gas S/O Valve
|
10/31/2013
|
SGSOV Approved
|
LESLIE TRUJILLO
|
SUSMP-Std. Urban Storm Water
|
10/31/2013
|
Approved
|
LESLIE TRUJILLO
|
Smoke Detectors
|
10/31/2013
|
Approved
|
LESLIE TRUJILLO
|
T-Bar Ceiling
|
10/31/2013
|
Approved
|
LESLIE TRUJILLO
|
Verify Sprinkler Sign Off
|
10/31/2013
|
Approved
|
LESLIE TRUJILLO
|
Final
|
11/6/2013
|
Conditional Approval
|
LESLIE TRUJILLO
|