951 W OXFORD AVE 90292

Certificate Information: 951 W OXFORD AVE 90292

Application / Permit
10014-20000-04861
Plan Check / Job No.
B10VN12106
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Add to (E) SFD and remodel: <1st floor>: Add garage extension/laundry area at (95 sqft), add bathroom/entry (72 sqft). <2nd floor>: Add bedroom/bathroom/covered balcony (575 sqft). Remodel kitchen, bathrooms, bedrooms
Permit Issued
Issued on 8/24/2011
Issuing Office
Valley
Current Status
CofO Issued on 8/23/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/30/2010 APPLICANT
Assigned to Plan Check Engineer 2/11/2011 BINH PHAN
Corrections Issued 2/18/2011 BINH PHAN
Quality Review Completed 2/22/2011 DOUGLAS NAKATANI
Building Plans Picked Up 2/24/2011 APPLICANT
Applicant returned to address corrections 5/19/2011 BINH PHAN
Plan Check Approved 5/24/2011 BINH PHAN
Issued 8/24/2011 LADBS
CofO in Progress 8/18/2022 STEPHANIE SWANSON
Permit Finaled 8/23/2022 DANIEL ORRANTE
CofO Issued 8/23/2022 DANIEL ORRANTE
Permit Finaled 8/23/2022 DANIEL ORRANTE

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 4/18/2011 ROSE MARIE SMITH
Miscellaneous Cleared 4/18/2011 RICK TORRES
Sewer availability Cleared 4/18/2011 ROSE MARIE SMITH
Public Works-Highway Ded. Cleared 4/18/2011 ROSE MARIE SMITH
Public Works-Open Permits Cleared 4/18/2011 ROSE MARIE SMITH
Public Works-Sewers Cleared 4/18/2011 ROSE MARIE SMITH
Coastal Zone Cleared 5/16/2011 RICK TORRES
Specific Plan Cleared 5/18/2011 PEDRO AYALA
Specific Plan Cleared 5/19/2011 SOCORRO YUMUL
Specific Plan Cleared 5/19/2011 SOCORRO YUMUL

Contact Information

Contractor Owner-Builder       ,
Engineer Suleyman, Tuna; Lic. No.: C73294       ,

Inspector Information

DAKOTA LOW, (310) 914-3895 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 10/7/2011 Partial Inspection ANSON MAGLASANG
ELECTRICAL-Rough 10/12/2011 Not Ready for Inspection DAVID HEINE
PLUMBING-Rough 10/12/2011 Not Ready for Inspection DAVID HEINE
Pre-Inspection 10/12/2011 Approved DAVID HEINE
Rough-Elec/Plmb/HVAC 10/18/2011 Not Ready for Inspection DAVID HEINE
BUILDING-Rough-Frame 10/21/2011 Partial Approval DAVID HEINE
Insulation 10/21/2011 Partial Approval DAVID HEINE
METHANE-Rough 10/21/2011 Approved DAVID HEINE
Rough-Elec/Plmb/HVAC 10/21/2011 Partial Approval DAVID HEINE
BUILDING-Rough-Frame 10/27/2011 Partial Approval DAVID HEINE
Rough-Elec/Plmb/HVAC 10/27/2011 Partial Approval DAVID HEINE
Rough-Elec/Plmb/HVAC 11/1/2011 Partial Approval DAVID HEINE
BUILDING-Rough-Frame 11/10/2011 Partial Approval DAVID HEINE
Rough-Elec/Plmb/HVAC 11/10/2011 Partial Approval DAVID HEINE
Excavation/Setback/Form/Re-Bar 11/22/2011 Partial Approval DAVID HEINE
BUILDING-Rough-Frame 1/20/2012 Not Ready for Inspection DAVID HEINE
Rough-Elec/Plmb/HVAC 1/20/2012 Not Ready for Inspection DAVID HEINE
BUILDING-Rough-Frame 5/15/2012 Not Ready for Inspection DAVID HEINE
Rough-Elec/Plmb/HVAC 5/15/2012 Not Ready for Inspection DAVID HEINE
BUILDING-Rough-Frame 12/14/2012 Not Ready for Inspection JOHN LUMB
Footing/Foundation/Slab 6/10/2013 Not Ready for Inspection JOHN LUMB
METHANE-Barrier 6/10/2013 Not Ready for Inspection JOHN LUMB
METHANE-Subgrade 6/10/2013 Not Ready for Inspection JOHN LUMB
Footing/Foundation/Slab 7/12/2013 Corrections Issued BOB DUNN
Footing/Foundation/Slab 7/17/2013 Partial Approval JOHN LUMB
METHANE-Barrier 7/17/2013 Not Ready for Inspection JOHN LUMB
METHANE-Subgrade 7/17/2013 Not Ready for Inspection JOHN LUMB
Deputy Drilled-In Anchors 7/22/2013 Partial Approval JOHN LUMB
Footing/Foundation/Slab 7/25/2013 Approved JOHN LUMB
METHANE-Barrier 7/25/2013 Approved JOHN LUMB
METHANE-Subgrade 7/25/2013 Approved JOHN LUMB
Deputy Drilled-In Anchors 8/2/2013 Partial Approval JOHN LUMB
Excavation/Setback/Form/Re-Bar 8/2/2013 Partial Approval JOHN LUMB
Deputy Drilled-In Anchors 8/6/2013 Partial Approval JOHN LUMB
Floor/Roof Diaphrgm/Shear Wall 8/9/2013 Partial Approval JOHN LUMB
Final 2/6/2015 No Access for Inspection BOB DUNN
Rough-Elec/Plmb/HVAC 2/26/2015 No Access for Inspection BOB DUNN
Rough-Elec/Plmb/HVAC 10/6/2015 Not Ready for Inspection DAVID HEINE
Wood Frame 4/5/2016 No Access for Inspection BOB DUNN
Pre-Inspection 1/24/2019 Corrections Issued CRAIG DAVIS
Drywall Nailing 2/10/2021 Partial Approval OGANES TARAKHCHYAN
Shower Pan 2/10/2021 Not Ready for Inspection OGANES TARAKHCHYAN
Drywall Nailing 2/23/2021 Approved ENRIQUE MIRELES
Shower Pan 2/23/2021 Approved ENRIQUE MIRELES
Interior/Exterior Lathing 3/2/2021 Approved EVAN COOPER
BUILDING-Rough-Frame 8/4/2022 Approved STEPHANIE SWANSON
Final 8/4/2022 Corrections Issued STEPHANIE SWANSON
SGSOV-Seismic Gas S/O Valve 8/4/2022 SGSOV Approved STEPHANIE SWANSON
Smoke Detectors 8/4/2022 Corrections Issued STEPHANIE SWANSON
ELECTRICAL-Final 8/18/2022 Approved STEPHANIE SWANSON
Final 8/18/2022 OK to Issue CofO STEPHANIE SWANSON
PLUMBING-Final 8/18/2022 Approved STEPHANIE SWANSON
Service/Power Release 8/18/2022 Approved STEPHANIE SWANSON
Smoke Detectors 8/18/2022 Approved STEPHANIE SWANSON