5500 W SUNSET BLVD A, B, C, D 90028

Certificate Information: 5500 W SUNSET BLVD A, B, C, D 90028

Application / Permit
09010-10000-02348
Plan Check / Job No.
B09LA12192
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(16) Retail
Work Description
CONSTRUCTION OF NEW 3 STORY RETAIL AND PARKING STRUCTURE WITH ONE LEVEL MEZZANINE AT THE THIRD FLOOR PER CASE APC 2008-2703-SPE-CUB. RESTAURANT LOCATED AT THIRD FLOOR RETAIL AREA.
Permit Issued
Issued on 8/6/2013
Issuing Office
Metro
Current Status
CofO Issued on 1/17/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/17/2009 APPLICANT
Assigned to Plan Check Engineer 1/14/2010 JOHN FRANCIA
Corrections Issued 2/5/2010 JOHN FRANCIA
Quality Review Completed 2/18/2010 CATHERINE NUEZCA GABA
Building Plans Picked Up 3/10/2010 APPLICANT
Disabled Access Plans Picked Up 3/10/2010 APPLICANT
Applicant returned to address corrections 3/25/2010 JOHN FRANCIA
Applicant returned to address corrections 5/12/2010 JOHN FRANCIA
Applicant returned to address corrections 5/13/2010 JOHN FRANCIA
Applicant returned to address corrections 5/17/2010 JOHN FRANCIA
Applicant returned to address corrections 6/17/2010 JOHN FRANCIA
Applicant returned to address corrections 7/8/2010 JOHN FRANCIA
Applicant returned to address corrections 7/9/2010 JOHN FRANCIA
Applicant returned to address corrections 7/29/2010 JOHN FRANCIA
Applicant returned to address corrections 8/2/2010 JOHN FRANCIA
Plan Check Approved 8/6/2013 JOHN FRANCIA
Issued 8/6/2013 LADBS
TCO Issued (Expire Date: 02-07-2021) 8/11/2020 ERNESTO CORRAL
TCO Issued (Expire Date: 08-07-2021) 2/8/2021 ERNESTO CORRAL
CofO in Progress 12/8/2022 EDWIN GREGORYONA
CofO Issued 1/17/2023 TERRY HERR
Permit Finaled 1/17/2023 TERRY HERR

Permit Application Clearance Information

Title 19 building approval Cleared 5/4/2010 GHASSEM NIKKHOO
Address approval Cleared 7/9/2010 ANGENEE REYGADAS
Eng Process Fee Ord 176,300 Cleared 7/9/2010 AVALYN KAMACHI
Title 19 building approval Cleared 7/9/2010 DAVE MYERS
Work Adjacent to Public Way Cleared 7/9/2010 HUEY CHU
Hydrant and Access approval Cleared 7/20/2010 TERRENCE O'CONNELL
Hydrant and Access approval Cleared 7/20/2010 TERRENCE O'CONNELL
Food Service Establishment Cleared 7/23/2010 KENNETH BROWNE
Project located in CRA area Cleared 8/25/2010 JIM URQUHART
Project located in CRA area Cleared 8/25/2010 JIM URQUHART
DAS Clearance Cleared 9/23/2010 EDDIE GARIN
Roof/Waste drainage to street Cleared 3/5/2013 ARMENIA HERNANDEZ
Stormwater Pollution Mitigatn Cleared 3/5/2013 AYMAN JABBOURI
Highway dedication Cleared 5/21/2013 ARMENIA HERNANDEZ
Permit Cleared 5/21/2013 ARMENIA HERNANDEZ
Sewer availability Cleared 5/21/2013 ARMENIA HERNANDEZ
Miscellaneous Cleared 5/22/2013 DANIEL SUE
Encroachment in public way Cleared 5/24/2013 JAMES KHO
Hydrant and Access approval Cleared 5/28/2013 ROBERT DUFF
Project located in CRA area Cleared 5/28/2013 JIM URQUHART
Driveway location Cleared 6/4/2013 EILEEN HUNT
Internal circulation Cleared 6/4/2013 EILEEN HUNT
DAS Clearance Cleared 6/7/2013 JOHN FRANCIA
Building over 3-story or 36-ft Cleared 6/20/2013 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 6/20/2013 CALOSHA APPROVED
Food establishment approval Cleared 6/20/2013 LACDHS APPROVED
"D" conditions Cleared 7/18/2013 CLAUDIA RODRIGUEZ
APC Cleared 7/18/2013 CLAUDIA RODRIGUEZ
Comm Cor/Mini-Mall Cleared 7/18/2013 CLAUDIA RODRIGUEZ
Comm Cor/Mini-Mall Cleared 7/18/2013 CLAUDIA RODRIGUEZ
Comm Cor/Mini-Mall Cleared 7/18/2013 CLAUDIA RODRIGUEZ
Green Building Cleared 7/18/2013 CLAUDIA RODRIGUEZ
Green Code Cleared 7/18/2013 ALDO UBAU
Hold Cleared 7/18/2013 JOHN FRANCIA
Miscellaneous Cleared 7/18/2013 CLAUDIA RODRIGUEZ
Prkng lot landscape/Water mgmt Cleared 7/18/2013 CLAUDIA RODRIGUEZ
Project Permit Cleared 7/18/2013 CLAUDIA RODRIGUEZ
Specific Plan Cleared 7/18/2013 CLAUDIA RODRIGUEZ
"Q" conditions Cleared 7/22/2013 CLAUDIA RODRIGUEZ
Site Plan review Cleared 7/22/2013 CLAUDIA RODRIGUEZ

Contact Information

Architect Heath, Dennis Michael; Lic. No.: C12815 MBH ARCHITECTS   2470 MARINER SQUARE LOOP    ALAMEDA, CA 945011010
Contractor Whiting-Turner Contracting Company The; Lic. No.: 311107-B 250 COMMERCE SUITE 150      IRVINE, CA 92602
Engineer Fernandez, Terry Lynn; Lic. No.: S3256 1719 CARVER ST      REDONDO BEACH, CA 90278
Engineer Harris, James Edward Iv; Lic. No.: GE2100 3072 BURNEY PLACE      LOS ALAMITOS, CA 90720

Inspector Information

TIMOTHY POWELL, (213) 482-0360 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 8/21/2013 Partial Inspection SAKO AGHAZARIAN
Deputy Reinf. Concrete 10/21/2013 Approved SAKO AGHAZARIAN
Footing/Foundation/Slab 11/1/2013 Partial Inspection SAKO AGHAZARIAN
Footing/Foundation/Slab 11/5/2013 Partial Approval SAKO AGHAZARIAN
Green Building Rough 11/14/2013 Not Ready for Inspection DONALD CRICHLOW
Reinforced Concrete Frame 11/14/2013 Partial Approval SAKO AGHAZARIAN
Green Building Rough 11/19/2013 Not Ready for Inspection DONALD CRICHLOW
Reinforced Concrete Frame 11/19/2013 Partial Inspection SAKO AGHAZARIAN
Reinforced Masonry Frame 11/20/2013 Partial Approval SAKO AGHAZARIAN
Deputy Steel/Welding 12/16/2013 Approved SAKO AGHAZARIAN
Footing/Foundation/Slab 12/16/2013 Partial Inspection SAKO AGHAZARIAN
Deputy Steel/Welding 12/17/2013 Approved SAKO AGHAZARIAN
Excavation/Setback/Form/Re-Bar 12/17/2013 Partial Approval SAKO AGHAZARIAN
Deputy Steel/Welding 12/18/2013 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 12/19/2013 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 12/20/2013 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 1/6/2014 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 1/6/2014 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 1/7/2014 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 1/7/2014 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 1/8/2014 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 1/8/2014 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 1/9/2014 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 1/9/2014 Approved SAKO AGHAZARIAN
Footing/Foundation/Slab 1/9/2014 Partial Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 1/10/2014 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 1/10/2014 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 1/13/2014 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 1/13/2014 Approved SAKO AGHAZARIAN
Excavation/Setback/Form/Re-Bar 1/13/2014 Partial Approval SAKO AGHAZARIAN
Footing/Foundation/Slab 1/13/2014 Partial Inspection SAKO AGHAZARIAN
Deputy Reinf. Concrete 1/14/2014 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 1/14/2014 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 1/15/2014 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 1/15/2014 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 1/16/2014 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 1/16/2014 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 1/17/2014 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 1/17/2014 Approved SAKO AGHAZARIAN
Footing/Foundation/Slab 1/17/2014 Partial Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 1/21/2014 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 1/21/2014 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 1/22/2014 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 1/22/2014 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 1/23/2014 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 1/23/2014 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 1/24/2014 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 1/24/2014 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 1/27/2014 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 1/27/2014 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 1/28/2014 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 1/28/2014 Approved SAKO AGHAZARIAN
Footing/Foundation/Slab 1/28/2014 Partial Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 1/29/2014 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 1/29/2014 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 1/30/2014 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 1/30/2014 Approved SAKO AGHAZARIAN
Footing/Foundation/Slab 1/30/2014 Partial Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 1/31/2014 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 1/31/2014 Approved SAKO AGHAZARIAN
Deputy Drilled-In Anchors 2/10/2014 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 2/10/2014 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 2/10/2014 Approved SAKO AGHAZARIAN
Deputy Drilled-In Anchors 2/11/2014 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 2/11/2014 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 2/11/2014 Approved SAKO AGHAZARIAN
Deputy Drilled-In Anchors 2/12/2014 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 2/12/2014 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 2/12/2014 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 2/13/2014 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 2/13/2014 Approved JEFF BYTHEWAY
Deputy Steel/Welding 2/13/2014 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 2/14/2014 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 2/14/2014 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 2/14/2014 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 2/24/2014 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 2/24/2014 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 2/25/2014 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 2/25/2014 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 2/26/2014 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 2/26/2014 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 2/27/2014 Approved JEFF BYTHEWAY
Deputy Steel/Welding 2/27/2014 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 2/28/2014 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 2/28/2014 Approved SAKO AGHAZARIAN
Green Building Rough 3/3/2014 Not Ready for Inspection DONALD CRICHLOW
Reinforced Concrete Frame 3/3/2014 Partial Approval SAKO AGHAZARIAN
Green Building Rough 3/5/2014 Not Ready for Inspection DONALD CRICHLOW
Reinforced Concrete Frame 3/5/2014 Partial Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 3/10/2014 Approved SAKO AGHAZARIAN
Green Building Rough 3/10/2014 Not Ready for Inspection DONALD CRICHLOW
Reinforced Concrete Frame 3/10/2014 Partial Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 3/11/2014 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 3/12/2014 Approved SAKO AGHAZARIAN
Green Building Rough 3/12/2014 Not Ready for Inspection DONALD CRICHLOW
Reinforced Concrete Frame 3/12/2014 Partial Inspection SAKO AGHAZARIAN
Deputy Reinf. Concrete 3/13/2014 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 3/14/2014 Approved SAKO AGHAZARIAN
Footing/Foundation/Slab 3/14/2014 Partial Inspection SAKO AGHAZARIAN
Reinforced Concrete Frame 4/14/2014 Partial Inspection SAKO AGHAZARIAN
Reinforced Masonry Frame 4/18/2014 Partial Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 4/22/2014 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 4/23/2014 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 4/24/2014 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 4/25/2014 Approved SAKO AGHAZARIAN
Deputy Fireproofing 5/2/2014 Approved SAKO AGHAZARIAN
Light Gage Steel Frame 5/5/2014 Partial Approval SAKO AGHAZARIAN
Floor/Roof Diaphrgm/Shear Wall 5/9/2014 Partial Approval SAKO AGHAZARIAN
Floor/Roof Diaphrgm/Shear Wall 5/14/2014 Partial Inspection SAKO AGHAZARIAN
Excavation/Setback/Form/Re-Bar 5/27/2014 Partial Approval BARRY SILLS
Wood Frame 6/5/2014 Partial Approval SAKO AGHAZARIAN
Wood Frame 6/6/2014 Partial Approval SAKO AGHAZARIAN
Drywall Nailing 6/11/2014 Partial Inspection SAKO AGHAZARIAN
Green Building Rough 6/11/2014 Not Ready for Inspection DONALD CRICHLOW
Structural Steel Frame 6/11/2014 Partial Approval SAKO AGHAZARIAN
Drywall Nailing 6/16/2014 Partial Inspection SAKO AGHAZARIAN
Green Building Rough 6/16/2014 Not Ready for Inspection DONALD CRICHLOW
Light Gage Steel Frame 6/16/2014 Partial Approval SAKO AGHAZARIAN
Light Gage Steel Frame 6/17/2014 Partial Approval SAKO AGHAZARIAN
Light Gage Steel Frame 6/19/2014 Partial Approval BARRY SILLS
Light Gage Steel Frame 6/23/2014 Partial Approval SAKO AGHAZARIAN
Light Gage Steel Frame 6/24/2014 Partial Approval SAKO AGHAZARIAN
Insulation 6/26/2014 Partial Approval SAKO AGHAZARIAN
Pre-Inspection 6/26/2014 Approved SAKO AGHAZARIAN
Drywall Nailing 6/30/2014 Partial Approval SAKO AGHAZARIAN
Light Gage Steel Frame 7/1/2014 Partial Approval SAKO AGHAZARIAN
Light Gage Steel Frame 7/2/2014 Partial Approval SAKO AGHAZARIAN
Footing/Foundation/Slab 7/11/2014 Partial Approval SAKO AGHAZARIAN
Drywall Nailing 7/14/2014 Partial Approval SAKO AGHAZARIAN
Insulation 7/16/2014 Partial Approval SAKO AGHAZARIAN
Light Gage Steel Frame 7/16/2014 Partial Approval SAKO AGHAZARIAN
Footing/Foundation/Slab 7/17/2014 Partial Approval SAKO AGHAZARIAN
Masonry Wall/Backfill 7/17/2014 Partial Approval SAKO AGHAZARIAN
Footing/Foundation/Slab 7/25/2014 Partial Approval SAKO AGHAZARIAN
Masonry Wall/Backfill 7/28/2014 Partial Approval SAKO AGHAZARIAN
Light Gage Steel Frame 8/1/2014 Partial Approval SAKO AGHAZARIAN
Footing/Foundation/Slab 8/4/2014 Partial Approval SAKO AGHAZARIAN
Light Gage Steel Frame 8/12/2014 Partial Inspection SAKO AGHAZARIAN
Drywall Nailing 8/13/2014 Partial Approval SAKO AGHAZARIAN
Pre-Inspection 4/25/2019 Partial Approval EDWIN GREGORYONA
Pre-Inspection 5/17/2019 Approved EDWIN GREGORYONA
Light Gage Steel Frame 5/29/2019 Partial Inspection EDWIN GREGORYONA
Drywall Nailing 5/30/2019 Partial Inspection EDWIN GREGORYONA
Green Building Rough 5/30/2019 Partial Inspection EDWIN GREGORYONA
Light Gage Steel Frame 6/5/2019 Partial Approval EDWIN GREGORYONA
Drywall Nailing 6/27/2019 Partial Approval EDWIN GREGORYONA
Green Building Rough 6/27/2019 Partial Inspection EDWIN GREGORYONA
Light Gage Steel Frame 7/2/2019 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 7/3/2019 Partial Approval EDWIN GREGORYONA
Drywall Nailing 7/9/2019 Partial Approval EDWIN GREGORYONA
Green Building Rough 7/9/2019 Partial Inspection EDWIN GREGORYONA
Insulation 7/9/2019 Partial Approval EDWIN GREGORYONA
Drywall Nailing 7/15/2019 Partial Approval EDWIN GREGORYONA
Green Building Rough 7/15/2019 Partial Inspection EDWIN GREGORYONA
Insulation 7/15/2019 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 7/18/2019 Partial Approval EDWIN GREGORYONA
Drywall Nailing 7/24/2019 Partial Approval EDWIN GREGORYONA
Green Building Rough 7/24/2019 Partial Inspection EDWIN GREGORYONA
Drywall Nailing 7/31/2019 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 7/31/2019 Partial Approval EDWIN GREGORYONA
Drywall Nailing 8/5/2019 Partial Approval EDWIN GREGORYONA
Green Building Rough 8/5/2019 Partial Inspection EDWIN GREGORYONA
Drywall Nailing 8/7/2019 Partial Approval EDWIN GREGORYONA
Green Building Rough 8/7/2019 Partial Inspection EDWIN GREGORYONA
Interior/Exterior Lathing 8/7/2019 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 8/7/2019 Partial Approval EDWIN GREGORYONA
Drywall Nailing 8/12/2019 Partial Approval EDWIN GREGORYONA
Green Building Rough 8/12/2019 Partial Inspection EDWIN GREGORYONA
Light Gage Steel Frame 8/12/2019 Partial Approval EDWIN GREGORYONA
Drywall Nailing 8/15/2019 Partial Approval EDWIN GREGORYONA
Green Building Rough 8/15/2019 Partial Inspection EDWIN GREGORYONA
Interior/Exterior Lathing 8/15/2019 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 8/15/2019 Partial Approval EDWIN GREGORYONA
Drywall Nailing 8/22/2019 Partial Approval EDWIN GREGORYONA
Green Building Rough 8/22/2019 Partial Inspection EDWIN GREGORYONA
Interior/Exterior Lathing 8/22/2019 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 8/22/2019 Partial Approval EDWIN GREGORYONA
Drywall Nailing 9/3/2019 Partial Approval EDWIN GREGORYONA
Green Building Rough 9/3/2019 Partial Inspection EDWIN GREGORYONA
Light Gage Steel Frame 9/3/2019 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 9/9/2019 Partial Approval EDWIN GREGORYONA
Drywall Nailing 9/12/2019 Partial Approval EDWIN GREGORYONA
Green Building Rough 9/12/2019 Partial Inspection EDWIN GREGORYONA
Light Gage Steel Frame 9/12/2019 Partial Approval EDWIN GREGORYONA
Drywall Nailing 9/23/2019 Partial Approval EDWIN GREGORYONA
Green Building Rough 9/23/2019 Approved EDWIN GREGORYONA
Light Gage Steel Frame 9/23/2019 Partial Approval EDWIN GREGORYONA
Drywall Nailing 10/2/2019 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 10/2/2019 Partial Approval EDWIN GREGORYONA
T-Bar Ceiling 10/7/2019 Partial Inspection EDWIN GREGORYONA
Drywall Nailing 10/15/2019 Partial Approval EDWIN GREGORYONA
Drywall Nailing 10/18/2019 Partial Approval EDWIN GREGORYONA
Drywall Nailing 10/23/2019 Partial Approval EDWIN GREGORYONA
Drywall Nailing 11/7/2019 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 11/7/2019 Partial Approval EDWIN GREGORYONA
Drywall Nailing 11/14/2019 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 11/14/2019 Partial Approval EDWIN GREGORYONA
Drywall Nailing 11/25/2019 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 11/25/2019 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 12/5/2019 Partial Approval EDWIN GREGORYONA
Drywall Nailing 12/13/2019 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 12/13/2019 Partial Approval EDWIN GREGORYONA
Drywall Nailing 12/23/2019 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 12/23/2019 Partial Approval EDWIN GREGORYONA
Drywall Nailing 1/17/2020 Partial Approval EDWIN GREGORYONA
T-Bar Ceiling 1/21/2020 Partial Approval EDWIN GREGORYONA
T-Bar Ceiling 1/23/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 1/28/2020 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 1/28/2020 Partial Approval EDWIN GREGORYONA
T-Bar Ceiling 2/3/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 2/5/2020 Partial Approval EDWIN GREGORYONA
T-Bar Ceiling 2/12/2020 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 2/18/2020 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 2/18/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 2/19/2020 Partial Inspection EDWIN GREGORYONA
Interior/Exterior Lathing 2/19/2020 Partial Inspection EDWIN GREGORYONA
Light Gage Steel Frame 2/26/2020 Partial Approval EDWIN GREGORYONA
T-Bar Ceiling 3/5/2020 Partial Approval EDWIN GREGORYONA
Special/Order Compliance 3/11/2020 Approved EDWIN GREGORYONA
Pre-Inspection 3/16/2020 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 3/19/2020 Partial Approval EDWIN GREGORYONA
T-Bar Ceiling 4/8/2020 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 5/4/2020 Partial Approval EDWIN GREGORYONA
Wall Anchors 5/6/2020 Approved EDWIN GREGORYONA
Light Gage Steel Frame 5/20/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/22/2020 Approved EDWIN GREGORYONA
Final 5/22/2020 Partial Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 5/22/2020 Approved EDWIN GREGORYONA
Green Building Final 5/22/2020 Partial Inspection EDWIN GREGORYONA
Light Gage Steel Frame 5/22/2020 Approved EDWIN GREGORYONA
Reinforced Concrete Frame 5/22/2020 Approved EDWIN GREGORYONA
SGSOV-Seismic Gas S/O Valve 5/22/2020 SGSOV Not Ready EDWIN GREGORYONA
SUSMP-Std. Urban Storm Water 5/22/2020 Partial Inspection EDWIN GREGORYONA
Smoke Detectors 5/22/2020 Partial Inspection EDWIN GREGORYONA
Structural Steel Frame 5/22/2020 Approved EDWIN GREGORYONA
T-Bar Ceiling 5/22/2020 Approved EDWIN GREGORYONA
Light Gage Steel Frame 5/26/2020 Not Ready for Inspection LANNY MERRICK
Light Gage Steel Frame 6/3/2020 Partial Inspection EDWIN GREGORYONA
Final 6/4/2020 Partial Inspection EDWIN GREGORYONA
Green Building Final 6/4/2020 Partial Inspection EDWIN GREGORYONA
SGSOV-Seismic Gas S/O Valve 6/4/2020 SGSOV Not Ready EDWIN GREGORYONA
SUSMP-Std. Urban Storm Water 6/4/2020 Partial Inspection EDWIN GREGORYONA
Smoke Detectors 6/4/2020 Approved EDWIN GREGORYONA
Special/Order Compliance 6/12/2020 Partial Inspection EDWIN GREGORYONA
Special/Order Compliance 6/19/2020 Partial Inspection EDWIN GREGORYONA
Reinforced Masonry Frame 6/23/2020 Partial Approval EDWIN GREGORYONA
Reinforced Masonry Frame 6/26/2020 Partial Approval EDWIN GREGORYONA
Reinforced Masonry Frame 6/30/2020 Partial Approval EDWIN GREGORYONA
Special/Order Compliance 7/29/2020 Partial Inspection EDWIN GREGORYONA
Special/Order Compliance 8/5/2020 Partial Inspection EDWIN GREGORYONA
Final 8/7/2020 Not Ready for Inspection JEFFREY CHRISTIAN
Green Building Final 8/7/2020 Not Ready for Inspection JEFFREY CHRISTIAN
SGSOV-Seismic Gas S/O Valve 8/7/2020 SGSOV Not Ready JEFFREY CHRISTIAN
SUSMP-Std. Urban Storm Water 8/7/2020 Not Ready for Inspection JEFFREY CHRISTIAN
Deputy Drilled-In Anchors 9/18/2020 Partial Approval EDWIN GREGORYONA
Final 9/18/2020 Partial Inspection EDWIN GREGORYONA
Green Building Final 9/18/2020 Partial Inspection EDWIN GREGORYONA
SGSOV-Seismic Gas S/O Valve 9/18/2020 SGSOV Not Ready EDWIN GREGORYONA
SUSMP-Std. Urban Storm Water 9/18/2020 Partial Inspection EDWIN GREGORYONA
Final 10/13/2020 Conditional Approval EDWIN GREGORYONA
Green Building Final 10/13/2020 Approved EDWIN GREGORYONA
SGSOV-Seismic Gas S/O Valve 10/13/2020 SGSOV Approved EDWIN GREGORYONA
SUSMP-Std. Urban Storm Water 10/13/2020 Approved EDWIN GREGORYONA
Special/Order Compliance 1/13/2021 Partial Inspection EDWIN GREGORYONA
Special/Order Compliance 7/14/2021 Conditional Approval JONATHAN QUACH