Footing/Foundation/Slab
|
8/21/2013
|
Partial Inspection
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
10/21/2013
|
Approved
|
SAKO AGHAZARIAN
|
|
Footing/Foundation/Slab
|
11/1/2013
|
Partial Inspection
|
SAKO AGHAZARIAN
|
|
Footing/Foundation/Slab
|
11/5/2013
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Green Building Rough
|
11/14/2013
|
Not Ready for Inspection
|
DONALD CRICHLOW
|
|
Reinforced Concrete Frame
|
11/14/2013
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Green Building Rough
|
11/19/2013
|
Not Ready for Inspection
|
DONALD CRICHLOW
|
|
Reinforced Concrete Frame
|
11/19/2013
|
Partial Inspection
|
SAKO AGHAZARIAN
|
|
Reinforced Masonry Frame
|
11/20/2013
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
12/16/2013
|
Approved
|
SAKO AGHAZARIAN
|
|
Footing/Foundation/Slab
|
12/16/2013
|
Partial Inspection
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
12/17/2013
|
Approved
|
SAKO AGHAZARIAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/17/2013
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
12/18/2013
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
12/19/2013
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
12/20/2013
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
1/6/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
1/6/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
1/7/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
1/7/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
1/8/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
1/8/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
1/9/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
1/9/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Footing/Foundation/Slab
|
1/9/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
1/10/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
1/10/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
1/13/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
1/13/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Excavation/Setback/Form/Re-Bar
|
1/13/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Footing/Foundation/Slab
|
1/13/2014
|
Partial Inspection
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
1/14/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
1/14/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
1/15/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
1/15/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
1/16/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
1/16/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
1/17/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
1/17/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Footing/Foundation/Slab
|
1/17/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
1/21/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
1/21/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
1/22/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
1/22/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
1/23/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
1/23/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
1/24/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
1/24/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
1/27/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
1/27/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
1/28/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
1/28/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Footing/Foundation/Slab
|
1/28/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
1/29/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
1/29/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
1/30/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
1/30/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Footing/Foundation/Slab
|
1/30/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
1/31/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
1/31/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Drilled-In Anchors
|
2/10/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
2/10/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
2/10/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Drilled-In Anchors
|
2/11/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
2/11/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
2/11/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Drilled-In Anchors
|
2/12/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
2/12/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
2/12/2014
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Drilled-In Anchors
|
2/13/2014
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
2/13/2014
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
2/13/2014
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Drilled-In Anchors
|
2/14/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
2/14/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
2/14/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
2/24/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
2/24/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
2/25/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
2/25/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
2/26/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
2/26/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
2/27/2014
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Steel/Welding
|
2/27/2014
|
Approved
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
2/28/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Steel/Welding
|
2/28/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Green Building Rough
|
3/3/2014
|
Not Ready for Inspection
|
DONALD CRICHLOW
|
|
Reinforced Concrete Frame
|
3/3/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Green Building Rough
|
3/5/2014
|
Not Ready for Inspection
|
DONALD CRICHLOW
|
|
Reinforced Concrete Frame
|
3/5/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
3/10/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Green Building Rough
|
3/10/2014
|
Not Ready for Inspection
|
DONALD CRICHLOW
|
|
Reinforced Concrete Frame
|
3/10/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
3/11/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
3/12/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Green Building Rough
|
3/12/2014
|
Not Ready for Inspection
|
DONALD CRICHLOW
|
|
Reinforced Concrete Frame
|
3/12/2014
|
Partial Inspection
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
3/13/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
3/14/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Footing/Foundation/Slab
|
3/14/2014
|
Partial Inspection
|
SAKO AGHAZARIAN
|
|
Reinforced Concrete Frame
|
4/14/2014
|
Partial Inspection
|
SAKO AGHAZARIAN
|
|
Reinforced Masonry Frame
|
4/18/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
4/22/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
4/23/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
4/24/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Reinf. Concrete
|
4/25/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Deputy Fireproofing
|
5/2/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Light Gage Steel Frame
|
5/5/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/9/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/14/2014
|
Partial Inspection
|
SAKO AGHAZARIAN
|
|
Excavation/Setback/Form/Re-Bar
|
5/27/2014
|
Partial Approval
|
BARRY SILLS
|
|
Wood Frame
|
6/5/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Wood Frame
|
6/6/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Drywall Nailing
|
6/11/2014
|
Partial Inspection
|
SAKO AGHAZARIAN
|
|
Green Building Rough
|
6/11/2014
|
Not Ready for Inspection
|
DONALD CRICHLOW
|
|
Structural Steel Frame
|
6/11/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Drywall Nailing
|
6/16/2014
|
Partial Inspection
|
SAKO AGHAZARIAN
|
|
Green Building Rough
|
6/16/2014
|
Not Ready for Inspection
|
DONALD CRICHLOW
|
|
Light Gage Steel Frame
|
6/16/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Light Gage Steel Frame
|
6/17/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Light Gage Steel Frame
|
6/19/2014
|
Partial Approval
|
BARRY SILLS
|
|
Light Gage Steel Frame
|
6/23/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Light Gage Steel Frame
|
6/24/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Insulation
|
6/26/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Pre-Inspection
|
6/26/2014
|
Approved
|
SAKO AGHAZARIAN
|
|
Drywall Nailing
|
6/30/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Light Gage Steel Frame
|
7/1/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Light Gage Steel Frame
|
7/2/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Footing/Foundation/Slab
|
7/11/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Drywall Nailing
|
7/14/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Insulation
|
7/16/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Light Gage Steel Frame
|
7/16/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Footing/Foundation/Slab
|
7/17/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Masonry Wall/Backfill
|
7/17/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Footing/Foundation/Slab
|
7/25/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Masonry Wall/Backfill
|
7/28/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Light Gage Steel Frame
|
8/1/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Footing/Foundation/Slab
|
8/4/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Light Gage Steel Frame
|
8/12/2014
|
Partial Inspection
|
SAKO AGHAZARIAN
|
|
Drywall Nailing
|
8/13/2014
|
Partial Approval
|
SAKO AGHAZARIAN
|
|
Pre-Inspection
|
4/25/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Pre-Inspection
|
5/17/2019
|
Approved
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
5/29/2019
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
5/30/2019
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Green Building Rough
|
5/30/2019
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
6/5/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
6/27/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Green Building Rough
|
6/27/2019
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
7/2/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
7/3/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
7/9/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Green Building Rough
|
7/9/2019
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Insulation
|
7/9/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
7/15/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Green Building Rough
|
7/15/2019
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Insulation
|
7/15/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
7/18/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
7/24/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Green Building Rough
|
7/24/2019
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
7/31/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
7/31/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
8/5/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Green Building Rough
|
8/5/2019
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
8/7/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Green Building Rough
|
8/7/2019
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
8/7/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
8/7/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
8/12/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Green Building Rough
|
8/12/2019
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
8/12/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
8/15/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Green Building Rough
|
8/15/2019
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
8/15/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
8/15/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
8/22/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Green Building Rough
|
8/22/2019
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
8/22/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
8/22/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
9/3/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Green Building Rough
|
9/3/2019
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
9/3/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
9/9/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
9/12/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Green Building Rough
|
9/12/2019
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
9/12/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
9/23/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Green Building Rough
|
9/23/2019
|
Approved
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
9/23/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
10/2/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
10/2/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
T-Bar Ceiling
|
10/7/2019
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
10/15/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
10/18/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
10/23/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
11/7/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
11/7/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
11/14/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
11/14/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
11/25/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
11/25/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
12/5/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
12/13/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
12/13/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
12/23/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
12/23/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
1/17/2020
|
Partial Approval
|
EDWIN GREGORYONA
|
|
T-Bar Ceiling
|
1/21/2020
|
Partial Approval
|
EDWIN GREGORYONA
|
|
T-Bar Ceiling
|
1/23/2020
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
1/28/2020
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
1/28/2020
|
Partial Approval
|
EDWIN GREGORYONA
|
|
T-Bar Ceiling
|
2/3/2020
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
2/5/2020
|
Partial Approval
|
EDWIN GREGORYONA
|
|
T-Bar Ceiling
|
2/12/2020
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
2/18/2020
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
2/18/2020
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
2/19/2020
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
2/19/2020
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
2/26/2020
|
Partial Approval
|
EDWIN GREGORYONA
|
|
T-Bar Ceiling
|
3/5/2020
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Special/Order Compliance
|
3/11/2020
|
Approved
|
EDWIN GREGORYONA
|
|
Pre-Inspection
|
3/16/2020
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
3/19/2020
|
Partial Approval
|
EDWIN GREGORYONA
|
|
T-Bar Ceiling
|
4/8/2020
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Verify Sprinkler Sign Off
|
5/4/2020
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Wall Anchors
|
5/6/2020
|
Approved
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
5/20/2020
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
5/22/2020
|
Approved
|
EDWIN GREGORYONA
|
|
Final
|
5/22/2020
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Footing/Foundation/Slab
|
5/22/2020
|
Approved
|
EDWIN GREGORYONA
|
|
Green Building Final
|
5/22/2020
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
5/22/2020
|
Approved
|
EDWIN GREGORYONA
|
|
Reinforced Concrete Frame
|
5/22/2020
|
Approved
|
EDWIN GREGORYONA
|
|
SGSOV-Seismic Gas S/O Valve
|
5/22/2020
|
SGSOV Not Ready
|
EDWIN GREGORYONA
|
|
SUSMP-Std. Urban Storm Water
|
5/22/2020
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Smoke Detectors
|
5/22/2020
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Structural Steel Frame
|
5/22/2020
|
Approved
|
EDWIN GREGORYONA
|
|
T-Bar Ceiling
|
5/22/2020
|
Approved
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
5/26/2020
|
Not Ready for Inspection
|
LANNY MERRICK
|
|
Light Gage Steel Frame
|
6/3/2020
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Final
|
6/4/2020
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Green Building Final
|
6/4/2020
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
SGSOV-Seismic Gas S/O Valve
|
6/4/2020
|
SGSOV Not Ready
|
EDWIN GREGORYONA
|
|
SUSMP-Std. Urban Storm Water
|
6/4/2020
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Smoke Detectors
|
6/4/2020
|
Approved
|
EDWIN GREGORYONA
|
|
Special/Order Compliance
|
6/12/2020
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Special/Order Compliance
|
6/19/2020
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Reinforced Masonry Frame
|
6/23/2020
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Reinforced Masonry Frame
|
6/26/2020
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Reinforced Masonry Frame
|
6/30/2020
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Special/Order Compliance
|
7/29/2020
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Special/Order Compliance
|
8/5/2020
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Final
|
8/7/2020
|
Not Ready for Inspection
|
JEFFREY CHRISTIAN
|
|
Green Building Final
|
8/7/2020
|
Not Ready for Inspection
|
JEFFREY CHRISTIAN
|
|
SGSOV-Seismic Gas S/O Valve
|
8/7/2020
|
SGSOV Not Ready
|
JEFFREY CHRISTIAN
|
|
SUSMP-Std. Urban Storm Water
|
8/7/2020
|
Not Ready for Inspection
|
JEFFREY CHRISTIAN
|
|
Deputy Drilled-In Anchors
|
9/18/2020
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Final
|
9/18/2020
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Green Building Final
|
9/18/2020
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
SGSOV-Seismic Gas S/O Valve
|
9/18/2020
|
SGSOV Not Ready
|
EDWIN GREGORYONA
|
|
SUSMP-Std. Urban Storm Water
|
9/18/2020
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Final
|
10/13/2020
|
Conditional Approval
|
EDWIN GREGORYONA
|
|
Green Building Final
|
10/13/2020
|
Approved
|
EDWIN GREGORYONA
|
|
SGSOV-Seismic Gas S/O Valve
|
10/13/2020
|
SGSOV Approved
|
EDWIN GREGORYONA
|
|
SUSMP-Std. Urban Storm Water
|
10/13/2020
|
Approved
|
EDWIN GREGORYONA
|
|
Special/Order Compliance
|
1/13/2021
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Special/Order Compliance
|
7/14/2021
|
Conditional Approval
|
JONATHAN QUACH
|