5203 N ROCKLAND AVE 90041

Certificate Information: 5203 N ROCKLAND AVE 90041

Application / Permit
08014-70000-00140
Plan Check / Job No.
B08SL00069
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
12'-7" x 35'-7" irr. shaped family room and bedroom addition at rear, enclose existing porch on south side, and 2'-6" x 11'-10" closet addition to existing bedroom. Also include roof change-out to the whole dwelling, and interior remodeling. Related hvac, electrical, and plumbing. Construction per type V sheet, P/BC 2002-004.
Permit Issued
Issued on 1/18/2008
Issuing Office
South Los Angeles
Current Status
Issued on 1/18/2008
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 1/16/2008 APPLICANT
Assigned to Plan Check Engineer 1/16/2008 PATRICK KONG
Corrections Issued 1/18/2008 PATRICK KONG
Issued 1/18/2008 LADBS

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 1/17/2008 TAO YANG
Hillside ordinance Cleared 1/17/2008 TAO YANG
Hillside ordinance Cleared 1/17/2008 TAO YANG
Hillside ordinance Cleared 1/17/2008 TAO YANG
Hillside ordinance Cleared 1/17/2008 TAO YANG
Roof/Waste drainage to street Cleared 1/17/2008 CHRISTINE CHANG
Grading Pre-Inspection Cleared 1/18/2008 PAUL FRAUSTO

Contact Information

Contractor Owner-Builder       ,

Inspector Information

RONNIE MEDINA, (213) 469-5852 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 7/11/2008 Approved DONALD CRICHLOW
Footing/Foundation/Slab 7/15/2008 Approved DONALD CRICHLOW
Rough-Elec/Plmb/HVAC 9/3/2008 Not Ready for Inspection CHARLES FARRELL
Rough-Frame 9/3/2008 Corrections Issued CHARLES FARRELL
Floor/Roof Diaphrgm/Shear Wall 9/4/2008 Conditional Approval CHARLES FARRELL
Rough-Elec/Plmb/HVAC 9/4/2008 Not Ready for Inspection CHARLES FARRELL
BUILDING-Rough-Frame 9/16/2008 Conditional Approval CHARLES FARRELL
Rough-Elec/Plmb/HVAC 9/16/2008 Partial Approval CHARLES FARRELL
BUILDING-Rough-Frame 9/17/2008 Conditional Approval CHARLES FARRELL
HVAC-Rough 9/17/2008 Approved CHARLES FARRELL
Insulation 9/17/2008 Approved CHARLES FARRELL
BUILDING-Rough-Frame 10/6/2008 Approved CHARLES FARRELL
Drywall Nailing 10/6/2008 Approved CHARLES FARRELL
Interior/Exterior Lathing 10/6/2008 Partial Approval CHARLES FARRELL
Interior/Exterior Lathing 10/24/2008 Not Ready for Inspection CHARLES FARRELL
Interior/Exterior Lathing 11/17/2008 Approved CHARLES FARRELL
Pre-Inspection 6/10/2009 Not Ready for Inspection CHARLES FARRELL
Final 6/11/2009 Not Ready for Inspection CHARLES FARRELL
Floor/Roof Diaphrgm/Shear Wall 6/11/2009 Approved CHARLES FARRELL
Rough-Frame 6/11/2009 Approved CHARLES FARRELL
Final 2/16/2010 Conditional Approval CHARLES FARRELL
Final 4/13/2012 Not Ready for Inspection FRED HANNUM
Final 4/16/2012 Not Ready for Inspection FRED HANNUM
SGSOV-Seismic Gas S/O Valve 4/16/2012 SGSOV Not Ready FRED HANNUM
Smoke Detectors 4/16/2012 Approved FRED HANNUM
Final 2/2/2026 Corrections Issued RONNIE MEDINA