5005 S MAIN ST 1-89 90037

Certificate Information: 5005 S MAIN ST 1-89 90037

Application / Permit
08010-10000-02587
Plan Check / Job No.
B08LA10013
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW FIVE STORY (TYPE III-A) AND ONE SUBTERRANEAN LEVEL PARKING (TYPE I-A), 89 UNITS SENIOR CITIZEN AFFORDABLE HOUSING (ONE MODERATE INCOME UNIT AND AND 88 LOW INCOME UNITS). 6% DENSITY BONUS AND 3 INCENTIVES (FAR, HEIGHT, AND SETBACK) WITH 88 LOW INCOME UNITS PER LAMC 12.22. A.25. NFPA-13 - FULLY SPRINKLERED BUILDING. SEE COMMENTS
Permit Issued
Issued on 4/4/2013
Issuing Office
Metro
Current Status
CofO Issued on 6/26/2015
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/14/2008 APPLICANT
Assigned to Plan Check Engineer 10/30/2008 KANG-KYU CHOI
Corrections Issued 11/13/2008 KANG-KYU CHOI
Quality Review Completed 11/18/2008 DAVID CHANG
Building Plans Picked Up 11/25/2008 APPLICANT
Disabled Access Plans Picked Up 11/25/2008 APPLICANT
Applicant returned to address corrections 1/14/2009 KANG-KYU CHOI
Applicant returned to address corrections 9/10/2009 KANG-KYU CHOI
Applicant returned to address corrections 9/15/2009 KANG-KYU CHOI
Applicant returned to address corrections 9/16/2009 KANG-KYU CHOI
Applicant returned to address corrections 9/17/2009 KANG-KYU CHOI
Applicant returned to address corrections 10/28/2009 KANG-KYU CHOI
Applicant returned to address corrections 4/2/2010 KANG-KYU CHOI
Applicant returned to address corrections 6/3/2010 KANG-KYU CHOI
Applicant returned to address corrections 6/9/2010 KANG-KYU CHOI
Applicant returned to address corrections 6/10/2010 KANG-KYU CHOI
Applicant returned to address corrections 6/14/2010 KANG-KYU CHOI
Applicant returned to address corrections 6/30/2010 KANG-KYU CHOI
Applicant returned to address corrections 7/7/2010 KANG-KYU CHOI
Applicant returned to address corrections 7/23/2010 KANG-KYU CHOI
Applicant returned to address corrections 10/21/2010 KANG-KYU CHOI
Applicant returned to address corrections 12/29/2011 KANG-KYU CHOI
Applicant returned to address corrections 10/12/2012 LARRY LEE
Plan Check Approved 3/21/2013 LARRY LEE
Issued 4/4/2013 LADBS
TCO Issued (Expire Date: 06-21-2015) 12/23/2014 JAMES POWERS
CofO in Progress 6/22/2015 JAMES POWERS
CofO Issued 6/26/2015 RICKEY JACKSON
Permit Finaled 6/26/2015 RICKEY JACKSON

Permit Application Clearance Information

Address approval Cleared 12/12/2008 DAVID CHIN
Eng Process Fee Ord 176,300 Cleared 8/19/2009 NATALIE MOORE
Hydrant and Access approval Cleared 8/27/2009 JOHN DALLAS
Internal circulation Cleared 11/19/2009 TAIMOUR TANAVOLI
DAS Clearance Cleared 10/15/2010 KANG-KYU CHOI
Title 19 building approval Cleared 11/18/2010 HANI MALKI
Stormwater Pollution Mitigatn Cleared 12/28/2010 AMMAR ELTAWIL
Housing density bonus Cleared 8/10/2012 ALFREDA MASTERS
Housing density bonus Cleared 8/10/2012 ALFREDA MASTERS
Housing parking incentives Cleared 8/10/2012 ALFREDA MASTERS
Low Impact Development Cleared 12/5/2012 AYMAN JABBOURI
Permit Cleared 12/5/2012 LINDA MARGARET
Roof/Waste drainage to street Cleared 12/5/2012 LINDA MARGARET
Encroachment in public way Cleared 12/13/2012 ARMENIA HERNANDEZ
DAS Clearance Cleared 12/14/2012 KANG-KYU CHOI
DAS Clearance Cleared 12/14/2012 LARRY LEE
Green Code Cleared 12/14/2012 ALDO UBAU
Project located in CRA area Cleared 1/2/2013 JIM URQUHART
Sewer availability Cleared 1/30/2013 AVALYN KAMACHI
Construction near power lines Cleared 2/27/2013 LUCIO FERRER
Highway dedication Cleared 3/6/2013 ARMENIA HERNANDEZ
Work Adjacent to Public Way Cleared 3/6/2013 TERRY PHAN
CPC Cleared 3/20/2013 BRIDGETTE WOOTEN
Miscellaneous Cleared 3/20/2013 BRIDGETTE WOOTEN
Opn space landscape/Water mgmt Cleared 3/20/2013 BRIDGETTE WOOTEN
Site Plan review Cleared 3/20/2013 BRIDGETTE WOOTEN
Building over 3-story or 35-ft Cleared 3/21/2013 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 3/21/2013 CALOSHA APPROVED

Contact Information

Architect Flammang, Barbara Hansen; Lic. No.: C13422 1625 OLYMPIC BLVD      SANTA MONICA, CA 90404
Contractor Westport Construction Inc; Lic. No.: 712732-B P O BOX 661329      ARCADIA, CA 91066
Engineer Li, Joe Zhao; Lic. No.: S3155 1789 COUNTRY OAKS LANE      THOUSAND OAKS, CA 91362

Inspector Information

JAMES POWERS, (213) 482-0361 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 5/3/2013 Partial Approval JAMES POWERS
Deputy Grading 6/13/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/13/2013 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 6/13/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/14/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/17/2013 Approved MICHAEL KUHN
Excavation/Setback/Form/Re-Bar 6/17/2013 Not Ready for Inspection MICHAEL KUHN
Deputy Reinf. Concrete 6/18/2013 Partial Approval JAMES POWERS
Deputy Shotcrete 6/18/2013 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 6/18/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/19/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/20/2013 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 6/20/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/21/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/24/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/25/2013 Partial Approval JAMES POWERS
Footing/Foundation/Slab 6/25/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/26/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/27/2013 Partial Approval JAMES POWERS
Deputy Shotcrete 6/27/2013 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 6/27/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/28/2013 Partial Approval JAMES POWERS
Deputy Shotcrete 6/28/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/3/2013 Partial Approval JAMES POWERS
Footing/Foundation/Slab 7/3/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/5/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/9/2013 Partial Approval JAMES POWERS
Deputy Shotcrete 7/10/2013 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 7/10/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/11/2013 Partial Approval JAMES POWERS
Deputy Shotcrete 7/11/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/12/2013 Partial Approval JAMES POWERS
Deputy Shotcrete 7/12/2013 Partial Approval JAMES POWERS
Deputy Shotcrete 7/15/2013 Partial Approval JAMES POWERS
Deputy Shotcrete 7/16/2013 Partial Approval JAMES POWERS
Reinforced Concrete Frame 7/16/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/17/2013 Conditional Approval WINFIELD HINKSON
Deputy Shotcrete 7/17/2013 Conditional Approval WINFIELD HINKSON
Deputy Shotcrete 7/18/2013 Partial Approval JAMES POWERS
Deputy Shotcrete 7/19/2013 Partial Approval JAMES POWERS
Deputy Shotcrete 7/23/2013 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 7/23/2013 Partial Approval JAMES POWERS
Deputy Shotcrete 7/24/2013 Partial Approval JAMES POWERS
Deputy Shotcrete 7/25/2013 Partial Approval JAMES POWERS
Deputy Shotcrete 7/26/2013 Partial Approval JAMES POWERS
Footing/Foundation/Slab 7/26/2013 Partial Approval JAMES POWERS
Deputy Shotcrete 7/29/2013 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 7/29/2013 Partial Approval JAMES POWERS
Deputy Shotcrete 7/30/2013 Partial Approval JAMES POWERS
Deputy Shotcrete 8/8/2013 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/9/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/12/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/13/2013 Partial Approval JAMES POWERS
Footing/Foundation/Slab 8/14/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/15/2013 Partial Approval JAMES POWERS
Deputy Shotcrete 8/19/2013 Partial Approval JAMES POWERS
Deputy Shotcrete 8/20/2013 Partial Approval JAMES POWERS
Footing/Foundation/Slab 8/20/2013 Partial Approval JAMES POWERS
Deputy Shotcrete 8/21/2013 Partial Approval JAMES POWERS
Deputy Shotcrete 8/22/2013 Partial Approval JAMES POWERS
Reinforced Concrete Frame 8/22/2013 Partial Approval JAMES POWERS
Deputy Shotcrete 8/23/2013 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 8/23/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/26/2013 Approved DERRICK SPENCER
Deputy Shotcrete 8/26/2013 Approved DERRICK SPENCER
Deputy Shotcrete 9/16/2013 Partial Approval JAMES POWERS
Reinforced Concrete Frame 9/16/2013 Partial Approval JAMES POWERS
Footing/Foundation/Slab 9/23/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/24/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/10/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/11/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/15/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/22/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/23/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/24/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/25/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/28/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/29/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/30/2013 Partial Approval JAMES POWERS
Reinforced Concrete Frame 10/30/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/31/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/1/2013 Partial Approval JAMES POWERS
Reinforced Concrete Frame 11/1/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/4/2013 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/5/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/6/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/7/2013 Partial Approval JAMES POWERS
Reinforced Concrete Frame 11/7/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/8/2013 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/18/2013 Partial Approval JAMES POWERS
Footing/Foundation/Slab 11/18/2013 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 11/19/2013 Approved MICHAEL KUHN
Excavation/Setback/Form/Re-Bar 11/19/2013 Partial Approval MICHAEL KUHN
Footing/Foundation/Slab 11/20/2013 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 11/25/2013 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/4/2013 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 12/6/2013 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/9/2013 Partial Approval JAMES POWERS
Deputy Wood Construction 12/18/2013 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 12/18/2013 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 1/3/2014 Partial Approval JAMES POWERS
Deputy Wood Construction 1/7/2014 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 1/7/2014 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/14/2014 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 1/16/2014 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/17/2014 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/22/2014 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 1/22/2014 Partial Approval JAMES POWERS
Masonry Wall/Backfill 1/22/2014 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 1/30/2014 Approved MICHAEL ALVAREZ
Deputy Reinf. Concrete 2/6/2014 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 2/6/2014 Partial Approval JAMES POWERS
Masonry Wall/Backfill 2/6/2014 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 2/12/2014 Partial Approval JAMES POWERS
Deputy Wood Construction 2/20/2014 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 2/20/2014 Partial Approval JAMES POWERS
Masonry Wall/Backfill 2/25/2014 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 2/27/2014 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 3/13/2014 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 3/18/2014 Partial Approval JAMES POWERS
Wood Frame 3/24/2014 Partial Approval JAMES POWERS
Insulation 3/28/2014 Partial Approval JAMES POWERS
Drywall Nailing 4/4/2014 Not Ready for Inspection BYRON FUENTES
Insulation 4/4/2014 Partial Approval BYRON FUENTES
Drywall Nailing 4/7/2014 Partial Approval BYRON FUENTES
Floor/Roof Diaphrgm/Shear Wall 4/9/2014 Partial Approval JAMES POWERS
Drywall Nailing 4/17/2014 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 4/17/2014 Partial Approval JAMES POWERS
Insulation 4/22/2014 Partial Approval JAMES POWERS
Insulation 4/24/2014 Partial Approval JAMES POWERS
Insulation 4/30/2014 Partial Approval BYRON FUENTES
Insulation 5/5/2014 Partial Approval JAMES POWERS
Drywall Nailing 5/8/2014 Not Ready for Inspection MICHAEL KUHN
Insulation 5/8/2014 Partial Inspection MICHAEL KUHN
Insulation 5/9/2014 Partial Approval JAMES POWERS
Deputy Wood Construction 5/13/2014 Approved MICHAEL KUHN
Floor/Roof Diaphrgm/Shear Wall 5/13/2014 Partial Approval MICHAEL KUHN
Deputy Wood Construction 5/14/2014 Approved MICHAEL KUHN
Insulation 5/14/2014 Partial Approval MICHAEL KUHN
Insulation 5/15/2014 Partial Approval MICHAEL KUHN
Insulation 5/19/2014 Not Ready for Inspection BYRON FUENTES
Interior/Exterior Lathing 5/19/2014 Not Ready for Inspection BYRON FUENTES
Insulation 5/20/2014 Partial Approval JAMES POWERS
Interior/Exterior Lathing 5/20/2014 Partial Approval JAMES POWERS
Wood Frame 5/20/2014 Partial Approval JAMES POWERS
Insulation 5/21/2014 Partial Approval JAMES POWERS
Insulation 5/22/2014 Partial Approval BYRON FUENTES
Insulation 5/27/2014 Partial Approval BYRON FUENTES
Interior/Exterior Lathing 5/27/2014 Partial Approval BYRON FUENTES
Deputy Wood Construction 5/28/2014 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 5/29/2014 Partial Approval JAMES POWERS
Insulation 5/29/2014 Partial Approval JAMES POWERS
Interior/Exterior Lathing 5/29/2014 Partial Approval JAMES POWERS
Insulation 6/2/2014 Partial Approval JAMES POWERS
Wood Frame 6/2/2014 Not Ready for Inspection JAMES POWERS
Insulation 6/4/2014 Partial Approval JAMES POWERS
Wood Frame 6/4/2014 Partial Approval JAMES POWERS
Drywall Nailing 6/6/2014 Not Ready for Inspection JAMES POWERS
Insulation 6/6/2014 Partial Approval JAMES POWERS
Insulation 6/10/2014 Not Ready for Inspection JAMES POWERS
Interior/Exterior Lathing 6/10/2014 Partial Approval JAMES POWERS
Insulation 6/12/2014 Partial Approval JAMES POWERS
Insulation 6/16/2014 Partial Approval BYRON FUENTES
Insulation 6/18/2014 Partial Approval JAMES POWERS
Drywall Nailing 6/23/2014 Partial Approval JAMES POWERS
Insulation 6/23/2014 Approved JAMES POWERS
Drywall Nailing 7/1/2014 Partial Approval JAMES POWERS
Light Gage Steel Frame 7/1/2014 Partial Approval JAMES POWERS
Interior/Exterior Lathing 7/8/2014 Approved JAMES POWERS
Light Gage Steel Frame 7/28/2014 Partial Approval JAMES POWERS
Final 9/22/2014 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 9/22/2014 Approved JAMES POWERS
Green Building Final 9/22/2014 Not Ready for Inspection RICHARD DOCKUS
Green Building Rough 9/22/2014 Approved RICHARD DOCKUS
Reinforced Concrete Frame 9/22/2014 Not Ready for Inspection JAMES POWERS
Reinforced Masonry Frame 9/22/2014 Not Ready for Inspection JAMES POWERS
SGSOV-Seismic Gas S/O Valve 9/22/2014 SGSOV Not Ready JAMES POWERS
SUSMP-Std. Urban Storm Water 9/22/2014 Not Ready for Inspection JAMES POWERS
Smoke Detectors 9/22/2014 Approved JAMES POWERS
T-Bar Ceiling 9/22/2014 Approved JAMES POWERS
Final 10/3/2014 Not Ready for Inspection JAMES POWERS
Green Building Final 10/3/2014 Partial Inspection DONALD CRICHLOW
Reinforced Concrete Frame 10/3/2014 Approved JAMES POWERS
Reinforced Masonry Frame 10/3/2014 Approved JAMES POWERS
SGSOV-Seismic Gas S/O Valve 10/3/2014 SGSOV Approved JAMES POWERS
SUSMP-Std. Urban Storm Water 10/3/2014 Not Ready for Inspection JAMES POWERS
T-Bar Ceiling 10/23/2014 Approved JAMES POWERS
Green Building Final 12/3/2014 Approved ROLLIN GETTLE III
Final 12/8/2014 OK for TCO JAMES POWERS
SUSMP-Std. Urban Storm Water 12/8/2014 Not Ready for Inspection JAMES POWERS
Special/Order Compliance 5/27/2015 Approved JAMES POWERS
Final 6/2/2015 Not Ready for Inspection JAMES POWERS
SUSMP-Std. Urban Storm Water 6/2/2015 Not Ready for Inspection JAMES POWERS
Final 6/22/2015 OK to Issue CofO JAMES POWERS
SUSMP-Std. Urban Storm Water 6/22/2015 Approved JAMES POWERS