2029 S CENTURY PARK EAST 90067

Certificate Information: 2029 S CENTURY PARK EAST 90067

Application / Permit
07014-10000-05124
Plan Check / Job No.
B07LA07209
Group
Building
Type
Bldg-Addition
Sub-Type
Commercial
Primary Use
(13) Office
Work Description
Construct mezzaine boiler room 1498 sq ft in level D-parking, construct cooling tower enclosure over subterrainean parking garage, and transformer room remodel (within a high rise office building). Relocate 7 stalls under the proposed boiler room to parking level "B".
Permit Issued
Issued on 9/20/2007
Issuing Office
Metro
Current Status
CofO Issued on 11/24/2010
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/19/2007 APPLICANT
Assigned to Plan Check Engineer 8/4/2007 SEAN DANG
Corrections Issued 8/5/2007 SEAN DANG
Quality Review Completed 8/7/2007 SEAN DANG
Disabled Access Plans Picked Up 8/8/2007 APPLICANT
Plan Check Approved 9/20/2007 SEAN DANG
Issued 9/20/2007 VANESSA TAYLOR
Building Plans Picked Up 12/8/2008 APPLICANT
CofO in Progress 11/10/2010 FRANK BOYLE
Permit Finaled 11/24/2010 JAMES GARRISON
CofO Issued 11/24/2010 JAMES GARRISON
Permit Finaled 11/24/2010 JAMES GARRISON

Permit Application Clearance Information

DAS Clearance Cleared 7/27/2007 WAI LAU
ZA Case Cleared 8/8/2007 EMMANUELA GUTIERREZ
Title 19 building approval Cleared 9/20/2007 GHASSEM NIKKHOO

Contact Information

Architect Algaze, Nelson; Lic. No.: C21090 1524 1ST STREET      MANHATTAN BEACH, CA 90266
Contractor Owner-Builder       ,
Engineer Spracklen, Robert W; Lic. No.: S1003 2236 BEVERLY BLVD      LOS ANGELES, CA 90057

Inspector Information

ROGELIO REYNA, (310) 914-3920 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Grading Pre-Inspection 7/23/2007 Approved KYLE PAYNE
Footing/Foundation/Slab 11/7/2008 Not Ready for Inspection FRANK BOYLE
Pre-Inspection 11/7/2008 Approved FRANK BOYLE
Footing/Foundation/Slab 11/17/2008 Partial Approval FRANK BOYLE
Final 11/21/2008 Not Ready for Inspection FRANK BOYLE
SGSOV-Seismic Gas S/O Valve 11/21/2008 SGSOV Approved FRANK BOYLE
Deputy Drilled-In Anchors 11/25/2008 Approved FRANK BOYLE
Footing/Foundation/Slab 11/25/2008 Partial Approval FRANK BOYLE
Deputy Reinf. Concrete 12/4/2008 Approved FRANK BOYLE
Deputy Reinf. Concrete 12/5/2008 Approved TONY HARTONO
Footing/Foundation/Slab 12/5/2008 Partial Approval TONY HARTONO
Deputy Shotcrete 12/8/2008 Approved FRANK BOYLE
Footing/Foundation/Slab 12/8/2008 Partial Approval FRANK BOYLE
Deputy Reinf. Concrete 12/11/2008 Approved FRANK BOYLE
Deputy Reinf. Concrete 12/15/2008 Approved FRANK BOYLE
Footing/Foundation/Slab 12/18/2008 Partial Approval FRANK BOYLE
Insulation 12/18/2008 Not Ready for Inspection FRANK BOYLE
Structural Steel Frame 12/18/2008 Not Ready for Inspection FRANK BOYLE
Deputy Shotcrete 12/19/2008 Approved FRANK BOYLE
Wall Anchors 12/19/2008 Partial Approval FRANK BOYLE
Deputy Reinf. Concrete 12/22/2008 Partial Approval JEFF BYTHEWAY
Deputy Shotcrete 12/22/2008 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 12/23/2008 Partial Approval JEFF BYTHEWAY
Deputy Shotcrete 12/23/2008 Partial Approval JEFF BYTHEWAY
Footing/Foundation/Slab 12/23/2008 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 12/24/2008 Approved FRANK BOYLE
Deputy Shotcrete 12/24/2008 Approved FRANK BOYLE
Deputy Reinf. Concrete 12/26/2008 Approved FRANK BOYLE
Deputy Shotcrete 12/26/2008 Approved FRANK BOYLE
Excavation/Setback/Form/Re-Bar 12/26/2008 Partial Approval FRANK BOYLE
Footing/Foundation/Slab 12/26/2008 Partial Approval FRANK BOYLE
Insulation 12/26/2008 Partial Approval FRANK BOYLE
Reinforced Concrete Frame 12/26/2008 Partial Approval FRANK BOYLE
Deputy Reinf. Concrete 12/29/2008 Approved FRANK BOYLE
Deputy Shotcrete 12/29/2008 Approved FRANK BOYLE
Excavation/Setback/Form/Re-Bar 12/29/2008 Partial Approval FRANK BOYLE
Footing/Foundation/Slab 12/29/2008 Partial Approval FRANK BOYLE
Deputy Reinf. Concrete 12/30/2008 Approved FRANK BOYLE
Deputy Shotcrete 12/30/2008 Approved FRANK BOYLE
Deputy Reinf. Concrete 12/31/2008 Partial Approval FRANK BOYLE
Deputy Shotcrete 12/31/2008 Partial Approval FRANK BOYLE
Excavation/Setback/Form/Re-Bar 12/31/2008 Not Ready for Inspection FRANK BOYLE
Footing/Foundation/Slab 12/31/2008 Not Ready for Inspection FRANK BOYLE
Deputy Reinf. Masonry 1/2/2009 Approved FRANK BOYLE
Deputy Shotcrete 1/2/2009 Approved FRANK BOYLE
Deputy Shotcrete 1/6/2009 Approved FRANK BOYLE
Footing/Foundation/Slab 1/6/2009 Partial Approval FRANK BOYLE
Deputy Shotcrete 1/7/2009 Approved FRANK BOYLE
Deputy Shotcrete 1/8/2009 Approved FRANK BOYLE
Deputy Shotcrete 1/9/2009 Approved FRANK BOYLE
Excavation/Setback/Form/Re-Bar 1/9/2009 Partial Approval FRANK BOYLE
Deputy Drilled-In Anchors 1/12/2009 Approved FRANK BOYLE
Deputy Drilled-In Anchors 1/13/2009 Approved FRANK BOYLE
Deputy Drilled-In Anchors 1/14/2009 Approved FRANK BOYLE
Insulation 1/14/2009 Partial Approval FRANK BOYLE
Light Gage Steel Frame 1/14/2009 Partial Approval FRANK BOYLE
Deputy Drilled-In Anchors 1/15/2009 Approved FRANK BOYLE
Deputy Drilled-In Anchors 1/16/2009 Approved FRANK BOYLE
Excavation/Setback/Form/Re-Bar 1/16/2009 Partial Approval FRANK BOYLE
Footing/Foundation/Slab 1/16/2009 Partial Approval FRANK BOYLE
Wood Frame 1/16/2009 Not Ready for Inspection FRANK BOYLE
Deputy Drilled-In Anchors 1/20/2009 Approved TONY HARTONO
Deputy Reinf. Concrete 1/20/2009 Approved TONY HARTONO
Deputy Drilled-In Anchors 1/21/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 1/21/2009 Approved FRANK BOYLE
Deputy Drilled-In Anchors 1/22/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 1/22/2009 Approved FRANK BOYLE
Deputy Drilled-In Anchors 1/23/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 1/23/2009 Approved FRANK BOYLE
Deputy Drilled-In Anchors 1/26/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 1/26/2009 Approved FRANK BOYLE
Excavation/Setback/Form/Re-Bar 1/26/2009 Partial Approval FRANK BOYLE
Footing/Foundation/Slab 1/26/2009 Partial Approval FRANK BOYLE
Deputy Drilled-In Anchors 1/27/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 1/27/2009 Approved FRANK BOYLE
Footing/Foundation/Slab 1/27/2009 Partial Approval FRANK BOYLE
Wood Frame 1/27/2009 Partial Approval FRANK BOYLE
Deputy Drilled-In Anchors 1/28/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 1/28/2009 Approved FRANK BOYLE
Insulation 1/28/2009 Partial Approval FRANK BOYLE
Deputy Drilled-In Anchors 1/29/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 1/29/2009 Approved FRANK BOYLE
Deputy Drilled-In Anchors 1/30/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 1/30/2009 Approved FRANK BOYLE
Deputy Drilled-In Anchors 2/2/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 2/2/2009 Approved FRANK BOYLE
Deputy Steel/Welding 2/2/2009 Approved FRANK BOYLE
Excavation/Setback/Form/Re-Bar 2/2/2009 Partial Approval FRANK BOYLE
Deputy Drilled-In Anchors 2/3/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 2/3/2009 Approved FRANK BOYLE
Deputy Steel/Welding 2/3/2009 Approved FRANK BOYLE
Excavation/Setback/Form/Re-Bar 2/3/2009 Partial Approval FRANK BOYLE
Footing/Foundation/Slab 2/3/2009 Partial Approval FRANK BOYLE
Deputy Drilled-In Anchors 2/4/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 2/4/2009 Approved FRANK BOYLE
Deputy Steel/Welding 2/4/2009 Approved FRANK BOYLE
Deputy Drilled-In Anchors 2/5/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 2/5/2009 Approved FRANK BOYLE
Excavation/Setback/Form/Re-Bar 2/5/2009 Partial Approval FRANK BOYLE
Footing/Foundation/Slab 2/5/2009 Partial Approval FRANK BOYLE
Deputy Drilled-In Anchors 2/6/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 2/6/2009 Approved FRANK BOYLE
Excavation/Setback/Form/Re-Bar 2/6/2009 Partial Approval FRANK BOYLE
Footing/Foundation/Slab 2/6/2009 Partial Approval FRANK BOYLE
Excavation/Setback/Form/Re-Bar 2/9/2009 Partial Approval FRANK BOYLE
Footing/Foundation/Slab 2/9/2009 Partial Approval FRANK BOYLE
Deputy Reinf. Concrete 2/12/2009 Approved FRANK BOYLE
Footing/Foundation/Slab 2/12/2009 Partial Approval FRANK BOYLE
Deputy Reinf. Concrete 2/13/2009 Approved TONY HARTONO
Deputy Drilled-In Anchors 2/17/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 2/17/2009 Approved FRANK BOYLE
Deputy Shotcrete 2/17/2009 Approved FRANK BOYLE
Excavation/Setback/Form/Re-Bar 2/17/2009 Partial Approval FRANK BOYLE
Deputy Drilled-In Anchors 2/18/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 2/18/2009 Approved FRANK BOYLE
Deputy Shotcrete 2/18/2009 Approved FRANK BOYLE
Deputy Drilled-In Anchors 2/19/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 2/19/2009 Approved FRANK BOYLE
Deputy Shotcrete 2/19/2009 Approved FRANK BOYLE
Deputy Steel/Welding 2/19/2009 Approved FRANK BOYLE
Deputy Drilled-In Anchors 2/20/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 2/20/2009 Approved FRANK BOYLE
Deputy Shotcrete 2/20/2009 Approved FRANK BOYLE
Footing/Foundation/Slab 2/20/2009 Partial Approval FRANK BOYLE
Structural Steel Frame 2/20/2009 Partial Approval FRANK BOYLE
Deputy Reinf. Concrete 2/23/2009 Approved FRANK BOYLE
Deputy Reinf. Masonry 2/23/2009 Approved FRANK BOYLE
Excavation/Setback/Form/Re-Bar 2/23/2009 Partial Approval FRANK BOYLE
Footing/Foundation/Slab 2/23/2009 Partial Approval FRANK BOYLE
Deputy Reinf. Concrete 2/24/2009 Approved TONY HARTONO
Deputy Reinf. Masonry 2/24/2009 Approved TONY HARTONO
Footing/Foundation/Slab 2/24/2009 Partial Approval TONY HARTONO
Deputy Reinf. Concrete 2/25/2009 Approved FRANK BOYLE
Deputy Reinf. Masonry 2/25/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 2/26/2009 Approved FRANK BOYLE
Deputy Reinf. Masonry 2/26/2009 Approved FRANK BOYLE
Excavation/Setback/Form/Re-Bar 2/26/2009 Partial Approval FRANK BOYLE
Footing/Foundation/Slab 2/26/2009 Partial Approval FRANK BOYLE
Deputy Reinf. Concrete 2/27/2009 Approved FRANK BOYLE
Deputy Reinf. Masonry 2/27/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 3/2/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 3/3/2009 Approved FRANK BOYLE
Footing/Foundation/Slab 3/3/2009 Partial Approval FRANK BOYLE
Deputy Reinf. Concrete 3/4/2009 Approved FRANK BOYLE
Footing/Foundation/Slab 3/4/2009 Partial Approval FRANK BOYLE
Deputy Reinf. Concrete 3/5/2009 Approved FRANK BOYLE
Excavation/Setback/Form/Re-Bar 3/5/2009 Partial Approval FRANK BOYLE
Footing/Foundation/Slab 3/5/2009 Partial Approval FRANK BOYLE
Wall Anchors 3/5/2009 Partial Approval FRANK BOYLE
Deputy Reinf. Concrete 3/6/2009 Approved FRANK BOYLE
Excavation/Setback/Form/Re-Bar 3/6/2009 Partial Approval FRANK BOYLE
Deputy Drilled-In Anchors 3/16/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 3/16/2009 Approved FRANK BOYLE
Excavation/Setback/Form/Re-Bar 3/16/2009 Partial Approval FRANK BOYLE
Deputy Drilled-In Anchors 3/17/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 3/17/2009 Approved FRANK BOYLE
Footing/Foundation/Slab 3/17/2009 Partial Approval FRANK BOYLE
Deputy Drilled-In Anchors 3/18/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 3/18/2009 Approved FRANK BOYLE
Excavation/Setback/Form/Re-Bar 3/18/2009 Partial Approval FRANK BOYLE
Footing/Foundation/Slab 3/18/2009 Partial Approval FRANK BOYLE
Deputy Drilled-In Anchors 3/19/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 3/19/2009 Approved FRANK BOYLE
Footing/Foundation/Slab 3/19/2009 Partial Approval FRANK BOYLE
Deputy Drilled-In Anchors 3/20/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 3/20/2009 Approved FRANK BOYLE
Deputy Drilled-In Anchors 3/23/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 3/23/2009 Approved FRANK BOYLE
Deputy Drilled-In Anchors 3/24/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 3/24/2009 Approved FRANK BOYLE
Deputy Drilled-In Anchors 3/25/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 3/25/2009 Approved FRANK BOYLE
Footing/Foundation/Slab 3/25/2009 Partial Approval FRANK BOYLE
Deputy Drilled-In Anchors 3/26/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 3/26/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 3/27/2009 Approved FRANK BOYLE
Deputy Drilled-In Anchors 4/6/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 4/6/2009 Approved FRANK BOYLE
Deputy Drilled-In Anchors 4/7/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 4/7/2009 Approved FRANK BOYLE
Deputy Drilled-In Anchors 4/8/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 4/8/2009 Approved FRANK BOYLE
Deputy Drilled-In Anchors 4/9/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 4/9/2009 Approved FRANK BOYLE
Excavation/Setback/Form/Re-Bar 4/9/2009 Partial Approval FRANK BOYLE
Deputy Drilled-In Anchors 4/10/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 4/10/2009 Approved FRANK BOYLE
Deputy Drilled-In Anchors 4/13/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 4/13/2009 Approved FRANK BOYLE
Deputy Steel/Welding 4/13/2009 Approved FRANK BOYLE
Deputy Drilled-In Anchors 4/14/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 4/14/2009 Approved FRANK BOYLE
Deputy Steel/Welding 4/14/2009 Approved FRANK BOYLE
Deputy Drilled-In Anchors 4/15/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 4/15/2009 Approved FRANK BOYLE
Deputy Steel/Welding 4/15/2009 Approved FRANK BOYLE
Deputy Drilled-In Anchors 4/16/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 4/16/2009 Approved FRANK BOYLE
Deputy Steel/Welding 4/16/2009 Approved FRANK BOYLE
Deputy Drilled-In Anchors 4/17/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 4/17/2009 Approved FRANK BOYLE
Deputy Steel/Welding 4/17/2009 Approved FRANK BOYLE
Footing/Foundation/Slab 4/17/2009 Partial Approval FRANK BOYLE
Deputy Steel/Welding 4/20/2009 Approved FRANK BOYLE
Excavation/Setback/Form/Re-Bar 4/20/2009 Partial Approval FRANK BOYLE
Footing/Foundation/Slab 4/20/2009 Partial Approval FRANK BOYLE
Light Gage Steel Frame 4/20/2009 Partial Approval FRANK BOYLE
Deputy Steel/Welding 4/21/2009 Approved FRANK BOYLE
Footing/Foundation/Slab 4/21/2009 Partial Approval FRANK BOYLE
Excavation/Setback/Form/Re-Bar 4/27/2009 Partial Approval FRANK BOYLE
Footing/Foundation/Slab 4/27/2009 Partial Approval FRANK BOYLE
Reinforced Concrete Frame 4/27/2009 Partial Approval FRANK BOYLE
Deputy Steel/Welding 4/28/2009 Approved FRANK BOYLE
Structural Steel Frame 4/28/2009 Not Ready for Inspection FRANK BOYLE
Deputy Reinf. Concrete 4/30/2009 Approved FRANK BOYLE
Footing/Foundation/Slab 4/30/2009 Partial Approval FRANK BOYLE
Deputy Reinf. Concrete 5/1/2009 Approved CARL MAJAK
Deputy Drilled-In Anchors 5/14/2009 Approved FRANK BOYLE
Deputy Steel/Welding 5/18/2009 Approved FRANK BOYLE
Drywall Nailing 5/18/2009 Partial Approval FRANK BOYLE
Deputy Steel/Welding 5/19/2009 Approved FRANK BOYLE
Drywall Nailing 5/19/2009 Partial Approval FRANK BOYLE
Deputy Steel/Welding 5/20/2009 Approved FRANK BOYLE
Drywall Nailing 5/20/2009 Partial Approval FRANK BOYLE
Insulation 5/20/2009 Partial Approval FRANK BOYLE
Light Gage Steel Frame 5/20/2009 Partial Approval FRANK BOYLE
Deputy Steel/Welding 5/21/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 5/22/2009 Approved DENNIS MUSOLFF
Deputy Steel/Welding 5/22/2009 Approved DENNIS MUSOLFF
Deputy Reinf. Concrete 5/27/2009 Approved FRANK BOYLE
Drywall Nailing 5/27/2009 Partial Approval FRANK BOYLE
Deputy Reinf. Concrete 5/28/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 6/1/2009 Approved FRANK BOYLE
Deputy Steel/Welding 6/1/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 6/2/2009 Approved FRANK BOYLE
Deputy Steel/Welding 6/2/2009 Approved FRANK BOYLE
Deputy Steel/Welding 6/3/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 6/4/2009 Approved FRANK BOYLE
Deputy Steel/Welding 6/4/2009 Approved FRANK BOYLE
Excavation/Setback/Form/Re-Bar 6/4/2009 Partial Approval FRANK BOYLE
Footing/Foundation/Slab 6/4/2009 Partial Approval FRANK BOYLE
Deputy Reinf. Concrete 6/5/2009 Approved FRANK BOYLE
Deputy Steel/Welding 6/5/2009 Approved FRANK BOYLE
Structural Steel Frame 7/14/2009 Partial Approval FRANK BOYLE
Deputy Reinf. Masonry 7/17/2009 Approved FRANK BOYLE
Footing/Foundation/Slab 7/17/2009 Partial Approval FRANK BOYLE
Deputy Reinf. Masonry 7/20/2009 Approved FRANK BOYLE
Masonry Wall/Backfill 7/20/2009 Partial Approval FRANK BOYLE
Reinforced Masonry Frame 7/20/2009 Partial Approval FRANK BOYLE
Deputy Drilled-In Anchors 7/21/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 7/21/2009 Approved FRANK BOYLE
Deputy Reinf. Masonry 7/21/2009 Approved FRANK BOYLE
Deputy Steel/Welding 7/21/2009 Approved FRANK BOYLE
Deputy Drilled-In Anchors 7/22/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 7/22/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 7/23/2009 Approved FRANK BOYLE
Deputy Drilled-In Anchors 7/28/2009 Approved FRANK BOYLE
Footing/Foundation/Slab 7/28/2009 Partial Approval FRANK BOYLE
Insulation 7/30/2009 Partial Approval FRANK BOYLE
Light Gage Steel Frame 7/30/2009 Partial Approval FRANK BOYLE
Deputy Drilled-In Anchors 8/3/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 8/3/2009 Approved FRANK BOYLE
Deputy Reinf. Masonry 8/3/2009 Approved FRANK BOYLE
Deputy Drilled-In Anchors 8/4/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 8/4/2009 Approved FRANK BOYLE
Deputy Reinf. Masonry 8/4/2009 Approved FRANK BOYLE
Deputy Drilled-In Anchors 8/5/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 8/5/2009 Approved FRANK BOYLE
Deputy Reinf. Masonry 8/5/2009 Approved FRANK BOYLE
Deputy Drilled-In Anchors 8/6/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 8/6/2009 Approved FRANK BOYLE
Deputy Reinf. Masonry 8/6/2009 Approved FRANK BOYLE
Deputy Drilled-In Anchors 8/7/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 8/7/2009 Approved FRANK BOYLE
Deputy Reinf. Masonry 8/7/2009 Approved FRANK BOYLE
Drywall Nailing 8/7/2009 Partial Approval FRANK BOYLE
Excavation/Setback/Form/Re-Bar 8/7/2009 Partial Approval FRANK BOYLE
Light Gage Steel Frame 8/7/2009 Partial Approval FRANK BOYLE
Deputy Drilled-In Anchors 8/18/2009 Approved NICK LAROCCA
Deputy Reinf. Concrete 8/18/2009 Approved NICK LAROCCA
Deputy Drilled-In Anchors 8/19/2009 Approved TONY HARTONO
Deputy Reinf. Concrete 8/19/2009 Approved TONY HARTONO
Excavation/Setback/Form/Re-Bar 8/20/2009 Partial Approval TONY HARTONO
Deputy Reinf. Concrete 8/24/2009 Approved FRANK BOYLE
Insulation 8/24/2009 Partial Approval FRANK BOYLE
Light Gage Steel Frame 8/24/2009 Partial Approval FRANK BOYLE
Insulation 8/26/2009 Partial Approval FRANK BOYLE
Drywall Nailing 8/27/2009 Partial Approval FRANK BOYLE
Interior/Exterior Lathing 8/27/2009 Partial Approval FRANK BOYLE
Light Gage Steel Frame 8/27/2009 Partial Approval FRANK BOYLE
Drywall Nailing 8/31/2009 Partial Approval FRANK BOYLE
Interior/Exterior Lathing 8/31/2009 Partial Approval FRANK BOYLE
Drywall Nailing 9/3/2009 Partial Approval FRANK BOYLE
Deputy Reinf. Concrete 10/6/2009 Approved FRANK BOYLE
Insulation 10/6/2009 Partial Approval FRANK BOYLE
Light Gage Steel Frame 10/6/2009 Partial Approval FRANK BOYLE
Deputy Reinf. Concrete 10/7/2009 Approved FRANK BOYLE
Excavation/Setback/Form/Re-Bar 10/9/2009 Partial Approval FRANK BOYLE
Insulation 10/9/2009 Partial Approval FRANK BOYLE
Interior/Exterior Lathing 10/9/2009 Partial Approval FRANK BOYLE
Reinforced Concrete Frame 10/9/2009 Partial Approval FRANK BOYLE
Deputy Reinf. Concrete 10/30/2009 Approved FRANK BOYLE
Deputy Reinf. Concrete 11/4/2009 Approved FRANK BOYLE
Excavation/Setback/Form/Re-Bar 11/6/2009 Partial Approval FRANK BOYLE
Reinforced Concrete Frame 11/6/2009 Partial Approval FRANK BOYLE
Excavation/Setback/Form/Re-Bar 12/10/2009 Partial Approval FRANK BOYLE
Deputy Reinf. Concrete 12/16/2009 Approved FRANK BOYLE
Excavation/Setback/Form/Re-Bar 12/16/2009 Partial Approval FRANK BOYLE
Footing/Foundation/Slab 12/16/2009 Partial Approval FRANK BOYLE
Deputy Reinf. Concrete 12/21/2009 Approved FRANK BOYLE
Excavation/Setback/Form/Re-Bar 12/21/2009 Partial Approval FRANK BOYLE
Footing/Foundation/Slab 12/21/2009 Partial Approval FRANK BOYLE
Deputy Reinf. Concrete 12/23/2009 Approved FRANK BOYLE
Excavation/Setback/Form/Re-Bar 12/28/2009 Partial Approval FRANK BOYLE
Footing/Foundation/Slab 12/28/2009 Partial Approval FRANK BOYLE
Light Gage Steel Frame 12/28/2009 Partial Approval FRANK BOYLE
Excavation/Setback/Form/Re-Bar 1/4/2010 Partial Approval FRANK BOYLE
Footing/Foundation/Slab 1/4/2010 Partial Approval FRANK BOYLE
Light Gage Steel Frame 1/4/2010 Partial Approval FRANK BOYLE
SGSOV-Seismic Gas S/O Valve 1/5/2010 SGSOV Not Ready FRANK BOYLE
Special/Order Compliance 1/5/2010 Approved FRANK BOYLE
Final 5/5/2010 Not Ready for Inspection FRANK BOYLE
Final 6/14/2010 Partial Inspection FRANK BOYLE
Final 10/18/2010 OK to Issue CofO FRANK BOYLE
Light Gage Steel Frame 10/18/2010 Approved FRANK BOYLE