Grading Pre-Inspection
|
7/23/2007
|
Approved
|
KYLE PAYNE
|
|
Footing/Foundation/Slab
|
11/7/2008
|
Not Ready for Inspection
|
FRANK BOYLE
|
|
Pre-Inspection
|
11/7/2008
|
Approved
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
11/17/2008
|
Partial Approval
|
FRANK BOYLE
|
|
Final
|
11/21/2008
|
Not Ready for Inspection
|
FRANK BOYLE
|
|
SGSOV-Seismic Gas S/O Valve
|
11/21/2008
|
SGSOV Approved
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
11/25/2008
|
Approved
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
11/25/2008
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
12/4/2008
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
12/5/2008
|
Approved
|
TONY HARTONO
|
|
Footing/Foundation/Slab
|
12/5/2008
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Shotcrete
|
12/8/2008
|
Approved
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
12/8/2008
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
12/11/2008
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
12/15/2008
|
Approved
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
12/18/2008
|
Partial Approval
|
FRANK BOYLE
|
|
Insulation
|
12/18/2008
|
Not Ready for Inspection
|
FRANK BOYLE
|
|
Structural Steel Frame
|
12/18/2008
|
Not Ready for Inspection
|
FRANK BOYLE
|
|
Deputy Shotcrete
|
12/19/2008
|
Approved
|
FRANK BOYLE
|
|
Wall Anchors
|
12/19/2008
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
12/22/2008
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
12/22/2008
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
12/23/2008
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Shotcrete
|
12/23/2008
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Footing/Foundation/Slab
|
12/23/2008
|
Partial Approval
|
JEFF BYTHEWAY
|
|
Deputy Reinf. Concrete
|
12/24/2008
|
Approved
|
FRANK BOYLE
|
|
Deputy Shotcrete
|
12/24/2008
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
12/26/2008
|
Approved
|
FRANK BOYLE
|
|
Deputy Shotcrete
|
12/26/2008
|
Approved
|
FRANK BOYLE
|
|
Excavation/Setback/Form/Re-Bar
|
12/26/2008
|
Partial Approval
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
12/26/2008
|
Partial Approval
|
FRANK BOYLE
|
|
Insulation
|
12/26/2008
|
Partial Approval
|
FRANK BOYLE
|
|
Reinforced Concrete Frame
|
12/26/2008
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
12/29/2008
|
Approved
|
FRANK BOYLE
|
|
Deputy Shotcrete
|
12/29/2008
|
Approved
|
FRANK BOYLE
|
|
Excavation/Setback/Form/Re-Bar
|
12/29/2008
|
Partial Approval
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
12/29/2008
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
12/30/2008
|
Approved
|
FRANK BOYLE
|
|
Deputy Shotcrete
|
12/30/2008
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
12/31/2008
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Shotcrete
|
12/31/2008
|
Partial Approval
|
FRANK BOYLE
|
|
Excavation/Setback/Form/Re-Bar
|
12/31/2008
|
Not Ready for Inspection
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
12/31/2008
|
Not Ready for Inspection
|
FRANK BOYLE
|
|
Deputy Reinf. Masonry
|
1/2/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Shotcrete
|
1/2/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Shotcrete
|
1/6/2009
|
Approved
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
1/6/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Shotcrete
|
1/7/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Shotcrete
|
1/8/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Shotcrete
|
1/9/2009
|
Approved
|
FRANK BOYLE
|
|
Excavation/Setback/Form/Re-Bar
|
1/9/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
1/12/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
1/13/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
1/14/2009
|
Approved
|
FRANK BOYLE
|
|
Insulation
|
1/14/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Light Gage Steel Frame
|
1/14/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
1/15/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
1/16/2009
|
Approved
|
FRANK BOYLE
|
|
Excavation/Setback/Form/Re-Bar
|
1/16/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
1/16/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Wood Frame
|
1/16/2009
|
Not Ready for Inspection
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
1/20/2009
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
1/20/2009
|
Approved
|
TONY HARTONO
|
|
Deputy Drilled-In Anchors
|
1/21/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
1/21/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
1/22/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
1/22/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
1/23/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
1/23/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
1/26/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
1/26/2009
|
Approved
|
FRANK BOYLE
|
|
Excavation/Setback/Form/Re-Bar
|
1/26/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
1/26/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
1/27/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
1/27/2009
|
Approved
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
1/27/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Wood Frame
|
1/27/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
1/28/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
1/28/2009
|
Approved
|
FRANK BOYLE
|
|
Insulation
|
1/28/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
1/29/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
1/29/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
1/30/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
1/30/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
2/2/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
2/2/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Steel/Welding
|
2/2/2009
|
Approved
|
FRANK BOYLE
|
|
Excavation/Setback/Form/Re-Bar
|
2/2/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
2/3/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
2/3/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Steel/Welding
|
2/3/2009
|
Approved
|
FRANK BOYLE
|
|
Excavation/Setback/Form/Re-Bar
|
2/3/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
2/3/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
2/4/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
2/4/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Steel/Welding
|
2/4/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
2/5/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
2/5/2009
|
Approved
|
FRANK BOYLE
|
|
Excavation/Setback/Form/Re-Bar
|
2/5/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
2/5/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
2/6/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
2/6/2009
|
Approved
|
FRANK BOYLE
|
|
Excavation/Setback/Form/Re-Bar
|
2/6/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
2/6/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Excavation/Setback/Form/Re-Bar
|
2/9/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
2/9/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
2/12/2009
|
Approved
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
2/12/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
2/13/2009
|
Approved
|
TONY HARTONO
|
|
Deputy Drilled-In Anchors
|
2/17/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
2/17/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Shotcrete
|
2/17/2009
|
Approved
|
FRANK BOYLE
|
|
Excavation/Setback/Form/Re-Bar
|
2/17/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
2/18/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
2/18/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Shotcrete
|
2/18/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
2/19/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
2/19/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Shotcrete
|
2/19/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Steel/Welding
|
2/19/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
2/20/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
2/20/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Shotcrete
|
2/20/2009
|
Approved
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
2/20/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Structural Steel Frame
|
2/20/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
2/23/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Masonry
|
2/23/2009
|
Approved
|
FRANK BOYLE
|
|
Excavation/Setback/Form/Re-Bar
|
2/23/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
2/23/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
2/24/2009
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Masonry
|
2/24/2009
|
Approved
|
TONY HARTONO
|
|
Footing/Foundation/Slab
|
2/24/2009
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
2/25/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Masonry
|
2/25/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
2/26/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Masonry
|
2/26/2009
|
Approved
|
FRANK BOYLE
|
|
Excavation/Setback/Form/Re-Bar
|
2/26/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
2/26/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
2/27/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Masonry
|
2/27/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
3/2/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
3/3/2009
|
Approved
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
3/3/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
3/4/2009
|
Approved
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
3/4/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
3/5/2009
|
Approved
|
FRANK BOYLE
|
|
Excavation/Setback/Form/Re-Bar
|
3/5/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
3/5/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Wall Anchors
|
3/5/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
3/6/2009
|
Approved
|
FRANK BOYLE
|
|
Excavation/Setback/Form/Re-Bar
|
3/6/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
3/16/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
3/16/2009
|
Approved
|
FRANK BOYLE
|
|
Excavation/Setback/Form/Re-Bar
|
3/16/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
3/17/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
3/17/2009
|
Approved
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
3/17/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
3/18/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
3/18/2009
|
Approved
|
FRANK BOYLE
|
|
Excavation/Setback/Form/Re-Bar
|
3/18/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
3/18/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
3/19/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
3/19/2009
|
Approved
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
3/19/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
3/20/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
3/20/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
3/23/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
3/23/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
3/24/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
3/24/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
3/25/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
3/25/2009
|
Approved
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
3/25/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
3/26/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
3/26/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
3/27/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
4/6/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
4/6/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
4/7/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
4/7/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
4/8/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
4/8/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
4/9/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
4/9/2009
|
Approved
|
FRANK BOYLE
|
|
Excavation/Setback/Form/Re-Bar
|
4/9/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
4/10/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
4/10/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
4/13/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
4/13/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Steel/Welding
|
4/13/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
4/14/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
4/14/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Steel/Welding
|
4/14/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
4/15/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
4/15/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Steel/Welding
|
4/15/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
4/16/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
4/16/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Steel/Welding
|
4/16/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
4/17/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
4/17/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Steel/Welding
|
4/17/2009
|
Approved
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
4/17/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Steel/Welding
|
4/20/2009
|
Approved
|
FRANK BOYLE
|
|
Excavation/Setback/Form/Re-Bar
|
4/20/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
4/20/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Light Gage Steel Frame
|
4/20/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Steel/Welding
|
4/21/2009
|
Approved
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
4/21/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Excavation/Setback/Form/Re-Bar
|
4/27/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
4/27/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Reinforced Concrete Frame
|
4/27/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Steel/Welding
|
4/28/2009
|
Approved
|
FRANK BOYLE
|
|
Structural Steel Frame
|
4/28/2009
|
Not Ready for Inspection
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
4/30/2009
|
Approved
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
4/30/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
5/1/2009
|
Approved
|
CARL MAJAK
|
|
Deputy Drilled-In Anchors
|
5/14/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Steel/Welding
|
5/18/2009
|
Approved
|
FRANK BOYLE
|
|
Drywall Nailing
|
5/18/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Steel/Welding
|
5/19/2009
|
Approved
|
FRANK BOYLE
|
|
Drywall Nailing
|
5/19/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Steel/Welding
|
5/20/2009
|
Approved
|
FRANK BOYLE
|
|
Drywall Nailing
|
5/20/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Insulation
|
5/20/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Light Gage Steel Frame
|
5/20/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Steel/Welding
|
5/21/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
5/22/2009
|
Approved
|
DENNIS MUSOLFF
|
|
Deputy Steel/Welding
|
5/22/2009
|
Approved
|
DENNIS MUSOLFF
|
|
Deputy Reinf. Concrete
|
5/27/2009
|
Approved
|
FRANK BOYLE
|
|
Drywall Nailing
|
5/27/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
5/28/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
6/1/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Steel/Welding
|
6/1/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
6/2/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Steel/Welding
|
6/2/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Steel/Welding
|
6/3/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
6/4/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Steel/Welding
|
6/4/2009
|
Approved
|
FRANK BOYLE
|
|
Excavation/Setback/Form/Re-Bar
|
6/4/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
6/4/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
6/5/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Steel/Welding
|
6/5/2009
|
Approved
|
FRANK BOYLE
|
|
Structural Steel Frame
|
7/14/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Reinf. Masonry
|
7/17/2009
|
Approved
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
7/17/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Reinf. Masonry
|
7/20/2009
|
Approved
|
FRANK BOYLE
|
|
Masonry Wall/Backfill
|
7/20/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Reinforced Masonry Frame
|
7/20/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
7/21/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
7/21/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Masonry
|
7/21/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Steel/Welding
|
7/21/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
7/22/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
7/22/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
7/23/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
7/28/2009
|
Approved
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
7/28/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Insulation
|
7/30/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Light Gage Steel Frame
|
7/30/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
8/3/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
8/3/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Masonry
|
8/3/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
8/4/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
8/4/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Masonry
|
8/4/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
8/5/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
8/5/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Masonry
|
8/5/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
8/6/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
8/6/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Masonry
|
8/6/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
8/7/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
8/7/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Masonry
|
8/7/2009
|
Approved
|
FRANK BOYLE
|
|
Drywall Nailing
|
8/7/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Excavation/Setback/Form/Re-Bar
|
8/7/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Light Gage Steel Frame
|
8/7/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Drilled-In Anchors
|
8/18/2009
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
8/18/2009
|
Approved
|
NICK LAROCCA
|
|
Deputy Drilled-In Anchors
|
8/19/2009
|
Approved
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
8/19/2009
|
Approved
|
TONY HARTONO
|
|
Excavation/Setback/Form/Re-Bar
|
8/20/2009
|
Partial Approval
|
TONY HARTONO
|
|
Deputy Reinf. Concrete
|
8/24/2009
|
Approved
|
FRANK BOYLE
|
|
Insulation
|
8/24/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Light Gage Steel Frame
|
8/24/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Insulation
|
8/26/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Drywall Nailing
|
8/27/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Interior/Exterior Lathing
|
8/27/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Light Gage Steel Frame
|
8/27/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Drywall Nailing
|
8/31/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Interior/Exterior Lathing
|
8/31/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Drywall Nailing
|
9/3/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
10/6/2009
|
Approved
|
FRANK BOYLE
|
|
Insulation
|
10/6/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Light Gage Steel Frame
|
10/6/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
10/7/2009
|
Approved
|
FRANK BOYLE
|
|
Excavation/Setback/Form/Re-Bar
|
10/9/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Insulation
|
10/9/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Interior/Exterior Lathing
|
10/9/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Reinforced Concrete Frame
|
10/9/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
10/30/2009
|
Approved
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
11/4/2009
|
Approved
|
FRANK BOYLE
|
|
Excavation/Setback/Form/Re-Bar
|
11/6/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Reinforced Concrete Frame
|
11/6/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Excavation/Setback/Form/Re-Bar
|
12/10/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
12/16/2009
|
Approved
|
FRANK BOYLE
|
|
Excavation/Setback/Form/Re-Bar
|
12/16/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
12/16/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
12/21/2009
|
Approved
|
FRANK BOYLE
|
|
Excavation/Setback/Form/Re-Bar
|
12/21/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
12/21/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Deputy Reinf. Concrete
|
12/23/2009
|
Approved
|
FRANK BOYLE
|
|
Excavation/Setback/Form/Re-Bar
|
12/28/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
12/28/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Light Gage Steel Frame
|
12/28/2009
|
Partial Approval
|
FRANK BOYLE
|
|
Excavation/Setback/Form/Re-Bar
|
1/4/2010
|
Partial Approval
|
FRANK BOYLE
|
|
Footing/Foundation/Slab
|
1/4/2010
|
Partial Approval
|
FRANK BOYLE
|
|
Light Gage Steel Frame
|
1/4/2010
|
Partial Approval
|
FRANK BOYLE
|
|
SGSOV-Seismic Gas S/O Valve
|
1/5/2010
|
SGSOV Not Ready
|
FRANK BOYLE
|
|
Special/Order Compliance
|
1/5/2010
|
Approved
|
FRANK BOYLE
|
|
Final
|
5/5/2010
|
Not Ready for Inspection
|
FRANK BOYLE
|
|
Final
|
6/14/2010
|
Partial Inspection
|
FRANK BOYLE
|
|
Final
|
10/18/2010
|
OK to Issue CofO
|
FRANK BOYLE
|
|
Light Gage Steel Frame
|
10/18/2010
|
Approved
|
FRANK BOYLE
|