15801 W MULHOLLAND PL 90049

Certificate Information: 15801 W MULHOLLAND PL 90049

Application / Permit
07010-20004-01722
Plan Check / Job No.
B20VN07952
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
SUPPLEMENTAL TO ORIGINAL PERMIT #: 07010-20000-01722 TO ADD IRREGULAR 18'-5" X 40'-0" TO EXPAND (E) BASEMENT; RELOCATE STAIRS; REMODEL FLOOR PLAN THROUGHOUT (E) 2-STORY SFD; CORRECT OVERALL BUILDING HEIGHT. ALL WORK PER NEW ENGINEER OF RECORD.
Permit Issued
Issued on 9/15/2021
Issuing Office
Current Status
Permit Finaled on 6/3/2026
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 6/17/2020 APPLICANT
Assigned to Plan Check Engineer 6/24/2020 JENNIFER LEE
Corrections Issued 6/24/2020 JENNIFER LEE
Applicant returned to address corrections 11/19/2020 JENNIFER LEE
Applicant returned to address corrections 11/23/2020 JENNIFER LEE
Applicant returned to address corrections 8/10/2021 JENNIFER LEE
Plan Check Approved 9/14/2021 JENNIFER LEE
Issued 9/15/2021 APPLICANT
Building Plans Picked Up 9/15/2021 APPLICANT
Permit Finaled 6/3/2026 THOMAS FINNILA

Permit Application Clearance Information

Miscellaneous Cleared 6/1/2021 LAUREN PADICK
Specific Plan Cleared 6/1/2021 LAUREN PADICK

Contact Information

Architect Dua,, Anuj; Lic. No.: C37444 1050 LATIN WAY      LOS ANGELES, CA 90065
Contractor Owner-Builder       ,
Engineer Ekmekji,, Steve Eli; Lic. No.: C66727 19281 BERCLAIR LANE      TARZANA, CA 91356
Engineer Salehipour,, Sassan A; Lic. No.: GE2579 1290 N LAKE AVENUE #204      PASADENA, CA 91104

Inspector Information

THOMAS FINNILA, (818) 774-4324 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 1/10/2022 Approved DAVID SANDOVAL
Deputy Drilled-In Anchors 2/23/2022 Conditional Approval JESUS PINEDA
Excavation/Setback/Form/Re-Bar 3/10/2022 Not Ready for Inspection DAVID SANDOVAL
Footing/Foundation/Slab 3/10/2022 Not Ready for Inspection DAVID SANDOVAL
PLUMBING-Rough 3/10/2022 Not Ready for Inspection DAVID SANDOVAL
Sewer 3/10/2022 Not Ready for Inspection DAVID SANDOVAL
Underground Mechanical 3/10/2022 Partial Approval DAVID SANDOVAL
Deputy Reinf. Concrete 3/15/2022 Partial Approval DAVID SANDOVAL
Excavation/Setback/Form/Re-Bar 3/15/2022 Partial Approval DAVID SANDOVAL
Footing/Foundation/Slab 3/15/2022 Partial Approval DAVID SANDOVAL
Deputy Reinf. Concrete 3/18/2022 Conditional Approval DAVID SANDOVAL
Deputy Other (see comments) 4/11/2022 Conditional Approval JUSTIN HAWLEY
Excavation/Setback/Form/Re-Bar 4/11/2022 Partial Approval SEAN HAUPT
Footing/Foundation/Slab 4/11/2022 Partial Approval SEAN HAUPT
Reinforced Concrete Frame 4/11/2022 Partial Approval SEAN HAUPT
Deputy Drilled-In Anchors 4/14/2022 Conditional Approval KRISTEN CAUSEY
Excavation/Setback/Form/Re-Bar 4/19/2022 Partial Approval DAVID SANDOVAL
Footing/Foundation/Slab 4/19/2022 Partial Approval DAVID SANDOVAL
Reinforced Concrete Frame 4/19/2022 Partial Approval DAVID SANDOVAL
Deputy Reinf. Concrete 4/20/2022 Conditional Approval DAVID SANDOVAL
Deputy Other (see comments) 5/20/2022 Conditional Approval STEVEN BACK
Deputy Drilled-In Anchors 5/26/2022 Conditional Approval MORRIS JACKSON
Excavation/Setback/Form/Re-Bar 5/27/2022 Not Ready for Inspection DAVID SANDOVAL
Footing/Foundation/Slab 5/27/2022 Not Ready for Inspection DAVID SANDOVAL
Deputy Reinf. Concrete 5/31/2022 Conditional Approval MORRIS JACKSON
Excavation/Setback/Form/Re-Bar 6/21/2022 Partial Approval VINCENT HANLEY
Footing/Foundation/Slab 6/21/2022 Partial Approval VINCENT HANLEY
Deputy Drilled-In Anchors 6/22/2022 Conditional Approval KRISTEN CAUSEY
Deputy Reinf. Concrete 6/24/2022 Approved VINCENT HANLEY
Excavation/Setback/Form/Re-Bar 7/5/2022 Approved VINCENT HANLEY
Footing/Foundation/Slab 7/5/2022 Approved VINCENT HANLEY
Deputy Reinf. Concrete 7/6/2022 Conditional Approval MORRIS JACKSON
Deputy Drilled-In Anchors 10/17/2022 Conditional Approval JESUS PINEDA
Underground Mechanical 10/18/2022 Partial Approval VINCENT HANLEY
Deputy Drilled-In Anchors 2/22/2023 Approved VINCENT HANLEY
Excavation/Setback/Form/Re-Bar 2/27/2023 Partial Approval VINCENT HANLEY
Deputy Reinf. Concrete 3/3/2023 Approved VINCENT HANLEY
BUILDING-Rough-Frame 9/27/2023 Partial Approval VINCENT HANLEY
Floor/Roof Diaphrgm/Shear Wall 9/27/2023 Partial Approval VINCENT HANLEY
Green Building Rough 9/27/2023 Not Ready for Inspection VINCENT HANLEY
MERV13>=Rough 9/27/2023 Not Ready for Inspection VINCENT HANLEY
Verify Sprinkler Sign Off 9/27/2023 Not Ready for Inspection VINCENT HANLEY
Wood Frame 9/27/2023 Partial Approval VINCENT HANLEY
Deputy Steel/Welding 10/13/2023 Partial Approval VINCENT HANLEY
Floor/Roof Diaphrgm/Shear Wall 11/2/2023 Partial Approval VINCENT HANLEY
Wood Frame 11/2/2023 Partial Approval VINCENT HANLEY
Floor/Roof Diaphrgm/Shear Wall 12/19/2023 Partial Approval VINCENT HANLEY
Floor/Roof Diaphrgm/Shear Wall 1/12/2024 Approved VINCENT HANLEY
Floor/Roof Diaphrgm/Shear Wall 7/5/2024 Partial Approval THOMAS FINNILA
PLUMBING-Rough 11/18/2024 Conditional Approval THOMAS FINNILA
ELECTRICAL-Rough 1/23/2025 Approved SEAN WIRCH
PLUMBING-Rough 1/23/2025 Approved SEAN WIRCH
Wood Frame 7/15/2025 Corrections Issued THOMAS FINNILA