8633 W HOLLYWOOD BLVD 90069

Certificate Information: 8633 W HOLLYWOOD BLVD 90069

Application / Permit
06010-10000-03853
Plan Check / Job No.
B06LA09207
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
CONSTRUCTION OF NEW 3 STORY HOUSE OVER GARAGE
Permit Issued
Issued on 7/1/2008
Issuing Office
Metro
Current Status
CofO Issued on 6/29/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/25/2006 APPLICANT
Assigned to Plan Check Engineer 10/13/2006 LARRY LEE
Corrections Issued 10/14/2006 LARRY LEE
Quality Review Completed 10/18/2006 PETER KIM
Building Plans Picked Up 10/26/2006 APPLICANT
Applicant returned to address corrections 3/27/2007 LARRY LEE
Applicant returned to address corrections 3/28/2007 LARRY LEE
Applicant returned to address corrections 8/29/2007 LARRY LEE
Applicant returned to address corrections 11/7/2007 LARRY LEE
Applicant returned to address corrections 11/21/2007 LARRY LEE
Plan Check Approved 5/14/2008 LARRY LEE
Issued 7/1/2008 LADBS
CofO in Progress 6/17/2025 ROY SPAULDING
Permit Finaled 6/29/2025 DEROLD HAUFF
CofO Issued 6/29/2025 DEROLD HAUFF
Permit Finaled 6/29/2025 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 8/29/2007 NANCY ZAMORA
Eng Process Fee Ord 176,300 Cleared 8/29/2007 NATALIE MOORE
Highway dedication Cleared 8/29/2007 TAO YANG
Hillside ordinance Cleared 8/29/2007 NATALIE MOORE
Hillside ordinance Cleared 8/29/2007 TAO YANG
Hillside ordinance Cleared 8/29/2007 TAO YANG
Hillside ordinance Cleared 8/29/2007 TAO YANG
Hillside ordinance Cleared 8/29/2007 TAO YANG
Permit Cleared 8/29/2007 NATALIE MOORE
Roof/Waste drainage to street Cleared 8/29/2007 NATALIE MOORE
Sewer availability Cleared 8/29/2007 NATALIE MOORE
Miscellaneous Cleared 9/11/2007 LARRY LEE
ZA Case Cleared 5/14/2008 LOURDES GREEN
Excavation more than 5-ft deep Cleared 7/1/2008 CALOSHA APPROVED

Contact Information

Engineer Sayah, Daniel Hoshyar; Lic. No.: C67905 10660 WILSHIRE BLVD APT 508      LOS ANGELES, CA 90024

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Grading Pre-Inspection 9/2/2006 Approved DAVID CAPTAIN
Posting Pre-Inspection 9/2/2006 Approved DAVID CAPTAIN
Footing/Foundation/Slab 10/23/2008 Partial Approval WILLIAM MITCHELL
Deputy Reinf. Concrete 10/24/2008 Approved BRAD BESCOS
Deputy Reinf. Concrete 10/27/2008 Approved WILLIAM MITCHELL
Footing/Foundation/Slab 12/2/2008 Partial Approval BRAD BESCOS
Deputy Reinf. Concrete 12/9/2008 Approved BRAD BESCOS
Deputy Reinf. Concrete 12/11/2008 Approved BRAD BESCOS
Deputy Drilled-In Anchors 1/13/2009 Approved BRAD BESCOS
Sewer 1/15/2009 Partial Approval BRAD BESCOS
Deputy Reinf. Concrete 2/3/2009 No Access for Inspection BRAD BESCOS
Footing/Foundation/Slab 2/4/2009 Partial Approval BRAD BESCOS
Deputy Reinf. Concrete 2/11/2009 No Access for Inspection BRAD BESCOS
Footing/Foundation/Slab 3/10/2009 Approved BRAD BESCOS
Special/Order Compliance 6/25/2009 Approved BRAD BESCOS
Deputy Drilled-In Anchors 7/15/2009 Partial Approval BRAD BESCOS
Masonry Wall/Backfill 7/15/2009 Corrections Issued BRAD BESCOS
Deputy Drilled-In Anchors 7/21/2009 Conditional Approval MICHAEL FAUNCE
Reinforced Masonry Frame 7/21/2009 Not Ready for Inspection MICHAEL FAUNCE
Verify Sprinkler Sign Off 7/21/2009 Not Ready for Inspection MICHAEL FAUNCE
Masonry Wall/Backfill 7/28/2009 Not Ready for Inspection WILLIAM MITCHELL
Masonry Wall/Backfill 7/31/2009 Corrections Issued BRAD BESCOS
Pre-Inspection 8/6/2009 Corrections Issued MICHAEL FAUNCE
Special/Order Compliance 8/6/2009 Partial Inspection BRAD BESCOS
Masonry Wall/Backfill 8/10/2009 Partial Approval BRAD BESCOS
PLUMBING-Rough 8/10/2009 Partial Approval BRAD BESCOS
Deputy Drilled-In Anchors 9/9/2009 No Access for Inspection BRAD BESCOS
Footing/Foundation/Slab 9/30/2009 Conditional Approval BRAD BESCOS
BUILDING-Rough-Frame 2/24/2010 Not Ready for Inspection MICHAEL FAUNCE
Floor/Roof Diaphrgm/Shear Wall 2/24/2010 Not Ready for Inspection MICHAEL FAUNCE
Verify Sprinkler Sign Off 2/24/2010 Not Ready for Inspection MICHAEL FAUNCE
Deputy Drilled-In Anchors 7/19/2010 Approved BRAD BESCOS
Deputy Drilled-In Anchors 7/28/2010 Approved RONALD COWAN
Deputy Drilled-In Anchors 8/24/2010 Approved ENRIQUE MIRELES
Floor/Roof Diaphrgm/Shear Wall 10/13/2010 Corrections Issued BRAD BESCOS
Verify Sprinkler Sign Off 10/13/2010 Approved BRAD BESCOS
Floor/Roof Diaphrgm/Shear Wall 12/6/2010 Not Ready for Inspection BRAD BESCOS
Footing/Foundation/Slab 2/8/2011 Partial Approval GARY KERR
Wood Frame 8/10/2011 Partial Approval BRAD BESCOS
Special/Order Compliance 5/22/2013 No Access for Inspection BRAD BESCOS
Final 9/24/2013 Not Ready for Inspection BRAD BESCOS
Pre-Inspection 5/24/2022 Corrections Issued RAUL BARAJAS
Pre-Inspection 6/6/2022 No Access for Inspection ALIZAH MAYAGOITIA
Pre-Inspection 6/9/2022 Corrections Issued RAUL BARAJAS
Grading Pre-Inspection 10/31/2023 Partial Inspection RUSSELL BONVOULOIR
Pre-Inspection 11/2/2023 Partial Inspection STUART CHAPMAN
Pre-Inspection 4/3/2024 Corrections Issued RAUL BARAJAS
HVAC-Rough 10/31/2024 Corrections Issued CRAIG VAUGHAN
PLUMBING-Rough 10/31/2024 Corrections Issued CRAIG VAUGHAN
BUILDING-Rough-Frame 11/6/2024 Not Ready for Inspection RAUL BARAJAS
PLUMBING-Rough 11/6/2024 Not Ready for Inspection RAUL BARAJAS
Gas Test 11/19/2024 Approved RAUL BARAJAS
BUILDING-Rough-Frame 11/21/2024 Corrections Issued RAUL BARAJAS
PLUMBING-Rough 11/21/2024 Partial Approval RAUL BARAJAS
BUILDING-Rough-Frame 1/15/2025 Corrections Issued RAUL BARAJAS
Shower Pan 1/15/2025 Approved RAUL BARAJAS
Insulation 1/16/2025 Not Ready for Inspection ROY SPAULDING
BUILDING-Rough-Frame 1/21/2025 Approved RAUL BARAJAS
Interior/Exterior Lathing 1/22/2025 Not Ready for Inspection ROY SPAULDING
Drywall Nailing 1/28/2025 Approved ROY SPAULDING
Interior/Exterior Lathing 1/28/2025 Approved ROY SPAULDING
Service/Power Release 3/13/2025 Corrections Issued ROY SPAULDING
Service/Power Release 3/19/2025 Partial Inspection ROY SPAULDING
Service/Power Release 3/27/2025 Corrections Issued ROY SPAULDING
Service/Power Release 4/11/2025 Not Ready for Inspection ALIZAH MAYAGOITIA
Gas Test 4/14/2025 Not Ready for Inspection ROY SPAULDING
Gas Test 4/17/2025 Corrections Issued ROY SPAULDING
Service/Power Release 4/17/2025 Corrections Issued ROY SPAULDING
Gas Test 4/21/2025 Partial Approval ROY SPAULDING
Service/Power Release 4/21/2025 Approved ROY SPAULDING
HVAC-Final 4/29/2025 Not Ready for Inspection ROY SPAULDING
PLUMBING-Final 4/29/2025 Corrections Issued ROY SPAULDING
ELECTRICAL-Final 5/1/2025 Corrections Issued ROY SPAULDING
ELECTRICAL-Final 5/8/2025 Corrections Issued ROY SPAULDING
HVAC-Final 5/8/2025 Corrections Issued ROY SPAULDING
PLUMBING-Final 5/8/2025 Approved ROY SPAULDING
ELECTRICAL-Final 5/29/2025 Not Ready for Inspection ROY SPAULDING
Final 5/29/2025 Corrections Issued ROY SPAULDING
Floor/Roof Diaphrgm/Shear Wall 5/29/2025 Approved ROY SPAULDING
Footing/Foundation/Slab 5/29/2025 Approved ROY SPAULDING
HVAC-Final 5/29/2025 Not Ready for Inspection ROY SPAULDING
PLUMBING-Final 5/29/2025 Approved ROY SPAULDING
Reinforced Masonry Frame 5/29/2025 Approved ROY SPAULDING
SGSOV-Seismic Gas S/O Valve 5/29/2025 SGSOV Not Ready ROY SPAULDING
Wood Frame 5/29/2025 Approved ROY SPAULDING
Final 6/9/2025 Corrections Issued ROY SPAULDING
SGSOV-Seismic Gas S/O Valve 6/9/2025 SGSOV Not Ready ROY SPAULDING
Final 6/11/2025 Corrections Issued BRENDAN MORELLI
SGSOV-Seismic Gas S/O Valve 6/11/2025 SGSOV Approved BRENDAN MORELLI
Final 6/13/2025 Conditional Approval BRENDAN MORELLI
Final 6/16/2025 OK to Issue CofO ROY SPAULDING