900 S FIGUEROA ST 90015

Certificate Information: 900 S FIGUEROA ST 90015

Application / Permit
06010-10000-00402
Plan Check / Job No.
B06LA00978
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
Phase I of the project to include: new 25 story live -work highrise (Type I) and 5 story live-work apartment (Type III-1hr.) both located above a common concrete podium deck elevated 3 stories above the street level serving retail and parking area (Type I). The building also has 4 levels of subterranean parking. ***See also foundation 06010-10001-00402. *****See comments for parking analysis.
Permit Issued
Issued on 8/11/2011
Issuing Office
Metro
Current Status
CofO Corrected on 11/5/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/10/2006 APPLICANT
Building Plans Picked Up 3/14/2006 APPLICANT
Assigned to Plan Check Engineer 4/21/2006 SEAN DANG
Corrections Issued 7/14/2006 SEAN DANG
Quality Review Completed 7/21/2006 LUIS SANCHEZ
Applicant returned to address corrections 7/21/2006 SEAN DANG
Applicant returned to address corrections 7/24/2006 LINCOLN LEE
Applicant returned to address corrections 8/14/2006 SEAN DANG
Applicant returned to address corrections 9/29/2006 SEAN DANG
Plan Check Approved 9/21/2007 SEAN DANG
Issued 9/21/2007 MAXX SKOULPHONG
TCO Issued 3/17/2010 RICKEY JACKSON
TCO Renewed 3/17/2010 RICKEY JACKSON
TCO Renewed 7/1/2010 RICKEY JACKSON
TCO Renewed 6/29/2011 RICKEY JACKSON
Issued 8/11/2011 MICHAEL MARTIN
TCO Issued 8/11/2011 MICHAEL MARTIN
TCO Renewed 8/11/2011 MICHAEL MARTIN
TCO Renewed 8/11/2011 MICHAEL MARTIN
TCO Renewed 8/11/2011 MICHAEL MARTIN
TCO Renewed 3/5/2012 RICKEY JACKSON
TCO Renewed 4/6/2012 RICKEY JACKSON
Issued 7/13/2012 RICKEY JACKSON
TCO Issued (Expire Date: 03-14-2013) 9/14/2012 RICKEY JACKSON
TCO Issued 9/25/2012 RICKEY JACKSON
TCO Renewed 9/25/2012 RICKEY JACKSON
TCO Issued (Expire Date: 07-14-2013) 1/14/2013 RICKEY JACKSON
Issued 2/16/2013 RICKEY JACKSON
TCO Issued (Expire Date: 09-14-2013) 3/14/2013 RICKEY JACKSON
TCO Issued (Expire Date: 01-10-2014) 7/14/2013 MICHAEL MARTIN
TCO Issued (Expire Date: 03-15-2014) 9/15/2013 RICKEY JACKSON
TCO Issued (Expire Date: 07-09-2014) 1/10/2014 RICKEY JACKSON
TCO Issued (Expire Date: 01-05-2015) 7/9/2014 HAMID PISHEHVAR
TCO Issued (Expire Date: 07-04-2015) 1/5/2015 HAMID PISHEHVAR
TCO Issued (Expire Date: 12-31-2015) 7/4/2015 RICKEY JACKSON
TCO Issued (Expire Date: 06-28-2016) 12/31/2015 RICKEY JACKSON
TCO Issued (Expire Date: 12-25-2016) 6/28/2016 RICKEY JACKSON
TCO Issued (Expire Date: 06-23-2017) 12/25/2016 HAMID PISHEHVAR
TCO Issued (Expire Date: 12-20-2017) 6/23/2017 HAMID PISHEHVAR
TCO Issued (Expire Date: 01-22-2019) 7/26/2018 RICKEY JACKSON
TCO Issued (Expire Date: 05-04-2022) 11/5/2021 ERNESTO CORRAL
TCO Issued (Expire Date: 11-23-2022) 5/27/2022 ERNESTO CORRAL
CofO in Progress 6/12/2023 GREGORY POMISH
CofO Issued-Status Void 6/12/2023 WINSTON DUNNING
Permit Finaled-Status Void 6/12/2023 WINSTON DUNNING
Re-Activate Permit 6/30/2023 WINSTON DUNNING
Permit Finaled 11/5/2024 ERNESTO CORRAL
CofO Corrected 11/5/2024 ERNESTO CORRAL
Permit Finaled 11/5/2024 ERNESTO CORRAL

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 5/30/2006 PAMELA TENEZA
Encroachment in public way Cleared 5/31/2006 JASON CHANG
Highway dedication Cleared 5/31/2006 ARMENIA HERNANDEZ
Work Adjacent to Public Way Cleared 5/31/2006 JASON CHANG
Address approval Cleared 6/27/2006 DAVID CHIN
Driveway location Cleared 6/28/2006 NAOMI LOMSKY
"D" conditions Cleared 6/29/2006 DWAYNE WYATT
Opn space landscape/Water mgmt Cleared 6/29/2006 DWAYNE WYATT
ZA Case Cleared 6/29/2006 DWAYNE WYATT
ZA Case Cleared 6/29/2006 DWAYNE WYATT
CPC Cleared 8/11/2006 EMMANUELA GUTIERREZ
"Q" conditions Cleared 8/17/2006 DAVID WEINTRAUB
Encroachment in public way Cleared 8/17/2006 ALFRED INGALLA
Frnt yard landscape/Water mgmt Cleared 8/17/2006 GREGORY SHOOP
Marquee approval - CUL Cleared 8/17/2006 HAROOT AVANESIAN
Project located in CRA area Cleared 8/28/2006 JIM URQUHART
Permit Cleared 8/31/2006 GREGG VANDERGRIFF
Roof/Waste drainage to street Cleared 8/31/2006 GREGG VANDERGRIFF
Metro Rail approval Cleared 9/6/2006 ASPET DAVIDIAN
DAS Clearance Cleared 9/7/2006 WAI LAU
Stormwater Pollution Mitigatn Cleared 9/7/2006 AMMAR ELTAWIL
Title 19 building approval Cleared 9/12/2006 GHASSEM NIKKHOO
Hydrant and Access approval Cleared 9/20/2006 TERRENCE O'CONNELL
Highway dedication Cleared 10/4/2006 EDITH FLORES
Miscellaneous Cleared 5/8/2007 LINCOLN LEE
Sewer availability Cleared 9/20/2007 NATALIE MOORE
Building over 3-story or 35-ft Cleared 9/21/2007 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 9/21/2007 CALOSHA APPROVED
Public Swimming Pool approval Cleared 9/21/2007 LACDHS APPROVED

Contact Information

Architect Duane, Sohl; Lic. No.: C30736 2102 W. BARRY      CHICAGO, IL 60618
Contractor Owner-Builder       ,
Engineer Ghodsi, Afshin; Lic. No.: S3248 10725 WELLWORTH AVE      LOS ANGELES, CA 90024
Engineer Mc, Cormick Charles Norman; Lic. No.: C32534 772 HUNT CIRCLE      CAMARILLO, CA 93012
Engineer Tatusian, Sarkis Vortik; Lic. No.: GE2118 24 VISTA DEL SOL      LAGUNA BEACH, CA 92651

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Shotcrete 9/26/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 9/27/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 9/28/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/1/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 10/1/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/2/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 10/2/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/3/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 10/3/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/4/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 10/4/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/9/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/11/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 10/11/2007 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 10/11/2007 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/12/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 10/12/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 10/15/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/16/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 10/16/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/17/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 10/17/2007 Conditional Approval JOHN ZOLNIKOV
Excavation/Setback/Form/Re-Bar 10/17/2007 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/18/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 10/18/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/19/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 10/19/2007 Conditional Approval JOHN ZOLNIKOV
Excavation/Setback/Form/Re-Bar 10/19/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 10/22/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/23/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 10/23/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/24/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 10/24/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/25/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 10/25/2007 Conditional Approval JOHN ZOLNIKOV
Excavation/Setback/Form/Re-Bar 10/25/2007 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/26/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 10/26/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/29/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 10/29/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/30/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 10/30/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 10/31/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 10/31/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 11/1/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 11/1/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 11/2/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 11/2/2007 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 11/2/2007 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 11/6/2007 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 11/6/2007 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 11/7/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 11/8/2007 Partial Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 11/8/2007 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 11/9/2007 No Access for Inspection WINSTON DUNNING
Footing/Foundation/Slab 11/13/2007 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 11/15/2007 Partial Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 11/16/2007 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 11/26/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 11/27/2007 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 11/27/2007 Approved JOHN ZOLNIKOV
Deputy Reinf. Concrete 11/28/2007 Conditional Approval JOHN ZOLNIKOV
Excavation/Setback/Form/Re-Bar 11/28/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 11/29/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 11/30/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 12/3/2007 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 12/3/2007 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 12/4/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 12/5/2007 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 12/5/2007 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 12/6/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 12/6/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 12/7/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 12/7/2007 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 12/11/2007 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 12/13/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 12/13/2007 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 12/13/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 12/17/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 12/17/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 12/17/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 12/18/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 12/18/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 12/18/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 12/19/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 12/19/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 12/19/2007 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 12/19/2007 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 12/20/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 12/20/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 12/20/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 12/21/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 12/21/2007 Conditional Approval JOHN ZOLNIKOV
Deputy Shotcrete 12/21/2007 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 12/21/2007 Partial Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 1/2/2008 Approved JOHN ZOLNIKOV
Footing/Foundation/Slab 1/8/2008 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 1/9/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 1/10/2008 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 1/10/2008 Approved JOHN ZOLNIKOV
Deputy Reinf. Concrete 1/11/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Drilled-In Anchors 1/14/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 1/14/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Drilled-In Anchors 1/15/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 1/15/2008 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 1/15/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Drilled-In Anchors 1/16/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 1/16/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Drilled-In Anchors 1/17/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 1/17/2008 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 1/17/2008 Partial Approval JOHN ZOLNIKOV
Deputy Drilled-In Anchors 1/18/2008 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 1/18/2008 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 1/22/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 1/23/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 1/24/2008 Conditional Approval JOHN ZOLNIKOV
Excavation/Setback/Form/Re-Bar 1/24/2008 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 1/25/2008 Conditional Approval JOHN ZOLNIKOV
Excavation/Setback/Form/Re-Bar 1/25/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 1/28/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 1/29/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 1/30/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 1/31/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 2/1/2008 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 2/5/2008 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 2/6/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 2/7/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 2/11/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 2/12/2008 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 2/12/2008 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 2/13/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 2/14/2008 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 2/14/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 2/15/2008 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 2/20/2008 Partial Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 2/22/2008 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 2/25/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 2/27/2008 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 2/27/2008 Corrections Issued JOHN ZOLNIKOV
Deputy Reinf. Concrete 2/28/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 2/29/2008 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 2/29/2008 Partial Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 3/3/2008 Partial Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 3/7/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 3/10/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 3/10/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 3/11/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 3/11/2008 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 3/11/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 3/12/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 3/12/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 3/13/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 3/13/2008 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 3/13/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 3/14/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 3/14/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 3/17/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 3/18/2008 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 3/18/2008 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 3/19/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 3/20/2008 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 3/20/2008 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 3/21/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 3/24/2008 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 3/24/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 3/25/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 3/25/2008 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 3/25/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 3/26/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 3/26/2008 Conditional Approval JOHN ZOLNIKOV
Special/Order Compliance 3/26/2008 Corrections Issued JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 3/27/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 3/27/2008 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 3/27/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 3/28/2008 Conditional Approval WILLIAM THOMPSON
Deputy Reinf. Concrete 3/28/2008 Conditional Approval WILLIAM THOMPSON
Deputy Reinf. Concrete 4/1/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 4/2/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 4/3/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 4/3/2008 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 4/3/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 4/4/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 4/4/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 4/7/2008 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 4/7/2008 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 4/8/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 4/9/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 4/10/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 4/10/2008 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 4/10/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 4/11/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 4/11/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 4/14/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 4/15/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 4/16/2008 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 4/17/2008 Conditional Approval JOHN ZOLNIKOV
Floor/Roof Diaphrgm/Shear Wall 4/17/2008 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 4/18/2008 Conditional Approval JOHN ZOLNIKOV
Excavation/Setback/Form/Re-Bar 4/18/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 4/21/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 4/21/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 4/22/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 4/22/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 4/23/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 4/23/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 4/24/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 4/24/2008 Conditional Approval JOHN ZOLNIKOV
Excavation/Setback/Form/Re-Bar 4/24/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 4/25/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 4/25/2008 Conditional Approval JOHN ZOLNIKOV
Excavation/Setback/Form/Re-Bar 4/25/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 4/28/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 4/28/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 4/29/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 4/29/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 4/30/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 4/30/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 5/1/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 5/1/2008 Conditional Approval JOHN ZOLNIKOV
Excavation/Setback/Form/Re-Bar 5/1/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 5/2/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 5/2/2008 Conditional Approval JOHN ZOLNIKOV
Excavation/Setback/Form/Re-Bar 5/2/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 5/5/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 5/5/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 5/6/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 5/6/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 5/7/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 5/7/2008 Conditional Approval JOHN ZOLNIKOV
Floor/Roof Diaphrgm/Shear Wall 5/7/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 5/8/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 5/8/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 5/9/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 5/9/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 5/12/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 5/12/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 5/13/2008 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 5/13/2008 Conditional Approval JOHN ZOLNIKOV
Floor/Roof Diaphrgm/Shear Wall 5/13/2008 Partial Inspection JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 5/14/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 5/14/2008 Conditional Approval JOHN ZOLNIKOV
Floor/Roof Diaphrgm/Shear Wall 5/14/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 5/15/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 5/15/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 5/16/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 5/16/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 5/19/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 5/20/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 5/20/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 5/21/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 5/21/2008 Conditional Approval JOHN ZOLNIKOV
Floor/Roof Diaphrgm/Shear Wall 5/21/2008 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 5/22/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 5/22/2008 Conditional Approval JOHN ZOLNIKOV
Floor/Roof Diaphrgm/Shear Wall 5/22/2008 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 5/23/2008 Conditional Approval WILLIAM THOMPSON
Deputy Reinf. Masonry 5/23/2008 Conditional Approval WILLIAM THOMPSON
Deputy Reinf. Concrete 5/27/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 5/28/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 5/28/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 5/29/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 5/29/2008 Conditional Approval JOHN ZOLNIKOV
Floor/Roof Diaphrgm/Shear Wall 5/29/2008 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 5/30/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 5/30/2008 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 5/30/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 6/2/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 6/2/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 6/2/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 6/3/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 6/3/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 6/3/2008 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 6/3/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 6/4/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 6/4/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 6/4/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 6/5/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 6/5/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 6/5/2008 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 6/5/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 6/6/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 6/6/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 6/6/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 6/9/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 6/9/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 6/10/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 6/10/2008 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 6/10/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 6/11/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 6/11/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 6/12/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 6/12/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 6/12/2008 Partial Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 6/12/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 6/13/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 6/13/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 6/16/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 6/17/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 6/18/2008 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 6/18/2008 Partial Approval JOHN ZOLNIKOV
Deputy Other (see comments) 6/19/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 6/19/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 6/20/2008 Conditional Approval JOHN ZOLNIKOV
Floor/Roof Diaphrgm/Shear Wall 6/20/2008 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 6/23/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 6/23/2008 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 6/23/2008 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 6/24/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 6/24/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 6/25/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 6/25/2008 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 6/25/2008 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 6/26/2008 Conditional Approval RICKEY JACKSON
Deputy Steel/Welding 6/26/2008 Conditional Approval RICKEY JACKSON
Deputy Reinf. Concrete 6/27/2008 Conditional Approval RICKEY JACKSON
Deputy Steel/Welding 6/27/2008 Conditional Approval RICKEY JACKSON
Deputy Reinf. Concrete 6/30/2008 Conditional Approval RICKEY JACKSON
Deputy Steel/Welding 6/30/2008 Conditional Approval RICKEY JACKSON
Deputy Reinf. Concrete 7/1/2008 Conditional Approval RICKEY JACKSON
Deputy Steel/Welding 7/1/2008 Conditional Approval RICKEY JACKSON
Footing/Foundation/Slab 7/1/2008 Partial Inspection WILLIAM THOMPSON
Deputy Reinf. Concrete 7/2/2008 Conditional Approval RICKEY JACKSON
Deputy Steel/Welding 7/2/2008 Conditional Approval RICKEY JACKSON
Footing/Foundation/Slab 7/2/2008 Partial Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/3/2008 Conditional Approval STEVE WEIS
Deputy Reinf. Masonry 7/3/2008 Conditional Approval STEVE WEIS
Deputy Steel/Welding 7/3/2008 Conditional Approval STEVE WEIS
Deputy Steel/Welding 7/7/2008 Conditional Approval RICKEY JACKSON
Light Gage Steel Frame 7/7/2008 Not Ready for Inspection RICKEY JACKSON
Deputy Steel/Welding 7/8/2008 Conditional Approval RICKEY JACKSON
Deputy Reinf. Concrete 7/9/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/9/2008 Conditional Approval JOHN ZOLNIKOV
Floor/Roof Diaphrgm/Shear Wall 7/9/2008 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 7/10/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/10/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 7/11/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/11/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 7/14/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 7/14/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 7/14/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 7/15/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 7/15/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 7/15/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/15/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 7/16/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 7/16/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 7/16/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/16/2008 Conditional Approval JOHN ZOLNIKOV
Floor/Roof Diaphrgm/Shear Wall 7/16/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 7/17/2008 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/17/2008 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 7/17/2008 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 7/17/2008 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 7/18/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 7/18/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 7/18/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/18/2008 Conditional Approval JOHN ZOLNIKOV
Floor/Roof Diaphrgm/Shear Wall 7/18/2008 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 7/21/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 7/21/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/21/2008 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 7/21/2008 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 7/21/2008 Partial Approval JOHN ZOLNIKOV
Light Gage Steel Frame 7/21/2008 Partial Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 7/22/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 7/22/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/22/2008 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 7/22/2008 Partial Inspection JOHN ZOLNIKOV
Deputy Reinf. Concrete 7/23/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 7/23/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/23/2008 Conditional Approval JOHN ZOLNIKOV
Floor/Roof Diaphrgm/Shear Wall 7/23/2008 Conditional Approval JOHN ZOLNIKOV
Light Gage Steel Frame 7/23/2008 Partial Inspection JOHN ZOLNIKOV
Deputy Reinf. Concrete 7/24/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 7/24/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/24/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 7/25/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 7/25/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/25/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 7/28/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/28/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 7/29/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 7/29/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 7/29/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/29/2008 Conditional Approval JOHN ZOLNIKOV
Drywall Nailing 7/29/2008 Partial Approval JOHN ZOLNIKOV
Floor/Roof Diaphrgm/Shear Wall 7/29/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 7/30/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 7/30/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 7/30/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/30/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 7/31/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 7/31/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 7/31/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 7/31/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 8/1/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/1/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 8/1/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/1/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 8/4/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/4/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 8/4/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 8/5/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/5/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 8/5/2008 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 8/5/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 8/6/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/6/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 8/6/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/6/2008 Conditional Approval JOHN ZOLNIKOV
Floor/Roof Diaphrgm/Shear Wall 8/6/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 8/7/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/7/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 8/7/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/7/2008 Conditional Approval JOHN ZOLNIKOV
Drywall Nailing 8/7/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 8/8/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/8/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 8/8/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/8/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 8/11/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/11/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 8/11/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/11/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 8/12/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/12/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 8/12/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/12/2008 Conditional Approval JOHN ZOLNIKOV
Drywall Nailing 8/12/2008 Partial Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 8/12/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 8/13/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/13/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 8/13/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/13/2008 Conditional Approval JOHN ZOLNIKOV
Light Gage Steel Frame 8/13/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 8/14/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/14/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 8/14/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/14/2008 Conditional Approval JOHN ZOLNIKOV
Floor/Roof Diaphrgm/Shear Wall 8/14/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 8/15/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/15/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 8/15/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/15/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 8/18/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/18/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 8/18/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/18/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 8/19/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/19/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 8/19/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/19/2008 Conditional Approval JOHN ZOLNIKOV
Floor/Roof Diaphrgm/Shear Wall 8/19/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 8/20/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/20/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 8/20/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/20/2008 Conditional Approval JOHN ZOLNIKOV
Drywall Nailing 8/20/2008 Partial Approval JOHN ZOLNIKOV
Insulation 8/20/2008 Partial Approval JOHN ZOLNIKOV
Wood Frame 8/20/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 8/21/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/21/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 8/21/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/21/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 8/22/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/22/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 8/22/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/22/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 8/25/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/25/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 8/25/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/25/2008 Conditional Approval JOHN ZOLNIKOV
Floor/Roof Diaphrgm/Shear Wall 8/25/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 8/27/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/27/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 8/27/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/27/2008 Conditional Approval JOHN ZOLNIKOV
Insulation 8/27/2008 Partial Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 8/28/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 8/28/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 8/28/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 8/28/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 8/29/2008 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/29/2008 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 8/29/2008 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 8/29/2008 Conditional Approval WINSTON DUNNING
Drywall Nailing 9/2/2008 Partial Approval JOHN ZOLNIKOV
Insulation 9/2/2008 Partial Approval JOHN ZOLNIKOV
Deputy Drilled-In Anchors 9/3/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 9/3/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 9/3/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 9/3/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 9/3/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Drilled-In Anchors 9/4/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 9/4/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 9/4/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 9/4/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 9/4/2008 Conditional Approval JOHN ZOLNIKOV
Footing/Foundation/Slab 9/4/2008 Partial Approval JOHN ZOLNIKOV
Deputy Drilled-In Anchors 9/5/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 9/5/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Concrete 9/5/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Reinf. Masonry 9/5/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Steel/Welding 9/5/2008 Conditional Approval JOHN ZOLNIKOV
Deputy Pre-Stress Concrete 9/8/2008 Conditional Approval WILLIAM THOMPSON
Deputy Reinf. Concrete 9/8/2008 Conditional Approval WILLIAM THOMPSON
Deputy Reinf. Masonry 9/8/2008 Conditional Approval WILLIAM THOMPSON
Deputy Pre-Stress Concrete 9/9/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 9/9/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 9/9/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 9/9/2008 Conditional Approval SAKO AGHAZARIAN
Footing/Foundation/Slab 9/9/2008 Partial Approval SAKO AGHAZARIAN
Deputy Pre-Stress Concrete 9/10/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 9/10/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 9/10/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 9/10/2008 Conditional Approval SAKO AGHAZARIAN
Drywall Nailing 9/10/2008 Partial Inspection SAKO AGHAZARIAN
Deputy Pre-Stress Concrete 9/11/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 9/11/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 9/11/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 9/11/2008 Conditional Approval SAKO AGHAZARIAN
Footing/Foundation/Slab 9/11/2008 Partial Approval SAKO AGHAZARIAN
Deputy Pre-Stress Concrete 9/12/2008 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 9/12/2008 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 9/12/2008 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 9/12/2008 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 9/15/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 9/15/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 9/15/2008 Conditional Approval SAKO AGHAZARIAN
Drywall Nailing 9/15/2008 Partial Approval SAKO AGHAZARIAN
Insulation 9/15/2008 Not Ready for Inspection SAKO AGHAZARIAN
Deputy Pre-Stress Concrete 9/16/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 9/16/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 9/16/2008 Conditional Approval SAKO AGHAZARIAN
Wood Frame 9/16/2008 Partial Approval SAKO AGHAZARIAN
Deputy Pre-Stress Concrete 9/17/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 9/17/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 9/17/2008 Conditional Approval SAKO AGHAZARIAN
Footing/Foundation/Slab 9/17/2008 Partial Approval SAKO AGHAZARIAN
Deputy Pre-Stress Concrete 9/18/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 9/18/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 9/18/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Pre-Stress Concrete 9/19/2008 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 9/19/2008 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Masonry 9/19/2008 Conditional Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 9/22/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 9/22/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 9/22/2008 Conditional Approval SAKO AGHAZARIAN
Drywall Nailing 9/22/2008 Partial Inspection SAKO AGHAZARIAN
Deputy Pre-Stress Concrete 9/23/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 9/23/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 9/23/2008 Conditional Approval SAKO AGHAZARIAN
Wood Frame 9/23/2008 Partial Approval SAKO AGHAZARIAN
Deputy Pre-Stress Concrete 9/24/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 9/24/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 9/24/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 9/24/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Pre-Stress Concrete 9/25/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 9/25/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 9/25/2008 Conditional Approval SAKO AGHAZARIAN
Footing/Foundation/Slab 9/25/2008 Partial Approval SAKO AGHAZARIAN
Deputy Pre-Stress Concrete 9/26/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 9/26/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 9/26/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 9/29/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 9/29/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 9/30/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 9/30/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 10/1/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 10/1/2008 Conditional Approval SAKO AGHAZARIAN
Drywall Nailing 10/1/2008 Partial Inspection SAKO AGHAZARIAN
Wood Frame 10/1/2008 Partial Inspection SAKO AGHAZARIAN
Deputy Reinf. Masonry 10/2/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 10/2/2008 Conditional Approval SAKO AGHAZARIAN
Wood Frame 10/2/2008 Partial Inspection SAKO AGHAZARIAN
Deputy Reinf. Masonry 10/3/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 10/3/2008 Conditional Approval SAKO AGHAZARIAN
Footing/Foundation/Slab 10/3/2008 Partial Approval SAKO AGHAZARIAN
Wood Frame 10/3/2008 Partial Inspection SAKO AGHAZARIAN
Deputy Steel/Welding 10/6/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 10/7/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 10/8/2008 Conditional Approval SAKO AGHAZARIAN
Drywall Nailing 10/8/2008 Partial Approval SAKO AGHAZARIAN
Deputy Steel/Welding 10/9/2008 Conditional Approval SAKO AGHAZARIAN
Drywall Nailing 10/9/2008 Partial Approval SAKO AGHAZARIAN
Deputy Steel/Welding 10/10/2008 Conditional Approval SAKO AGHAZARIAN
Drywall Nailing 10/10/2008 Partial Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 10/14/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 10/14/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 10/14/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 10/16/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 10/16/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 10/16/2008 Conditional Approval SAKO AGHAZARIAN
Drywall Nailing 10/16/2008 Partial Approval SAKO AGHAZARIAN
Drywall Nailing 10/16/2008 Partial Inspection SAKO AGHAZARIAN
Footing/Foundation/Slab 10/16/2008 Partial Approval SAKO AGHAZARIAN
Insulation 10/16/2008 Partial Inspection SAKO AGHAZARIAN
Wood Frame 10/16/2008 Partial Inspection SAKO AGHAZARIAN
Deputy Reinf. Concrete 10/17/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 10/17/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 10/17/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 10/20/2008 Conditional Approval JONATHAN ALLEN
Deputy Steel/Welding 10/20/2008 Conditional Approval JONATHAN ALLEN
Drywall Nailing 10/21/2008 Partial Approval SAKO AGHAZARIAN
Insulation 10/21/2008 Partial Inspection SAKO AGHAZARIAN
Light Gage Steel Frame 10/21/2008 Partial Inspection SAKO AGHAZARIAN
Footing/Foundation/Slab 10/22/2008 Partial Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 10/23/2008 Conditional Approval SAKO AGHAZARIAN
Wood Frame 10/23/2008 Partial Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 10/27/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 10/28/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 10/28/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 10/28/2008 Conditional Approval SAKO AGHAZARIAN
Footing/Foundation/Slab 10/28/2008 Partial Approval SAKO AGHAZARIAN
Light Gage Steel Frame 10/28/2008 Partial Inspection SAKO AGHAZARIAN
Deputy Reinf. Concrete 10/29/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 10/29/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 10/29/2008 Conditional Approval SAKO AGHAZARIAN
Insulation 10/29/2008 Partial Inspection SAKO AGHAZARIAN
Light Gage Steel Frame 10/29/2008 Partial Inspection SAKO AGHAZARIAN
Deputy Reinf. Concrete 10/30/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 10/30/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 10/30/2008 Conditional Approval SAKO AGHAZARIAN
Light Gage Steel Frame 10/30/2008 Partial Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 10/31/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 10/31/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 10/31/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 11/4/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 11/4/2008 Conditional Approval SAKO AGHAZARIAN
Footing/Foundation/Slab 11/4/2008 Partial Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 11/5/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 11/5/2008 Conditional Approval SAKO AGHAZARIAN
Drywall Nailing 11/5/2008 Partial Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 11/6/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 11/6/2008 Conditional Approval SAKO AGHAZARIAN
Drywall Nailing 11/6/2008 Partial Inspection SAKO AGHAZARIAN
Insulation 11/6/2008 Partial Inspection SAKO AGHAZARIAN
Wood Frame 11/6/2008 Partial Inspection SAKO AGHAZARIAN
Deputy Reinf. Masonry 11/7/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 11/7/2008 Conditional Approval SAKO AGHAZARIAN
Insulation 11/14/2008 Partial Approval SAKO AGHAZARIAN
Light Gage Steel Frame 11/14/2008 Partial Approval SAKO AGHAZARIAN
Drywall Nailing 11/18/2008 Partial Approval SAKO AGHAZARIAN
Insulation 11/18/2008 Partial Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 11/19/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 11/19/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 11/20/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 11/20/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 11/21/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 11/21/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 11/25/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 11/25/2008 Conditional Approval SAKO AGHAZARIAN
Insulation 11/25/2008 Partial Approval SAKO AGHAZARIAN
Light Gage Steel Frame 11/25/2008 Partial Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 11/26/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 11/26/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 12/1/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 12/1/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 12/2/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 12/2/2008 Conditional Approval SAKO AGHAZARIAN
Footing/Foundation/Slab 12/2/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 12/3/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 12/3/2008 Conditional Approval SAKO AGHAZARIAN
Footing/Foundation/Slab 12/3/2008 Partial Inspection SAKO AGHAZARIAN
Deputy Reinf. Masonry 12/4/2008 Conditional Approval JONATHAN ALLEN
Deputy Steel/Welding 12/4/2008 Conditional Approval JONATHAN ALLEN
Light Gage Steel Frame 12/4/2008 Partial Approval JONATHAN ALLEN
Deputy Reinf. Masonry 12/5/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 12/5/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 12/9/2008 Conditional Approval SAKO AGHAZARIAN
Wood Frame 12/9/2008 Partial Inspection SAKO AGHAZARIAN
Deputy Steel/Welding 12/10/2008 Conditional Approval SAKO AGHAZARIAN
Insulation 12/10/2008 Partial Approval SAKO AGHAZARIAN
Light Gage Steel Frame 12/10/2008 Partial Approval SAKO AGHAZARIAN
Deputy Steel/Welding 12/11/2008 Conditional Approval SAKO AGHAZARIAN
Footing/Foundation/Slab 12/11/2008 Partial Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 12/12/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 12/12/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 12/22/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 12/23/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 12/24/2008 Conditional Approval SAKO AGHAZARIAN
Footing/Foundation/Slab 12/24/2008 Not Ready for Inspection SAKO AGHAZARIAN
Insulation 12/24/2008 Not Ready for Inspection SAKO AGHAZARIAN
Light Gage Steel Frame 12/24/2008 Not Ready for Inspection SAKO AGHAZARIAN
Wood Frame 12/24/2008 Not Ready for Inspection SAKO AGHAZARIAN
Deputy Reinf. Masonry 12/26/2008 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 12/31/2008 Conditional Approval SAKO AGHAZARIAN
Drywall Nailing 1/7/2009 Partial Approval SAKO AGHAZARIAN
Insulation 1/7/2009 Conditional Approval SAKO AGHAZARIAN
Interior/Exterior Lathing 1/7/2009 Partial Approval SAKO AGHAZARIAN
Wood Frame 1/7/2009 Partial Approval SAKO AGHAZARIAN
Drywall Nailing 1/8/2009 Conditional Approval SAKO AGHAZARIAN
Insulation 1/8/2009 Conditional Approval SAKO AGHAZARIAN
Light Gage Steel Frame 1/8/2009 Partial Approval SAKO AGHAZARIAN
Footing/Foundation/Slab 1/9/2009 Partial Approval SAKO AGHAZARIAN
Insulation 1/9/2009 Partial Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 1/13/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 1/13/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 1/14/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 1/14/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 1/15/2009 Conditional Approval JONATHAN ALLEN
Deputy Steel/Welding 1/15/2009 Conditional Approval JONATHAN ALLEN
Drywall Nailing 1/15/2009 Partial Approval JONATHAN ALLEN
Insulation 1/15/2009 Partial Approval JONATHAN ALLEN
Deputy Reinf. Masonry 1/16/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 1/16/2009 Conditional Approval SAKO AGHAZARIAN
Drywall Nailing 1/16/2009 Partial Approval SAKO AGHAZARIAN
Insulation 1/16/2009 Partial Approval SAKO AGHAZARIAN
Insulation 1/21/2009 Partial Approval SAKO AGHAZARIAN
Wood Frame 1/21/2009 Partial Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 1/22/2009 Conditional Approval SAKO AGHAZARIAN
Drywall Nailing 1/22/2009 Partial Approval SAKO AGHAZARIAN
Insulation 1/22/2009 Partial Approval SAKO AGHAZARIAN
Wood Frame 1/22/2009 Partial Approval SAKO AGHAZARIAN
Drywall Nailing 1/23/2009 Partial Approval SAKO AGHAZARIAN
Insulation 1/23/2009 Partial Approval SAKO AGHAZARIAN
Wood Frame 1/23/2009 Partial Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 1/26/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 1/26/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 1/27/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 1/27/2009 Conditional Approval SAKO AGHAZARIAN
Drywall Nailing 1/27/2009 Partial Approval SAKO AGHAZARIAN
Insulation 1/27/2009 Partial Approval SAKO AGHAZARIAN
Wood Frame 1/27/2009 Partial Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 1/28/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 1/28/2009 Conditional Approval SAKO AGHAZARIAN
Insulation 1/28/2009 Partial Approval SAKO AGHAZARIAN
Wood Frame 1/28/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 1/29/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 1/29/2009 Conditional Approval SAKO AGHAZARIAN
Insulation 1/29/2009 Partial Approval SAKO AGHAZARIAN
Wood Frame 1/29/2009 Partial Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 1/30/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 1/30/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 2/3/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 2/3/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 2/4/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 2/4/2009 Conditional Approval SAKO AGHAZARIAN
Drywall Nailing 2/4/2009 Partial Approval SAKO AGHAZARIAN
Insulation 2/4/2009 Partial Approval SAKO AGHAZARIAN
Wood Frame 2/4/2009 Partial Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 2/5/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 2/5/2009 Conditional Approval SAKO AGHAZARIAN
Wood Frame 2/5/2009 Partial Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 2/6/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 2/6/2009 Conditional Approval SAKO AGHAZARIAN
Drywall Nailing 2/6/2009 Partial Approval SAKO AGHAZARIAN
Insulation 2/6/2009 Partial Approval SAKO AGHAZARIAN
Wood Frame 2/6/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 2/9/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 2/10/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 2/11/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 2/12/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 2/13/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 2/17/2009 Conditional Approval SAKO AGHAZARIAN
Drywall Nailing 2/17/2009 Partial Approval SAKO AGHAZARIAN
Insulation 2/17/2009 Partial Approval SAKO AGHAZARIAN
Deputy Steel/Welding 2/18/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 2/18/2009 Partial Approval SAKO AGHAZARIAN
Drywall Nailing 2/18/2009 Partial Approval SAKO AGHAZARIAN
Insulation 2/18/2009 Conditional Approval SAKO AGHAZARIAN
Wood Frame 2/18/2009 Partial Approval SAKO AGHAZARIAN
Deputy Steel/Welding 2/19/2009 Conditional Approval JOHN CARPENTER
Deputy Steel/Welding 2/20/2009 Conditional Approval JOHN CARPENTER
Deputy Steel/Welding 2/23/2009 Conditional Approval JOHN CARPENTER
Deputy Steel/Welding 2/24/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 2/25/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 2/26/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 2/27/2009 Conditional Approval SAKO AGHAZARIAN
Drywall Nailing 2/27/2009 Partial Approval SAKO AGHAZARIAN
Insulation 2/27/2009 Partial Approval SAKO AGHAZARIAN
Light Gage Steel Frame 2/27/2009 Partial Approval SAKO AGHAZARIAN
Wood Frame 2/27/2009 Partial Approval SAKO AGHAZARIAN
Deputy Steel/Welding 3/2/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 3/3/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 3/4/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 3/5/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 3/6/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 3/9/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 3/10/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 3/11/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 3/12/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 3/13/2009 Conditional Approval SAKO AGHAZARIAN
Insulation 3/13/2009 Partial Approval SAKO AGHAZARIAN
Wood Frame 3/13/2009 Partial Approval SAKO AGHAZARIAN
Insulation 3/20/2009 Partial Approval SAKO AGHAZARIAN
Structural Steel Frame 3/20/2009 Partial Approval SAKO AGHAZARIAN
Wood Frame 3/20/2009 Partial Approval SAKO AGHAZARIAN
Drywall Nailing 3/25/2009 Partial Approval SAKO AGHAZARIAN
Insulation 3/25/2009 Partial Approval SAKO AGHAZARIAN
Drywall Nailing 3/26/2009 Partial Approval SAKO AGHAZARIAN
Insulation 3/26/2009 Partial Approval SAKO AGHAZARIAN
Wood Frame 3/26/2009 Partial Approval SAKO AGHAZARIAN
Drywall Nailing 3/27/2009 Partial Approval SAKO AGHAZARIAN
Wood Frame 3/27/2009 Partial Approval SAKO AGHAZARIAN
Drywall Nailing 4/1/2009 Partial Approval SAKO AGHAZARIAN
Insulation 4/1/2009 Partial Approval SAKO AGHAZARIAN
Drywall Nailing 4/2/2009 Partial Inspection STEPHEN REED
Drywall Nailing 4/9/2009 Partial Approval STEPHEN REED
Insulation 4/9/2009 Partial Inspection STEPHEN REED
Light Gage Steel Frame 4/9/2009 Conditional Approval STEPHEN REED
Insulation 4/10/2009 Partial Inspection STEPHEN REED
Interior/Exterior Lathing 4/10/2009 Partial Approval STEPHEN REED
Light Gage Steel Frame 4/10/2009 Partial Inspection STEPHEN REED
Drywall Nailing 4/15/2009 Partial Approval SAKO AGHAZARIAN
Drywall Nailing 4/22/2009 Partial Approval SAKO AGHAZARIAN
Insulation 4/22/2009 Partial Approval SAKO AGHAZARIAN
Light Gage Steel Frame 4/22/2009 Partial Approval SAKO AGHAZARIAN
Wood Frame 4/24/2009 Partial Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 4/27/2009 Conditional Approval SAKO AGHAZARIAN
Light Gage Steel Frame 4/29/2009 Partial Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 5/1/2009 Conditional Approval SAKO AGHAZARIAN
Drywall Nailing 5/6/2009 Partial Approval SAKO AGHAZARIAN
Light Gage Steel Frame 5/6/2009 Partial Approval SAKO AGHAZARIAN
Drywall Nailing 5/8/2009 Partial Approval SAKO AGHAZARIAN
Light Gage Steel Frame 5/8/2009 Partial Approval SAKO AGHAZARIAN
Light Gage Steel Frame 5/14/2009 Partial Approval SAKO AGHAZARIAN
Drywall Nailing 5/22/2009 Partial Inspection SAKO AGHAZARIAN
Insulation 5/22/2009 Partial Inspection SAKO AGHAZARIAN
Light Gage Steel Frame 5/22/2009 Partial Inspection SAKO AGHAZARIAN
Drywall Nailing 6/3/2009 Partial Inspection SAKO AGHAZARIAN
Interior/Exterior Lathing 6/3/2009 Partial Inspection SAKO AGHAZARIAN
Light Gage Steel Frame 6/3/2009 Partial Inspection SAKO AGHAZARIAN
Excavation/Setback/Form/Re-Bar 6/10/2009 Partial Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 6/11/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 6/19/2009 Conditional Approval SAKO AGHAZARIAN
Drywall Nailing 6/26/2009 Partial Approval SAKO AGHAZARIAN
Wood Frame 6/26/2009 Partial Approval SAKO AGHAZARIAN
T-Bar Ceiling 7/13/2009 Partial Inspection SAKO AGHAZARIAN
Deputy Drilled-In Anchors 8/11/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 8/11/2009 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Masonry 8/11/2009 Conditional Approval SAKO AGHAZARIAN
Final 8/13/2009 Partial Inspection SAKO AGHAZARIAN
Final 8/18/2009 Partial Inspection SAKO AGHAZARIAN
Light Gage Steel Frame 8/25/2009 Partial Approval SAKO AGHAZARIAN
Final 8/27/2009 Partial Inspection SAKO AGHAZARIAN
Drywall Nailing 8/31/2009 Partial Approval SAKO AGHAZARIAN
Insulation 8/31/2009 Partial Approval SAKO AGHAZARIAN
Light Gage Steel Frame 8/31/2009 Partial Approval SAKO AGHAZARIAN
Final 9/1/2009 Partial Approval SAKO AGHAZARIAN
Drywall Nailing 2/18/2010 Partial Approval SAKO AGHAZARIAN
METHANE-Rough 2/18/2010 Conditional Approval SAKO AGHAZARIAN
Reinforced Masonry Frame 2/18/2010 Not Ready for Inspection SAKO AGHAZARIAN
SWPPP-Const. Storm Water 2/18/2010 Completed SAKO AGHAZARIAN
Deputy Reinf. Concrete 3/1/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 3/2/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 3/3/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 3/4/2010 Conditional Approval JOHN CARPENTER
Deputy Reinf. Concrete 3/8/2010 Conditional Approval SAKO AGHAZARIAN
Special/Order Compliance 3/8/2010 No Access for Inspection JERROLD GROSS
Deputy Reinf. Concrete 3/9/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 3/10/2010 Conditional Approval SAKO AGHAZARIAN
Insulation 3/10/2010 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 3/11/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 3/17/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 3/18/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 3/30/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 3/31/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 4/1/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 4/8/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 4/12/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 4/13/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 4/13/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 4/14/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 4/14/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 4/15/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 4/15/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Drilled-In Anchors 4/19/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 4/19/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Drilled-In Anchors 4/20/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 4/20/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Drilled-In Anchors 4/21/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 4/21/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Drilled-In Anchors 4/22/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 4/22/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 4/26/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 4/27/2010 Conditional Approval SAKO AGHAZARIAN
Special/Order Compliance 4/27/2010 Approved JERROLD GROSS
Deputy Reinf. Concrete 4/28/2010 Partial Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 4/29/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Shotcrete 4/29/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 5/3/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 5/4/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 5/5/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 5/6/2010 Conditional Approval SAKO AGHAZARIAN
Drywall Nailing 5/10/2010 Approved SAKO AGHAZARIAN
Special/Order Compliance 5/10/2010 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 5/18/2010 Conditional Approval SAKO AGHAZARIAN
Footing/Foundation/Slab 5/18/2010 Partial Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 5/19/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 5/20/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 5/24/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 5/25/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 5/26/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Steel/Welding 5/27/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 6/1/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 6/8/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 6/15/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 6/17/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 6/22/2010 Conditional Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 6/24/2010 Conditional Approval SAKO AGHAZARIAN
Pre-Inspection 6/24/2010 Approved SAKO AGHAZARIAN
Special/Order Compliance 6/24/2013 Approved SAKO AGHAZARIAN
Special/Order Compliance 8/20/2013 Approved SAKO AGHAZARIAN
Special/Order Compliance 12/18/2013 Approved SAKO AGHAZARIAN
Special/Order Compliance 2/19/2014 Approved SAKO AGHAZARIAN
Special/Order Compliance 6/10/2014 Approved SAKO AGHAZARIAN
Special/Order Compliance 12/16/2014 Approved SAKO AGHAZARIAN
Special/Order Compliance 6/8/2015 Approved SAKO AGHAZARIAN
Special/Order Compliance 12/3/2015 Approved SAKO AGHAZARIAN
Special/Order Compliance 6/3/2016 Approved SAKO AGHAZARIAN
Special/Order Compliance 11/30/2016 Approved SAKO AGHAZARIAN
Special/Order Compliance 5/31/2017 Approved SAKO AGHAZARIAN
Special/Order Compliance 12/31/2018 Partial Inspection LESLIE TRUJILLO
Special/Order Compliance 4/20/2022 Approved ERNESTO CORRAL
Special/Order Compliance 11/9/2022 Approved TED RIES
Special/Order Compliance 5/25/2023 Partial Inspection GREGORY POMISH